| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 CrAdmitted-Finance 710 SPOT 18 7TH FLOOR PIMPLE SAUDAGAR PUNE | PUNE | PUNE | MAHARASHTRA | ₹19.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹19.7 Cr+₹16.9 L (0.87%)Admitted-Finance B 301 KAPIL UPAVAN BIBWEWADI PUNE 411037 | PUNE | PUNE | MAHARASHTRA | 411037 | ₹19.7 Cr+₹16.9 L (0.87%) | L2 | Admitted-Finance |
| 3 | L3₹20.5 Cr+₹97.0 L (4.96%)Admitted-Finance | ₹20.5 Cr+₹97.0 L (4.96%) | L3 | Admitted-Finance |
| 4 | L4₹21.8 Cr+₹2.2 Cr (11.4%)Admitted-Finance SHANTI JEEVAN P W D 23 10 PIMPRI PUNE 411017 | PUNE | MAHARASHTRA | 411017 | ₹21.8 Cr+₹2.2 Cr (11.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N P Infraprojects Pvt Ltd L2 | Dhaneshwar construction .Pvt.Ltd L4 | Shree Associates Infraventures Limited L1 | D.G.BELHEKAR INFRA PVT LTD L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | A1) Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 milimetre, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 milimetre in thickness. | 8,800 | One Square Metre | 12.6 ₹1,10,880 Lowest | 12.6 ₹1,10,880 Lowest | 12.6 ₹1,10,880 Lowest | 12.6 ₹1,10,880 Lowest |
| 2.00 | A2) Excavation for roadway in earth soil of all sorts, sand, gravel or soft murum including dressing section to the required grade camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 3,579.23 | One Cubic Metre | 125 ₹4,47,403.75 Lowest | 125 ₹4,47,403.75 Lowest | 125 ₹4,47,403.75 Lowest | 125 ₹4,47,403.75 Lowest |
| 3.00 | A3) Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 2,326.5 | One Cubic Metre | 146 ₹3,39,669 Lowest | 146 ₹3,39,669 Lowest | 146 ₹3,39,669 Lowest | 146 ₹3,39,669 Lowest |
| 4.00 | A4) Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 59.65 | One Cubic Metre | 1,490 ₹88,878.5 Lowest | 1,490 ₹88,878.5 Lowest | 1,490 ₹88,878.5 Lowest | 1,490 ₹88,878.5 Lowest |
| 5.00 | A5) Carrying out roughness index/ road unevenness test with car mounted/ jeep towed ARUR machine (Automatic road unevenness Recorder), Calibrated from Central Road Research Institute, New Delhi or any other equivalent authority including taking observations, feeding data and giving computerized test result including hire charges of all machinery and labour completed for Road surface (Black Top/ Water Bound Macadam) 5.5 metre to 7.00 metre width. Rate as per Highway Research Division No. 1, Maharashtra Engineering Research Institute, Nashik-4 | 5.5 | One Kilometre | 1,205 ₹6,627.5 Lowest | 1,205.4 ₹6,629.7 | 1,205.4 ₹6,629.7 | 1,205.4 ₹6,629.7 |
| 6.00 | A6) Excavation for catch/ side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 950.4 | One Cubic Metre | 125 ₹1,18,800 Lowest | 125 ₹1,18,800 Lowest | 125 ₹1,18,800 Lowest | 125 ₹1,18,800 Lowest |
| 7.00 | A7) Excavation for catch/ side water gutter in hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 1,306.8 | One Cubic Metre | 146 ₹1,90,792.8 Lowest | 146 ₹1,90,792.8 Lowest | 146 ₹1,90,792.8 Lowest | 146 ₹1,90,792.8 Lowest |
| 8.00 | A8) Excavation for catch/ side water gutter in soft rock strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable stuff as directed. | 95.04 | One Cubic Metre | 218.4 ₹20,756.74 Lowest | 218.4 ₹20,756.74 Lowest | 218.4 ₹20,756.74 Lowest | 218.4 ₹20,756.74 Lowest |
| 9.00 | A9) Excavation for catch/ side water gutter in hard rock strata to the specified section including stacking the excavated stuff in a regular bund by chieselling and wedging and disposing of unsuitable stuff as directed. | 23.76 | One Cubic Metre | 1,490 ₹35,402.4 Lowest | 1,490 ₹35,402.4 Lowest | 1,490 ₹35,402.4 Lowest | 1,490 ₹35,402.4 Lowest |
| 10.00 | A10) Clearing grass and removal of rubbish up to a distance of 50 metre outside the periphery of the area . | 30,250 | One Square Metre | 4.2 ₹1,27,050 Lowest | 4.2 ₹1,27,050 Lowest | 4.2 ₹1,27,050 Lowest | 4.2 ₹1,27,050 Lowest |
Tender Value
₹19.1 Cr
EMD Value
₹9.6 L
Closing Date
18 Sept 2026, 6:15 pmClosed
Executive Engineer.P.W.North Division Pune-1
Executive Engineer.P.W.North Division Pune-1
A) Improvements to Bhimashankar pilgrimage connecting road - Vandre Amboli Pait Shiroli Road MDR- 16 K.M. 12/500 to 18/00 Tal. Khed Dist. Pune ( Part - Satkarwadi to Hedruj) B) Improvements to Bhimashankar pilgrimage connecting road - Vandre Amboli P
2026_PWDRP_1337732_1
Northpune/2026-27/23
Open Tender
Civil Works - Roads
Item Rate
90 days
Khed Rajgurunagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,540
₹9.6 L
Chief Engineer P.W.REGION PUNE on 15.9.2026 at 12.
21 Sept 2026
10 Sept 2026
21 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A1) Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 milimetre, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 milimetre in thickness. | 8,800 | One Square Metre | - | - |
| 2 | A2) Excavation for roadway in earth soil of all sorts, sand, gravel or soft murum including dressing section to the required grade camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 3,579.23 | One Cubic Metre | - | - |
| 3 | A3) Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 2,326.5 | One Cubic Metre | - | - |
| 4 | A4) Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 59.65 | One Cubic Metre | - | - |
| 5 | A5) Carrying out roughness index/ road unevenness test with car mounted/ jeep towed ARUR machine (Automatic road unevenness Recorder), Calibrated from Central Road Research Institute, New Delhi or any other equivalent authority including taking observations, feeding data and giving computerized test result including hire charges of all machinery and labour completed for Road surface (Black Top/ Water Bound Macadam) 5.5 metre to 7.00 metre width. Rate as per Highway Research Division No. 1, Maharashtra Engineering Research Institute, Nashik-4 | 5.5 | One Kilometre | - | - |
| 6 | A6) Excavation for catch/ side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 950.4 | One Cubic Metre | - | - |
| 7 | A7) Excavation for catch/ side water gutter in hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 1,306.8 | One Cubic Metre | - | - |
| 8 | A8) Excavation for catch/ side water gutter in soft rock strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable stuff as directed. | 95.04 | One Cubic Metre | - | - |
| 9 | A9) Excavation for catch/ side water gutter in hard rock strata to the specified section including stacking the excavated stuff in a regular bund by chieselling and wedging and disposing of unsuitable stuff as directed. | 23.76 | One Cubic Metre | - | - |
| 10 | A10) Clearing grass and removal of rubbish up to a distance of 50 metre outside the periphery of the area . | 30,250 | One Square Metre | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
232.pdf
Tender Documents • 22.01 MB
BOQ_2287573.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .