Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | ₹7.5 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | Sri Vijayalakshmi Construction L2 | Varsha Group of Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earth excavation in ORDINARY SOIL (SS20B) and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil ect complete in standard specification. | 76.1 | cum | 111.76 ₹8,504.94 | 109.85 ₹8,359.59 |
| 2.00 | Cement concrete 1:4:8 (one cement, Four sand and Eight stone jelly) using 40mm gauge hard broken granite stone jelly for flooring including consolidating as per standard specification, rendering the top rough to take the floor finish and curing etc., complete and complying with standard specification. | 38.05 | cum | 5,543.41 ₹2.1 L | 5,448.47 ₹2.1 L |
| 3.00 | Supplying and erecting steel centering including necessary supports for plane surfaces in foundation and basement for reinforced cement concrete works such as column footings, plinth beam, grade beam, stair case steps, bed blocks etc. which require only normal strutting using M.S. sheets of size 90cm x60cm BG 10 gauge of stiffened with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak joists of size 10 x 6.50cm spaced at about 90 cm centre to centre and supported by the casurina props of 10cm to 13cm dia spaced at 75cm centre to centre at suitable intervals etc. complying with standard specification. (The payment for centering shall be made only after the concrete is laid. The retrieved materials should be taken back by the contractor) | 17.3 | cum | 331.33 ₹5,732.01 | 325.65 ₹5,633.75 |
| 4.00 | Cement Concrete 1:1½:3 (One cement, one and half sand and three stone jelly) using 20 mm gauge hard granite broken stone jelly for all reinforced cement concrete works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrator, finishing, curing, etc. complete as directed by the Departmental Officers | 38.05 | cum | 7,569.03 ₹2.9 L | 7,439.4 ₹2.8 L |
| 5.00 | Supply and delivery of Bitumen pad including Labour Charges., | 5.5 | sqm | 418.59 ₹2,302.25 | 411.42 ₹2,262.81 |
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
12 Feb 2026, 3:00 pmClosed
COMMISSIONER
NAMAKKAL CITY MUNICIPAL CORPORATION
Providing CC road at Maharishi Nagar in Ward no. 01.
2026_MAWS_653277_9
7654/2025/E1
Open Tender
Civil Works
NAMAKKAL CITY MUNICIPAL CORPORATION
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,000
13 Apr 2026
9 Feb 2026
12 Feb 2026
9 Feb 2026
12 Feb 2026
9 Feb 2026
Earth excavation in ORDINARY SOIL (SS20B) and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil ect complete in standard specification.
Cement concrete 1:4:8 (one cement, Four sand and Eight stone jelly) using 40mm gauge hard broken granite stone jelly for flooring including consolidating as per standard specification, rendering the top rough to take the floor finish and curing etc., complete and complying with standard specification.
Supplying and erecting steel centering including necessary supports for plane surfaces in foundation and basement for reinforced cement concrete works such as column footings, plinth beam, grade beam, stair case steps, bed blocks etc. which require only normal strutting using M.S. sheets of size 90cm x60cm BG 10 gauge of stiffened with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak joists of size 10 x 6.50cm spaced at about 90 cm centre to centre and supported by the casurina props of 10cm to 13cm dia spaced at 75cm centre to centre at suitable intervals etc. complying with standard specification. (The payment for centering shall be made only after the concrete is laid. The retrieved materials should be taken back by the contractor)
Cement Concrete 1:1½:3 (One cement, one and half sand and three stone jelly) using 20 mm gauge hard granite broken stone jelly for all reinforced cement concrete works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrator, finishing, curing, etc. complete as directed by the Departmental Officers
Supply and delivery of Bitumen pad including Labour Charges.,
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_783737.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid