Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
14 Feb 2022, 3:00 pmClosed
PR & CC
TENDER FOR CARRYING OUT HOT REPAIR OF 14.2KG AND 19KG LPG CYLINDERS FOR LPG
21000919-HD-10157
21000919-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
14 Feb 2022
24 Jan 2022
14 Feb 2022
14 Feb 2022
24 Jan 2022 - 31 Jan 2022
31 Jan 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | HOT REPAIR-14.2KG LPG- | HOT REPAIR-14.2KG LPG- — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. PALGHAT 14KG Manadatory: No | - | Each |
| 1 | HOT REPAIR-14.2KG LPG- | HOT REPAIR-14.2KG LPG- — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. MYSORE 14KG Manadatory: No | - | Each |
| 1 | HOT REPAIR-14.2KG LPG- | HOT REPAIR-14.2KG LPG- — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. HUBLI 14KG Manadatory: No | - | Each |
| 1 | HOT REPAIR-14.2KG LPG- | HOT REPAIR-14.2KG LPG- — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. YEDIYUR 19KG Manadatory: No | - | Each |
| 1 | HOT REPAIR-19KG LPG- | HOT REPAIR-19KG LPG- — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. HUBLI 19KG Manadatory: No | - | Each |
| 1 | HOT REPAIR- 19 KG LPG- | HOT REPAIR- 19 KG LPG- — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. MYSORE 19KG Manadatory: No | - | Each |
| 1 | HOT REPAIR- 19 KG LPG- | HOT REPAIR- 19 KG LPG- — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. PALGHAT 19KG Manadatory: No | - | Each |
| 1 | HOT REPAIR- 19 KG LPG- | HOT REPAIR- 19 KG LPG- — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21000919-HD-10157.pdf
TENDER_DOCUMENT • 11.10 MB
Download all tender documents and submit your bid