Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-Finance | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹19.9 L+₹18,113.01 (0.92%)Rejected-Finance | L2 | Rejected-Finance L2 bidder |
Tender Value
₹18.1 L
EMD Value
₹36,300
Closing Date
29 Nov 2025, 6:55 pmClosed
Executive Engineer
HPPWD DIVISION KOTKHAI
R/R Damages on Khanety Chhamb Barnog Km 0/00 to 2/340 C/o R/wall and B/wall at RD 0/110 to 0/140
2025_PWD_121684_21
KD-E-Tender/2025-26-7277-81 dtd 14-11-2025
Open Tender
Civil Works - Roads
Percentage
45 days
Kotkhai
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
₹36,300
20 Feb 2026
24 Nov 2025
1 Dec 2025
24 Nov 2025
29 Nov 2025
24 Nov 2025
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing & making Gabion structure with mechanically woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012 ,MORTH Clause 2500, of requred size, Mesh Type 10x12 (D=100mm with tolerance of = 2%) Zinic+coated, Mesh wire diameter 2.7/3.7mm, Mechanically edged/selvedged with paritions at every 1 m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD), supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing , all complete as per direction of Engineer-in-charge.
Backfilling /Filter media with granular material behind retaining wall/breast wall as per specification 1204.3.8 in a width of 600 mm. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_178431.xls
BOQ • 0.48 MB
22.pdf
Tender Documents • 4.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .