Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
22 Jun 2026, 6:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE ENGINEER PWD DIVISION BENESHWAR HQ ASPUR
EXECUTIVE ENGINEER PWD DIVISION BENESHWAR HQ ASPUR
Construction of BT Road fromTantiya (Dhudh Dairy) to Ramlal Shope
2026_CEPWD_568367_1
NIT05_2026-2027_PWD Dn.Beneshwar
Open Tender
Civil Works - Roads
120 days
BENESHWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER NIT
₹2.6 L
Yes
16 Jun 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | EARTH WORK
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means.
In area of non-thorny jungle | 1.02 | Hect. | 10,374 | ₹10,581.48 | BI01010001010000000000000515BI0100001112 |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 964.41 | cum | 25 | ₹24,110.25 | BI01010001010000000000000515BI0100001113 |
| 3 | Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per MoRTH Specification Clause 301.3.5 | 413.32 | cum | 36 | ₹14,879.52 | BI01010001010000000000000515BI0100001114 |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 7,660.82 | cum | 44 | ₹3,37,076.08 | BI01010001010000000000000515BI0100001115 |
| 5 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300- 1 and 300-2 as per MoRTH Specification Clause 305.3 | 9,038.55 | cum | 33 | ₹2,98,272.15 | BI01010001010000000000000515BI0100001116 |
| 6 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 1,516.38 | cum | 45 | ₹68,237.1 | BI01010001010000000000000515BI0100001117 |
| 7 | WBM & Hard Shoulder
Granular Sub-base with Well Graded Material (Table 400-1).By Mix in Place Method.Construction of granular sub-base by providing well graded material,
spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.For Grading II Material | 2,956.01 | Cum | 438 | ₹12,94,732.38 | BI01010001010000000000000515BI0100001118 |
| 8 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rollingwith smooth wheel roller80-100kNinstagestopropergradeandcamber,applying and brooming, stone screening & bindingmaterials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404. | 772.01 | Cum | 928 | ₹7,16,425.28 | BI01010001010000000000000515BI0100001119 |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rollingwith smooth wheel roller80-100kNinstagestopropergradeandcamber,applying and brooming, stone screening to fill-up the interstices of coarse aggregate,wateringandcompactingtotherequireddensityGrading2 as per MoRTH Specification Clause 404. using Crusher borken aggregate | 772.01 | Cum | 1,002 | ₹7,73,554.02 | BI01010001010000000000000515BI0100001120 |
| 10 | BT & CC WORK
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 8,610.63 | Sqm. | 28 | ₹2,41,097.64 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.11 MB
Circular.pdf
Other Document • 6.99 MB
BOQ_1011112.xls
BOQ • 0.32 MB
RPWA100NEW.pdf
Tender Documents • 5.59 MB
Download all tender documents and submit your bid