Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
4 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer,Darjeeling Circle, GTA
OFFICE OF THE SUPERINTENDING ENGINEER DARJEELING CIRCLE Gorkha Ranga Manch Bhawan, 3rd Floor, Right Wing, Darjeeling 734101
Recovery and Reconstruction of Road from Pahila Gaon ( mirik Murmah Road) to Boberjee Gaon ( L-1.74 km
2026_GTA_5079155_5
NIeT_07 ( 1st Call)/SDRF/SE/DC/GTA/ 2026-2027 (Sl. No. 1 to 5)
Open Tender
CIVIL WORKS
Percentage
180 days
Mirik
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.9 L
12 Oct 2026
12 Oct 2026
13 Nov 2026
12 Oct 2026
4 Nov 2026
13 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Recovery and reconstruction of road from Palla Goan (Mirik-Murma h road) to Boberjee Goan under PGSD (II) Gram Panchayat (L = 1.74 Km) | |||||
| 1.01 | Land slide clearance in soil and ordinary rock by bulldozer; disposal on valley side | 287.82 | m3 | 61.8 | ₹17,787.28 |
| 1.02 | Landslide clearance in hard rock requiring blasting; disposal of boulders on valley side | 125.63 | m3 | 102.5 | ₹12,877.07 |
| 1.03 | Earthwork excavation in foundation trenches in all sorts of soil, excluding stone and moorum soil | 269.36 | m3 | 114 | ₹30,707.04 |
| 1.04 | Labour for laying 150–200 mm boulder soling, dressing, hand packing and ramming | 221.12 | m3 | 214.85 | ₹47,507.63 |
| 1.05 | Formwork and staging for abutment/retaining wall, up to 3 m clear span; including removal | 16.07 | m2 | 4,608 | ₹74,050.56 |
| 1.06 | Plum concrete (1:3:6) with 40 mm graded stone metal and 60% boulder stone | 308.19 | m3 | 3,304 | ₹10,18,259.76 |
| 1.07 | Formwork and staging for abutment/retaining wall, including stripping and removal | 335.19 | m2 | 214 | ₹71,730.66 |
| 1.08 | Rubble masonry in cement (6:1) with hard dressed stones from approved quarries | 525.25 | m2 | 3,739 | ₹19,63,909.75 |
| 1.09 | Dry rubble masonry with hard dressed stones from approved quarries | 225.1 | m3 | 2,450 | ₹5,51,495 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_5181435.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .