Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.9 L+₹2,400.84 (1.26%)Admitted-Finance MURAGACHI PURBA BARDHAMAN | PURBA BARDHAMAN | WEST BENGAL | L2 | Admitted-Finance | |
| 3 | L3₹2.0 L+₹7,202.52 (3.79%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S- ALAMINE ENTERPRISE L3 | SK CONSTRUCTION L2 | M/S. ABU CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Brick Aggregate (single size):50 mm nominal size | 22.96 | cum | 1,500 ₹34,433.1 Lowest | 1,500 ₹34,433.1 Lowest | 1,500 ₹34,433.1 Lowest |
| 2.00 | Moorum | 5.48 | cum | 117 ₹640.65 Lowest | 117 ₹640.65 Lowest | 117 ₹640.65 Lowest |
| 3.00 | Carriage of Carriage of Moorum | 5.48 | cum | 623 ₹3,411.3 Lowest | 623 ₹3,411.3 Lowest | 623 ₹3,411.3 Lowest |
| 4.00 | Loading unloading & stacking lime, moorum, building rubish and similar miscellaneous material | 5.48 | cum | 62 ₹339.49 Lowest | 62 ₹339.49 Lowest | 62 ₹339.49 Lowest |
| 5.00 | Polythene sheet (150 gm per sqm) | 42.12 | kg | 110 ₹4,633.2 Lowest | 110 ₹4,633.2 Lowest | 110 ₹4,633.2 Lowest |
| 6.00 | Stone Aggregate(single size): 10 mm nominal size | 11.79 | cum | 1,633 ₹19,258.95 Lowest | 1,633 ₹19,258.95 Lowest | 1,633 ₹19,258.95 Lowest |
| 7.00 | Stone Aggregate(single size):20 mm nominal size | 24.01 | cum | 2,100 ₹50,417.64 | 1,900 ₹45,615.96 | 1,800 ₹43,215.12 Lowest |
| 8.00 | Portland Cement | 17.18 | tonne | 57.17 ₹982.47 Lowest | 57.17 ₹982.47 Lowest | 57.17 ₹982.47 Lowest |
| 9.00 | Carriage of Stone aggregate below 40 mm nominal size | 35.8 | cum | 623.3 ₹22,315.39 Lowest | 623.3 ₹22,315.39 Lowest | 623.3 ₹22,315.39 Lowest |
| 10.00 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 35.8 | cum | 77 ₹2,756.75 Lowest | 77 ₹2,756.75 Lowest | 77 ₹2,756.75 Lowest |
Tender Value
₹2.9 L
EMD Value
₹5,750
Closing Date
23 Sept 2026, 3:00 pmClosed
Pradhan
Tanua GP
Construction of Cement Concrete Roads for Community from ICDS To Harisamaj at Mitinia
2026_ZPHD_5023372_1
NIT 2/5
Open Tender
CIVIL WORKS
Percentage
Mitinia
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
pradhan
₹5,750
Yes
2 Oct 2026
10 Sept 2026
25 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick Aggregate (single size):50 mm nominal size | 22.96 | cum | 1,500 | ₹34,433.1 |
| 2 | Moorum | 5.48 | cum | 117 | ₹640.65 |
| 3 | Carriage of Carriage of Moorum | 5.48 | cum | 623.3 | ₹3,412.94 |
| 4 | Loading unloading & stacking lime, moorum, building rubish and similar miscellaneous material | 5.48 | cum | 62 | ₹339.49 |
| 5 | Polythene sheet (150 gm per sqm) | 42.12 | kg | 110 | ₹4,633.2 |
| 6 | Stone Aggregate(single size): 10 mm nominal size | 11.79 | cum | 1,633 | ₹19,258.95 |
| 7 | Stone Aggregate(single size):20 mm nominal size | 24.01 | cum | 1,800 | ₹43,215.12 |
| 8 | Portland Cement | 17.19 | tonne | 5,717 | ₹98,246.64 |
| 9 | Carriage of Stone aggregate below 40 mm nominal size | 35.8 | cum | 623.3 | ₹22,315.39 |
| 10 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 35.8 | cum | 77 | ₹2,756.75 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
NIT.pdf
Tender Documents • 1.44 MB
BOQ_5106953.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .