| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.8 LAccepted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | 1 | Accepted-Finance L-1 | |
| 2 | 2₹20.3 L+₹49,823.14 (2.52%)Accepted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | 2 | Accepted-Finance L-2 | |
| 3 | 3₹20.4 L+₹56,178.62 (2.84%)Accepted-Finance | 3 | Accepted-Finance L-3 | |
| 4 | 4₹20.9 L+₹1.1 L (5.66%)Accepted-Finance | 4 | Accepted-Finance L-4 | |
| 5 | 5₹21.8 L+₹2.0 L (10.2%)Accepted-Finance | 5 | Accepted-Finance L-5 |
| Sl No | Description | Qty | Unit | Versha and Brothers L1 | TAJ ENTERPRISES L3 | P&H Engineering L2 | M/s S.S. Refregeration L4 | MANAS ELECTRICALS L6 | Meena Elect & Engg. Works L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Erection/ Installation, Testing & Commissioning of 160MVA 220/132 KV T/F & other associated work. | |||||||||
| 2.00 | Erection of 160 MVA Transformer RTCC Panel including its earthing, cable glanding ,dressing & connections of Fan, Pump on Auto as well as on Manual mode,RTD indications,OTI,WTI, Tap changer connections at both Ends .Work includes shifting from storage place to control Room. | 1 | Job | 5,013 ₹5,013 Lowest | 7,786 ₹7,786 | 30,000 ₹30,000 | 10,000 ₹10,000 | 10,000 ₹10,000 | 15,000 ₹15,000 |
| 3.00Shifting of Main tank of 160 MVA Transformer to plinth from place of storage upto 20 mtr. Distance including turning of tank if required. | |||||||||
| 3.10 | Shifting of T/F tank upto 20 mtr distance . | 1 | Job | 35,013 ₹35,013 | 24,400 ₹24,400 | 1,000 ₹1,000 Lowest | 25,000 ₹25,000 | 25,000 ₹25,000 | 35,000 ₹35,000 |
| 3.20 | Additional shifting of Transformer tank upto 30 mtr distance
( 1 Job for every 5mtr.) | 4 | Job | 5,013 ₹20,052 | 1,000 ₹4,000 Lowest | 1,000 ₹4,000 Lowest | 2,000 ₹8,000 | 10,000 ₹40,000 | 1,500 ₹6,000 |
| 4.00 | Complete erection of 160 MVA 220/132 KV Power Transformer including ''A'' frame header, Radiators , Conservator Tank , Bushing , Connecting pipe lines , Cooling fans and pumps , Marshaling box , OTI , WTI , Capilary pipes, etc. as per technical specification. | 1 | Job | 1,53,013 ₹1,53,013 | 75,000 ₹75,000 Lowest | 1,00,000 ₹1,00,000 | 1,50,000 ₹1,50,000 | 90,000 ₹90,000 | 75,000 ₹75,000 Lowest |
| 5.00 | Safe Carriage of 50 KL Transformer oil tank for centrifuging of Transformer oil from any UPPTCL S/S within approx 110 KM including loading and unloading at other substation.
(work to be done if required) | 1 | Job | 20,013 ₹20,013 | 20,000 ₹20,000 | 10,000 ₹10,000 Lowest | 65,000 ₹65,000 | 40,000 ₹40,000 | 40,000 ₹40,000 |
| 6.00Performing complete testing of Transformer with standard testing equipment with valid calibration certificate as below: | |||||||||
| 6.10 | Performing precommisioning Tan Delta tests on HV & LV Bushings of transformer before erection of 160MVA T/F using OHMICRON/Standard testing kit with valid calibration certificate.
Note-Any other tests required by T/F manufacturer will be in contractors scope. | 1 | Job | 13,000 ₹13,000 | 10,000 ₹10,000 Lowest | 50,000 ₹50,000 | 30,000 ₹30,000 | 10,000 ₹10,000 Lowest | 25,000 ₹25,000 |
| 6.20 | Performing complete testing of Transformer with standard testing equipment with valid calibration certificate. Following tests are to be complete: Tan-delta and capacitance measurement at standard as well as variable frequencies of 3 No. HV & 03 No. IV Bushing (using omicron/megger kit) after erection (b) LV testing of ttransformer including magnetising current test, magnetic balance test , measurement of winding resistance, vector group, insulation resistance, core insulation, voltage ratio test, short circuit test, open circuit test, .Test report to be compiled and submitted in standard formats as per satisfaction of competent authority. Note-Any other tests required by T/F manufacturer will be in contractors scope. | 1 | Job | 13,000 ₹13,000 Lowest | 45,000 ₹45,000 | 1,98,000 ₹1,98,000 | 85,000 ₹85,000 | 50,000 ₹50,000 | 50,000 ₹50,000 |
Tender Value
₹27.4 L
EMD Value
₹27,500
Closing Date
14 Jul 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2025_UPTCL_1029380_3
E-Tender No. ETC-II/L/02/2025-26
Open Tender
Electrical Works
Item Rate
60 days
ELECTY. 220 KV S/S LKO
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
SE, ETC-II, UPPTCL, LUCKNOW
₹27,500
6 Aug 2025
5 Jul 2025
15 Jul 2025
5 Jul 2025
14 Jul 2025
5 Jul 2025
Amount
Erection/ Installation, Testing & Commissioning of 160MVA 220/132 KV T/F & other associated work.
Erection of 160 MVA Transformer RTCC Panel including its earthing, cable glanding ,dressing & connections of Fan, Pump on Auto as well as on Manual mode,RTD indications,OTI,WTI, Tap changer connections at both Ends .Work includes shifting from storage place to control Room.
Shifting of Main tank of 160 MVA Transformer to plinth from place of storage upto 20 mtr. Distance including turning of tank if required.
Shifting of T/F tank upto 20 mtr distance .
Additional shifting of Transformer tank upto 30 mtr distance ( 1 Job for every 5mtr.)
Complete erection of 160 MVA 220/132 KV Power Transformer including ''A'' frame header, Radiators , Conservator Tank , Bushing , Connecting pipe lines , Cooling fans and pumps , Marshaling box , OTI , WTI , Capilary pipes, etc. as per technical specification.
Safe Carriage of 50 KL Transformer oil tank for centrifuging of Transformer oil from any UPPTCL S/S within approx 110 KM including loading and unloading at other substation. (work to be done if required)
Performing complete testing of Transformer with standard testing equipment with valid calibration certificate as below:
Performing precommisioning Tan Delta tests on HV & LV Bushings of transformer before erection of 160MVA T/F using OHMICRON/Standard testing kit with valid calibration certificate. Note-Any other tests required by T/F manufacturer will be in contractors scope.
Performing complete testing of Transformer with standard testing equipment with valid calibration certificate. Following tests are to be complete: Tan-delta and capacitance measurement at standard as well as variable frequencies of 3 No. HV & 03 No. IV Bushing (using omicron/megger kit) after erection (b) LV testing of ttransformer including magnetising current test, magnetic balance test , measurement of winding resistance, vector group, insulation resistance, core insulation, voltage ratio test, short circuit test, open circuit test, .Test report to be compiled and submitted in standard formats as per satisfaction of competent authority. Note-Any other tests required by T/F manufacturer will be in contractors scope.
Sampling & testing of transformer oil at CPRI or any other NABL testing lab including cost of transportation of sample in standard sampling steel bottle (adequate no. of bottle arranged by contractor) . Samples to be taken at following intervals:- Prefilling of Oil, Before charging - samples at top & bottom of main tank & OLTC -3 samples and After one month of charging. Following test to be Performed - 1- BDV 2) PPM 3) Tan delta 4) Resistivity 5) Interfacial tension 6) Particle count 7) DGA (One job for each sample) Note-Any other tests required by T/F manufacturer will be in contractors scope.
Performing following Test :- (a) Performing Pressure test using Dry Air on All Radiators @0.3 kg/cm2 with hold time 60 mins for checking leakage before erection of 160MVA T/F. (b) Performing Leakage test on Air Cell using Dry Air with pressure 0.07 kg/cm2 & prssure test on conservator tank using dry air with pressure 0.5 kg/cm2 (Air cell should not being pressurised condition) for checking leakage before erection of 160MVA T/F. (c) After Erection Perform Pressure test using Dry Air on Main tank with pressure 0.35 kg/cm2 hold time 24 hrs for checking leakage of main tank of 160MVA T/F and If Pressure drops leakage point to be identified and rectified. Note- Dry Air plant to be arranged by contractor.Note-Any other tests required by T/F manufacturer will be in contractors scope.
Performing following dry out cycle process of T/F :- 1.(a) start of Vaccum untill pressure reach below 01 torr and continue of vaccum for 48 hrs. 1.(b) break of vacuum by using UHP grade N2 -50degee cel gas having dew point of -60°C till pressure of 0.3 kg/cm2 is achieved. Maintained N2 pressure for 24 hrs and achieve dew point & Humidity .Dry out cycle is to be Performed till desired value of dew point in main tank is achieved . If required Purging is to be repeated. (N2& DEW POINT METER to be arranged by contractor) One Job for each cycle of Vacuum & Dry N2 filling.
Creating vaccuum at 1Torr inside 160 MVA T/F tank & stand test upto 24 hrs before filling oil step by step including vaccum stand test.
Filling of fresh Transformer oil from Transformer oil drums in suitable capacity oil stortage tank and then centrifuging of transformer oil by ultra high vaccum oil Filtration plant after connecting the centrifuging pipes with oil tanker to oil filtration plant including taking the BDV value of oil periodically till the required value is achieved with all cost of centrifuging machine CFM operator, lubricant etc. Note- Before Filling Oil in storage tank for centrifusing the BDV ,PPM test to be performed.
Centrifuging/Dehydration of the complete Transformer oil of 160 MVA Transformer by ultra high vacuum oil filtration plant after connecting the centrifuging pipes with Transformer tank to oil filtration plant. Including taking the BDV values of oil and megger values of the Transformer periodically till the required value is achieved. Including filling and topping up of the Transformer oil under vacuum in Main tank , Radiator , Conservator tank etc. and attending the oil leakages if any, will all cost of centrifuging machine , CFM operator , Lubricant etc.
Making delta for Neutral earthing by due fabrication of 3 Nos 3.5 Meter long Electrodes of 36/40mm dia M.S Round bar, its piercing under the ground at equal distance of 1 mtr at 700mm depth by digging of earth and connecting all the 3 nos electrodes with 75mmx10mm size M S flat and connecting with existing earth mat at two points (X & Y axis) and taking out riser by due cutting , bending , welding etc. as per technical specification M S Round bar/ flat shall be provided by Department.
Earthing of main tank, Marshalling box, Drive mechanism, Transformer neutral etc. of 160 MVA Transformer & structure, equipments with the help of 25x6mm/50x6mm / 75x10mm size (MS flat to be provided by Department) its jointing with already laid earthmat / delta at two places and necessary modification in existing support for earthing of Neutral bushing support for its earthing work by cutting bending,laying ms flat 700mm below & above ground as per technical specification/ standard practics at 2 point earthing .
MS Flat 25x6 mm size
MS Flat 50x6 mm size
MS Flat 75x10 mm size
Painting of following size MS Flats above ground using one coat of Red Oxide primer and two coats of best quality Bus Green colour Exterior enamel paint:
MS Flat 25x6mm size.
MS Flat 50x6mm size.
MS Flat 75x10mm size.
Jumpering of HV & LV bushing of 160 MVA Transformer through 198 KV LA's with the help of newely prepaired ACSR Zebra/ Moose Conductor with associated terminal connector/PG to connect with 220 KV CT's & work includes jumpering from LV bushings to 132kv Jack bus.
Laying of following sizes of unarmoured copper control cables (to be provided by Deptt.) in the cable trenches from Transformer C&R Panel to Marshling Box,220/132kv CT to CRP, equipments junction boxes, RTCC panel to DM box, Transformer to marshling box, CB to Transformer marshling box, interpanel wiring, WTI, OTI, RTD sensors, Fan &pump wiring etc as per requirement & cable schedule, it's saddling with 25x3 mm Al saddle at every 750mm distance including carriage of cable drum from store to site and shifting back to store and all other associated works to complete the job satisfactory as per technical specification.
10 x 2.5sqmm unarmoured copper control cable
6 x 2.5sqmm unarmoured copper control cable
4 x 2.5sqmm unarmoured copper control cable
2 x 2.5sqmm unarmoured copper control cable
Termination/ Connection using copper lugs (ring/pin type 2.5mm) of the control cable as per new cable schedule of 160 MVA Transformer and its OLTC/ RTCC panels at both end and control and Relay panel , cooling fans and pumps,OTI, WTI , Marshaling box, Bus bar panel, TBC panel interpanel wiring etc.using existing cable including laying, dressing and binding of additional control cables if required as per site requirement and termination along with making necessary holes using glands plate or box where ever required. Fixing of cable glands of appropriate size, providing of ferrules and cable termination as per standard practice and all other associated works as per technical specification with all cost of Cable Glands & Copper lugs.
Supply, Installation, Testing and Commissioning (SITC) with painting of Emulsifire System including connection with existing Air & Water pipelines as per following detail :-
Supply, Installation, testing and commissioning of High Velocity automatic water spraying system for 160 MVA Transformer by laying of GI "B" class pipe lines in three layer including cutting welding etc. & providing suitable flanges along with necessary fitting viz bends, tees, reducers, gaskets etc & anticorrosive treatment including 5% wastage along with laying of fire detectors line, water pipe line valve Quartzoid, HVWS nozzles along with all materials including paiting in prescribed colours as per details:-
SITC of 25 mm dia. 'B' class G.I. Pipe .
SITC of 40 mm dia. 'B' class G.I. Pipe .
SITC of 50 mm dia. 'B' class G.I. Pipe .
SITC of 65 mm dia. 'B' class G.I. Pipe .
SITC of 80 mm dia. 'B' class G.I. Pipe .
SITC of 100 mm dia. 'B' class G.I. Pipe .
SITC of 150 mm dia. 'B' class G.I. Pipe .
Supply and erection of pylon support of GI pipe 'B' class 80 mm. dia. With angle iron, U-bolt, Flanges & Nut and bolts for new Emulsifire system.
Construction of pylon support base for new Emulsifire system.
Construction of shed with all consumable material like AC Sheet, Iron, Angle for deluge valve of new 160 MVA Transformer Emulsifire system.
SITC of Pressure Gauge as per IS Specification IS Code:- 3624 Accuracy 5%.
SITC of fixed differential switch ( Danfoss/Indfoss make) type pressure switch range 1-10 Kg/cm2
SITC of 150 NB Sluice valve as per IS specification (IS Code: 14846) of (Zoloto/Kartar/Sir make).
SITC of '' Y'' type strainer of (Sir/Kartar/Kalpana/Agro make) dia (Max working pressure 07 Kg/cm2) 150mm.
SITC of Quartzite bulb detectors (QBD) operate at 79℃ sencing at ratyed temp for actuation of the element.
SITC of high velocity water spray nozzles flow capacity 3.5 Kg/cm2 spray core angle 90 0.
SITC of quick opening flood, deluge valve of HD of 150 NB as per Max working pressure 10 Kg/cm2, as per specification (HD/Mather Platt/equivalent make.)
P&H Engineering (BID ID -5327516)
TAJ ENTERPRISES (BID ID -5296081)
M/s S.S. Refregeration (BID ID -5325576)
Meena Elect & Engg. Works (BID ID -5317932)
MANAS ELECTRICALS (BID ID -5294135)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .