Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC HOUSE NO 3123 66 WARD NO 23 SATI COLONY REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | ₹2.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 Cr+₹14.1 L (7.12%)Rejected-AOC DHANI CHANDPUR BAWAL ROAD REWARI DHANI CHANDPUR BAWAL ROAD REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | ₹2.1 Cr+₹14.1 L (7.12%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.2 Cr+₹17.2 L (8.64%)Rejected-AOC 858 SECTOR 23 127021 2021R109 | BHIWANI | HARYANA | 127021 | ₹2.2 Cr+₹17.2 L (8.64%) | L3 | Rejected-AOC L3 |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
16 Feb 2023, 6:00 pmClosed
ASHOK KUMAR
EE PHE Division Kosli
Nangal Mundi, Const. of Ind. Water Works Under Jal Jeevan Mission, Construction brick lined SandS tank, raw andclear water suction wells, High level tank, filter beds, clear water tank, Pump chamber, boundary wall, CC roads, Raw water sump well wit
2023_HRY_255386_1
202345C1C4BC 7685 4CF5 8C39 2F91D84373BC581PUH
Open Tender
Civil Works
Works
455 days
NANGAL MUNDI
2 documents required · 2 mandatory
₹15,000
₹4.6 L
Yes
14 Mar 2023
3 Feb 2023
17 Feb 2023
3 Feb 2023
16 Feb 2023
3 Feb 2023
Amount
Supply and erection of Horizontal spindle split casing type puming sets minimum Four (4) Star rating duties coupled to AC squrrel cage induction type motor with 1440 RPM, 3 phase 50 Hz and accessories as described in Schedule No.II complete in all respect with priming arrangement with complete base frame .Raw Water Pump set 700 LPM 12 Mtrs Head
Operation and Maintenance for the complete scope of work mention in the DNIT (Disinfection material supplied by the PHED) as per schedule-IV for a period of 5 years after 12 month during Defect Libility Period after 3 Months Trial run (will be charged to the A/mtc. Estimate. Operation and Maintenance during defect liability period (Operation Only)
Operation and maintenance during 1st year after defect liability period.
Operation and maintenance during nd year after defect liability period.
Operation and maintenance during 3rd year after defect liability period.
Operation and maintenance during 4th year after defect liability period.
Operation and maintenance during 5th year after defect liability period.
Bidder Name
Amount
M/S SHREE BALAJI BUILDERS(GSTN-NA)
Sachin Goyal(GSTN-NA)
Rakesh Yadav Contractor(GSTN-NA)
Rakesh Yadav Contractor
M/S SHREE BALAJI BUILDERS
M/S SHREE BALAJI BUILDERS
Rakesh Yadav Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .