| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | L1 | Accepted-Finance BQR Conditions satisfied | |
| 2 | L2₹4.9 L+₹21,225.60 (4.55%)Accepted-Finance | L2 | Accepted-Finance BQR Conditions satisfied |
Tender Value
Refer Docs
EMD Value
₹5,800
Closing Date
4 Apr 2022, 2:00 pmClosed
SE/O/TTPS
Office of the Superintending Engineer Operation, TTPS, Tuticorin-628 004.
TTPS Operation Circle CMP Maintenance of LAN components in various offices in TTPS for the period from 08.04.2022 to 30.09.2022
2022_EB_226661_1
CE/SE/O/TTPS/Spec.No.01/22-23
Open Tender
Miscellaneous Works
Item Rate
176 days
TTPS
As per BQR Conditions said in NIT
5 documents required · 5 mandatory
₹0
₹5,800
6 Apr 2022
22 Mar 2022
5 Apr 2022
22 Mar 2022
4 Apr 2022
22 Mar 2022
Amount
Maintenance (Cleaning and Signal termination checking) of LAN Extenders, Ethernet Switches, Fibre Optic panels and Switches consists, 1. Cleaning and Signal termination checking of 108 Panels of LAN Extenders, Ethernet Switches, Fibre Optic panels, Media Converters, Switches, Wi-Fi Modems etc. once in a Week. (Totally 108 Panels, Total Qty. to be cleaned Per Month=108x4=432 Panels, Total Qty. to be cleaned for 6 Months=108x24=2592 Panels). 2. Complete the rectification works then and there on receipt of fault intimation at once within 24 Hours for the repairs such as Loose Connection/Connector failure in Network Components, Power Supply/Hardware defects in Network Components, Configuration problem in Network Components etc. 3. The contractor must provide workers regularly except Sundays and National Holidays to execute the works and they must report to the Engineer concerned regularly. 4. The contractor must provide workers on receipt of fault intimation at once if it happens on Sundays and National Holidays to execute the works and they must report to the Engineer immediately. 5. Necessary Tools and Plants, consumables etc. required for the work should be borne by the Contractor. 6. The contractor should adopt safety precautions and engaging their workmen as per safety rules. 7. The contractor should issue necessary safety equipments for their labours for this work. 8. The contractor should arrange labour entry pass before the commencement of work. 9. ESI and EPF should be produced before 15th of every month.
Maintenance (Cleaning and checking of Signal terminations, Cable terminations and Process connections) of Client Computers and Server Computers located at various locations consists, 1. Cleaning and checking of Signal terminations, Cable terminations and Process connections of Ethernet and Optical Fibre Cable of 281 Connections of Client Computers located at various locations and Server Computers located at EDP Centre etc. once in a Month. (Totally 281 Connections, Total Qty. to be cleaned Per Month=281x1=281 Connections, Total Qty. to be cleaned for 6 Months=281x6=1686 Connections). 2. Cleaning and Checking of Signal terminations, Cable terminations and Process connections of OFC Hotline from EDP Centre to UCB I, Exchange to DMP, DMP to UCB V and EDP Centre to Switch Yard I. 3. Complete the rectification works then and there on receipt of fault intimation at once within 24 Hours for the repairs such as LAN disabled in Client Node Adaptor, Loose Connection/Connector failure in Client Node, Configuration problem in Client IP etc. 4. Complete the rectification works then and there on receipt of fault intimation at once within 48 Hours for the repairs such as Ethernet/OFC cable puncture. The OFC repair includes signal checking/joint to be made in Optical Fibre Cable etc. 5. The contractor must provide workers regularly except Sundays and National Holidays to execute the works and they must report to the Engineer concerned regularly. 6. The contractor must provide workers on receipt of fault intimation at once if it happens on Sundays and National Holidays to execute the works and they must report to the Engineer immediately. 7. Necessary Tools and Plants, consumables etc. required for the work should be borne by the Contractor. 8. The contractor should adopt safety precautions and engaging their workmen as per safety rules. 9. The contractor should issue necessary safety equipments for their labours for this work. 10. The contractor should arrange labour entry pass before the commencement of work. 11. ESI and EPF should be produced before 15th of every month.
M/s. Rajesh and Company
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .