| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | ₹2.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 LRejected-AOC | ₹2.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K.Sathish L2 | Sarathi L1 |
|---|---|---|---|---|---|
| 1.00 | White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete | 27.64 | cum | 37.97 ₹1,049.49 | 36.82 ₹1,017.70 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 1.5 | cum | 5,290.64 ₹7,935.96 | 5,288.55 ₹7,932.83 |
| 3.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 1.12 | cum | 6,342.66 ₹7,103.78 | 6,340.5 ₹7,101.36 |
| 4.00 | pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 35.42 | cum | 1,247.32 ₹44,180.07 | 1,244 ₹44,062.48 |
| 5.00 | Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour | 27.64 | cum | 309 ₹8,540.76 | 308 ₹8,513.12 |
| 6.00 | Painting two coat using Oilbound distember including cost and conveyance and labour charges etc complete. | 50.08 | sqm | 142.64 ₹7,143.41 | 141.27 ₹7,074.80 |
| 7.00 | Painting two coat using Plastic Emulsion Paint including cost and convayance and labour charges etc complete. | 113.14 | sqm | 253.58 ₹28,690.04 | 253.58 ₹28,690.04 |
| 8.00 | Painting two coats using ready mixed approved paint including cost and convetance and labour charges etc complete.old Iron work | 16.2 | sqm | 149.86 ₹2,427.73 | 149.86 ₹2,427.73 |
| 9.00 | Construction of Septic tank at PUE school VOC nagar Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 15.32 | cum | 246.52 ₹3,776.69 | 246.52 ₹3,776.69 |
| 10.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 0.85 | cum | 5,082.53 ₹4,320.15 | 5,082.53 ₹4,320.15 |
Tender Value
Refer Docs
EMD Value
₹2,260
Closing Date
19 Jun 2025, 5:00 pmClosed
Block Development officer,Walajah
Block Development office,Walajah
Repairs For PUM School Toilet and new Septic Tank at VOC Nagar H/O Nowlock Panchayat
2025_RDTN_569795_1
A2/1661/2025
Open Tender
Civil Works
30 days
Block Development office, Walajah
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹2,260
28 Feb 2026
17 Jun 2025
19 Jun 2025
17 Jun 2025
19 Jun 2025
17 Jun 2025
Amount
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour
Painting two coat using Oilbound distember including cost and conveyance and labour charges etc complete.
Painting two coat using Plastic Emulsion Paint including cost and convayance and labour charges etc complete.
Painting two coats using ready mixed approved paint including cost and convetance and labour charges etc complete.old Iron work
Construction of Septic tank at PUE school VOC nagar Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc Inner all round
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc Inspection Chamber
Water supply and sanitary arrangements 110 mm PVC PIPE 6Ksc
110mm pvc tee
110mm pvc elbow
K.Sathish (BID ID -1371221)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_680720.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid