| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | +0.00% | ₹2.1 L | L1 | Admitted-Finance |
| 2 | L2₹2.1 L+₹3,074.15 (1.47%)Admitted-Finance | +1.47% | ₹2.1 L+₹3,074.15 (1.47%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 L+₹10,623.58 (5.08%)Admitted-Finance | +5.08% | ₹2.2 L+₹10,623.58 (5.08%) | L3 | Admitted-Finance |
Tender Value
₹2.1 L
EMD Value
₹4,200
Closing Date
18 Jul 2026, 5:00 pmClosed
EXECUTIVE ENGR. (C ), BR-XIV
516, D. H. ROAD, KOLKATA-700034
PROTECTION OF ROAD BY CONSTRUCTION OF R.C.C AND BRICKS WALL AT THE NORTHERN SIDE OF MAHENDRA BANERJEE ROAD OPPOSITE TO SHIB CHHYA APPARTMENT IN WARD NO- 129.
2026_KMC_1031787_1
KMC/XIV/129/002/26-27/R
Open Tender
CIVIL WORKS
Percentage
30 days
WARD-129
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹4,200
22 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 1 | CUBIC METER PERCENT | 119.27 | ₹119.26 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 1 | CUBIC METER PERCENT | 192.38 | ₹192.19 |
| 3 | Supplying empty Cement bags in good condition. | 150 | NUMBER 100 | 3.3 | ₹495 |
| 4 | Filling empty Cement bags with dry earth or sand stitching the bag(cost of the thread include) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. | 150 | NUMBER 100 | 3.5 | ₹525 |
| 5 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
8. Pumping out water from ponds or tanks .(Payment if permitted will be made on the quantity of water calculated on the basis of initial water level and final level on consideration being made for any water that may have been added through percolation or otherwise). | 756 | CUBIC METER PERCENT | 10.44 | ₹7,892.64 |
| 6 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume).
(c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page
No.245 & page-222 sl. No-4) | - | CUBIC METER | 1,172.6 | - |
| 7 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | - | SQUARE METER | 361 | - |
| 8 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.
(a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10) | - | CUBIC METER | 4,761 | - |
| 9 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety ( Ref :PWD (Bldg.)-2017, page-26 (item -10(i), consumption chart pg-B-60, sl-3 and Annexture-II , Format-A, 3rd Corrigenda & addenda p-13 dtd-04.06.2018, PWD(R&B) 2018, Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 7.69 | CUBIC METER | 6,274.72 | ₹48,223.97 |
| 10 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 40.65 | SQUARE METER | 335 | ₹13,617.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_2533640.xls
BOQ • 0.35 MB
Tform.pdf
Tender Documents • 0.40 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .