Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC BARODA ROAD GOHANA BARODA ROAD GOHANA NEAR BHARAT GAS AGENCY 131301 | SONIPAT | HARYANA | 131301 | ₹1.5 L | L1 | Accepted-AOC ok |
| 2 | L2₹1.7 LRejected-AOC NEAR BANGLA VILLAGE DHANANA TEHSIL AND DISTRICT BHIWANI 127031 | BHIWANI | BHIWANI | HARYANA | 127031 | ₹1.7 L | L2 | Rejected-AOC ok |
Tender Value
₹1.7 L
EMD Value
₹3,320
Closing Date
19 May 2026, 5:00 pmClosed
Nidhi bhardwaj
Horticulture Hissar
DETAILED ESTIMATE FOR ROUGH COST ESTIMATE FOR FURTHER DEVELOPMENT OF LS WORKS IN PHASE II IN SECTOR 33 P I, HISAR Work Code HSV 2023 24 88829
2026_HBC_520824_1
20262E704EA9 ECF9 44F1 A3F5 D9FEF2469ABB262HSV
Open Tender
Civil Works
60 days
Hisar
3 documents required · 3 mandatory
₹250
₹3,320
Yes
12 Jun 2026
11 May 2026
20 May 2026
11 May 2026
19 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.25.2]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 2. Raised and cut pointing | 96 | Sqm | 105 | ₹10,080 |
| 2 | [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) | 96 | Sqm | 127 | ₹12,192 |
| 3 | [11.63]Distempering with dry distemper of approved brand and manufacture (two or more coats) of required shade on new work, over and including water thinnable priming coat to give an even shade. | 192 | Sqm | 29 | ₹5,568 |
| 4 | [11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works | 109 | Sqm | 19 | ₹2,071 |
| 5 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. | 109 | Sqm | 31 | ₹3,379 |
| 6 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 213 | Kg. | 83 | ₹17,679 |
| 7 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) | 2 | cum | 1,149 | ₹2,298 |
| 8 | [5.45]Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 96 | Sqm | 33 | ₹3,168 |
| 9 | [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar | 21 | cum | 585 | ₹12,285 |
| 10 | [5.8.3]Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): 3. From brick work in cement mortar | 3.02 | 1000 Nos. | 1,657 | ₹5,004.14 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_599723.xls
BOQ • 0.29 MB
AD0160308.pdf
Additional Documents • 8.34 MB
Download all tender documents and submit your bid