Loading…
Loading…
Tender Value
₹49.8 L
EMD Value
₹1.2 L
Closing Date
31 Dec 2025, 10:30 pmClosed
Electronics City Industrial Township Authority
Conversion of Overhead lines by Underground Cables from SATVA junction to TIMKEN Ltd., pertaining to F-02 feeder of 66/11 kv Velankini Sub-Station in Electronic Phase -1 in Electronic City
ELCITA/2025-26/OW/WORK_INDENT90
ELCITA/2025-26/OW/WORK_INDENT90
Open
Other Works
Two Tender Document System(Two Cover)
ELCITA Chief Executive Officer Office Bengaluru
₹1,250
₹1.2 L
10 Dec 2025
10 Dec 2025
2 Jan 2026
17 Dec 2025
15 Dec 2025
Conversion of Overhead lines by Underground Cables from SATVA junction to TIMKEN Ltd., pertaining to F-02 feeder of 66/11 kv Velankini Sub-Station in Electronic Phase -1 in Electronic City
Supply and Installation of DAS Specification Compact RMU (VCB/SF6 Type) as per IEC-62271 The DAS RMUs shall have the following in addition to the Standards: 1. DC motors, Numerical Relays, Multi funct...
Supply and Installation of Compact 5Way RMU-Non Das (VCB/SF6 Type) type with Copper Busbar, 350 MVA, 21KA, 630 Amps as per IEC 62271/IS-3427. 2 OD (LBS) + 3 VL (One Incomer + Three Breakers + One Outg...
Supply and Laying of HT Cable 11 kV, 3 Core, XPLE HT UG Cable with pressure extruded inner sheath, ROUND WIRE ARMOURED as per IS-7098 (Part-2) Armouring wires dia and Resistivity as per IS-3975 - 3Cx4...
Supply and making of 11KV (E) Extruded "X" linked for tubing & moulded & cross-linked components using Heat Shrink Stress Control tube having High Permittivity XLPE Terminations - INDOOR & OUTDOOR JOI...
Supply and making of 11KV (E) Extruded "X" linked for tubing & moulded & cross-linked components using Heat Shrink Stress Control tube having High Permittivity XLPE Terminations - INDOOR & OUTDOOR JOI...
Supply and making of 11KV (E) Extruded "X" linked for tubing & moulded & cross-linked components using Heat Shrink Stress Control tube having High Permittivity XLPE Terminations - INDOOR & OUTDOOR JOI...
Supply and Laying of GI Pipe B - Class as per IS-1239. GI Pipe - 150 mm Dia (For cable raising)
Supply and Laying of ACSR Conductor as per IS-398 (Part - 2/1996) of Rabbit ACSR (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM.
Supply and fixing of Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991, with painting.Erection of 11 Mtr long Concrete Spun Pole ...
Supply and fixing of Single H Frame without Transformer Seating and Seating angle support cross arm for 11 Mtr Spun Pole for 63/100/250/500kVA (OH Line) - GI
Supply and fixing of 11 kV, 400 Amps Single Break Polymer Type Post Insulators GOS
Supply and fixing of HT ST Support 50x8 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018)
Supply and Providing chain link fencing 50 mm size of 8 gauge properly stretched between rectangular Poles and fixed with suitable bolts & nuts, the free ends shall be welded to the Pole and block pip...
Spreading of Jelly - Supplying and spreading 100mm thick with 40mm jelly with all lead and lifts.
Supplying fixing and wiring earth electrode for grounding etc. using 40mm dia 2.9mm thick 2.5mtr long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode...
Supplying and running of GI / Copper strips for grounding connections, using necessary fixing materials as required. GI strip - 50x6mm
Supplying and running of GI / Copper strips for grounding connections, using necessary fixing materials as required. 600x600x3mm GI plate
Making and Fixing pot head for HT Cable only - 3Cx240 to 3Cx400 Sqmm
Construction of platform with size stone, cement concert for erection of Transformer/Metering cubicle/Heavy Equipment. Construction of platform (1.5x1.5x1.2) Mtr in size stone, for erection of transfo...
Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc.,
Laying of UG Cables by Trenchless Technology (HDD) by adopting Horizontal Boring & Drawing of cable including preparation at site - Normal soil 5/6'' Bore With out HDPE Pipe for HT and LT Cable (at de...
Supply and Erection of Earth work excavation by removing tiles for cable trench of 0.6 to 0.75 Mtr. Width and Depth of 1.0 Mtr including trial pits in Pedestrian area / Property Entrance, Supply and R...
Supply and laying of RCC Hume Pipe 2000 mm long 150 mm Dia
Supply, Fabrication, Erection & including 2 coats of red oxide primer & 2 coats of approved enamel paint of Steel items including all channels, suspension supports, steel plate, anchor bolts, cross an...
Supply and errection of LT Feeder Pillar Box (MS & Thermoset Plastic)- 8 Way with Porcelain Rewireable Cut-out and & 1 No of 315 Amps Load Break Switch with Alluminium Busbar as per SLD. LT Feeder pil...
Supply and laying of 1.1 kV, XLPE PVC insulated, PVC extruded Inner Sheath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 - 240...
Supply and laying of 1.1 kV, XLPE PVC insulated, PVC extruded Inner Sheath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 - 10 ...
Supply and making of Straight Through Jointing Kit Suitable for 1.1 kV Class LTUG Cable as per IS-13573 - Epoxy Type: 240 Sqmm, 3.5/4 Core
Supply and laying of Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991
Supplyand Fixing of Single H Frame with Transformer Seating and Seating angle support cross arm for 11 Mtr Spun Pole for 25 kVA (OH Line) 11 kV, 200 Amps Single Break GOS (Dwg No. BESCOM/GM/QS&S/23 Dt...
Supply and fixing of 11 kV, 45 kN Polymeric Insulator
Supply and fixing of HT ST Support 50x8 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018)
Supply and Installation of Single Pole Mounted Transformer Structure, For Three H Frame with Transformer Seating and Seating angle support cross arm for 11 Mtr Spun Pole up to and including 250 kVA (U...
Supplying and fixing of Brass Cable Gland - 45mm
Supply, termination of Heavy Duty Copper Terminal Long Barrel - 240 Sqmm Copper Terminal, Approx. Wt: 218 Gm
Removing and refixing of Existing Pole mounted DAS LBS with FTU unit to New Proposed Location.
Releasing of HT Conductor
Releasing of LT Conductor
Removing of RCC Pole with all necessary works.
Releasing of 11 Mtr long Concrete Spun Pole in a pit of 2.5 Mtr depth (Mechanised Labour)
Releasing Horizontal cross arm including Single Top Support Brace and Insulators
Releasing of 2/3 Pole Structure:
Removing and Re-fixing of existing Drain Trench Cover With all necessary works during erection of HT cable.
Services charges towards Permission for getting Line cut/power shut down from the department, approval for New 3 and 5 WAY RMUs Commissioning works, Shifting and Erection of existing 1X100 KVA DTC, Su...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .