Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 2 KALKAJI INDUSTRIAL AREA KALKAJI KALKAJI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance OFFICE NO 35 2ND FLOOR SOMSHANKAR CHAMBERS PARVATI PUNE MAHARASHTRA PUNE PUNE MAHARASHTRA 411009 | PUNE | MAHARASHTRA | 411009 | Admitted-Finance |
| 5 | Rejected-Technical PLOT NO 193 A GIDC INDUSTRIAL ESTATE NEAR TELEPHONE EXCHANGE NANDESARI VADODARA GUJARAT 391340 | VADODARA | GUJARAT | 391340 | Rejected-Technical Ref TR |
Tender Value
Refer Docs
EMD Value
₹53,000
Closing Date
19 Jul 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Monikanchan Das 9435331248
Numaligarh Refinery Limited
Insulation Jobs at Refinery and NRMT for RTA 2023
2022_NRL_698801_1
OC19000327/MKD
Open Tender
Miscellaneous Works
Works
90 days
Numaligarh Refinery Limited
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹53,000
Yes
8 Oct 2022
5 Jul 2022
20 Jul 2022
5 Jul 2022
19 Jul 2022
5 Jul 2022
180 days
Amount
Thickness of Insulation: 25 mm to 75 mm: Removal of existing damaged worn out insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by fixing single/multiple layer of machine stitched preformed LRB mineral wool mattresses of density 140 to 150kg/m3 conforming to IS:8183 in required thickness over pipings, equipments etc., including fixing the insulation mattresses in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge. Note: 1) NRL will issue LRB mineral wool mattresses on free issue basis. However, contractor has to make their own arrangement for storage of all the materials.2) Other anciliary items/tools tackles/manpower etc. has to be supplied by the contractor. 3) item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Thickness of Insulation: above 75 mm: Removal of existing damaged worn out insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by fixing single/multiple layer of machine stitched preformed LRB mineral wool mattresses of density 140 to 150kg/m3 conforming to IS:8183 in required thickness over pipings, equipments etc., including fixing the insulation mattresses in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge. Note: 1) NRL will issue LRB mineral wool mattresses on free issue basis. However, contractor has to make their own arrangement for storage of all the materials.2) Other anciliary items/tools tackles/manpower etc. has to be supplied by the contractor. 3) item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Cutting out inspection pockets in insulation over pipings, vessels, columns, equipments etc. (upto 5 m from groung level) including cutting out of existing aluminium cladding & insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by re-insulation of the pockets in original thickness along with refitting of aluminum cladding with all necessary tools, tackles, materials such as binding, stitching wire, labour etc. Note: 1) NRL will issue LRB mineral wool mattresses and Aluminium Cladding sheet on free issue basis. However, contractor has to make their own arrangement for storage of all the materials.2) Other anciliary items/tools tackles/manpower etc. has to be supplied by the contractor. 3) item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. 4) The cutout pockets shall be reinsulated only after clearance from EIC. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Extra for every additional height of one meter or part thereof beyond 5 meters from ground level for Cutting out inspection pockets in insulation over pipings, vessels, columns, equipments etc. Measurements for this item=(Measurement of work as per item no 30)×(Height of the work location in meters minus 5).
Cold Insulation: Removal of existing damaged worn out insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by fixing single/multiple layer of cold insulation material over the technological equipments like piping, vessels, ducts, storage tanks etc., including fixing the insulation in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge. The item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge, return of scrap to NRL storeyard. Note: 1) NRL will issue COLD insulation material on free issue basis. However, contractor has to make their own arrangement for storage of all the materials.2) Other anciliary items/tools tackles/manpower etc. has to be supplied by the contractor. 3) item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Calcium Silicate Insulation: upto 75 mm thickness: Removal of existing damaged worn out calcium silicate insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by fixing single/multiple layer Calcium Silicate Insulation over technological equipments like piping, columns, vessels, ducts or any other equipment., including fixing the insulation in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, weather coating ,labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge.The item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge, return of scrap to NRL storeyard. Note: 1) NRL will issue Calcium Silicate insulation material on free issue basis. However, contractor has to make their own arrangement for storage of all the materials.2) Other anciliary items/tools tackles/manpower etc. has to be supplied by the contractor. 3) item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Calcium Silicate Insulation: Above 75 mm thickness: Removal of existing damaged worn out calcium silicate insulation, thoroughly cleaning the surface with wire brush or any other method as approved by the Engineer Incharge followed by fixing single/multiple layer Calcium Silicate Insulation over technological equipments like piping, columns, vessels, ducts or any other equipment., including fixing the insulation in position and securing the same properly with all necessary tools, tackles, materials such as binding, stitching wire, weather coating labour etc. The complete work shall be in accordance with the specifications laid down in the contract and in the latest IS standards as per the directions of Engineer-in-Charge.The item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge, return of scrap to NRL storeyard. Note: 1) NRL will issue Calcium Silicate insulation material on free issue basis. However, contractor has to make their own arrangement for storage of all the materials.2) Other anciliary items/tools tackles/manpower etc. has to be supplied by the contractor. 3) item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Removal of old damaged worn out Aluminium Cladding and fixing cladding with new internal polysurlyn coated Aluminum plain /corrugated sheets. The job includes cutting, bending and grooving to proper shape and size and fixing with self-tapping screws,securing with mettalic bands wherever required and providing water proofing elastomeric sealing compound (or tar felt) between the sheet overlap/joint followed by applying water and UV resistant aluminum foil tape. Note: 1) NRL will issue internal polysurlyn coated Aluminum plain /corrugated sheets and securing bands on free issue basis. However, contractor has to make their own arrangement for storage of all the materials.2) Other anciliary items/self tapping screw/joint sealing compunds/aluminium foil tape/tools tackles/manpower etc. has to be supplied by the contractor. 3) item includes disposal of the debris to the directed place within the unit in concern as per the direction of Engineer-in-Charge. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Providing and fixing box scaffolding system up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. as per directions and approval of Engineer-in- charge .The volume of the scaffolding shall be measured for payment purpose . The payment will be made once irrespective of duration of scaffolding. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Breather Coating: Supply and application of brush/ trowell applied mastic on outer surface of insulation underneath metal cladding with glass cloth reinforcement. The mastic should provide a film thickness of 1 to 1.5mm when dry. The breather moisture barrier coating should typically be fire resistive with non volatile content > 60% by weight, flame spread index <10 (tested as per ASTM E-84) Vapour permeability >1perms (tested as per ASTM E96). The Contractor has to produce manufacturer's certificate in support of characteristics of the coating materials as per relevant Codes. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Supply and application of approved brand of Heat resistant silicone Aluminium Paint suitable up to 540°C dry temperature containing Aluminium metal confirming to ASTM 962 as the main pigment with minimum 30 % solids, including steel scaffolding , preparation of surfaces, wherever required for all heights, labour, materials, tools and tackles, consumables,supervision, etc. to complete the work in all respects as per specifications, NRL painting Manual and direction of Engineer in Charge. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Deployment & operation of 9 tonne Diesel Truck of capacity 5 CUM including supply of necessary fuel & operator for carrying and disposal of insulation material to a designated place as per the direction of Engineer in charge
Loading insulation material on to diesel truck of 5 CUM capacity upto full capacity and unloading the same at an area designated by the EIC upto 2km away from the loading site. Loading and unloading shall be done minimum 8 times per day. This work item is inclusive of all manpower, tools and tackles. Cost for providing and operating diesel truck shall be paid for seperately. Expenses for PF/ESI/WCI etc. for all workers shall be borne by the contractor.
Lloyd Insulations (India) Ltd
M/s P K Construction
Shree Thermocare PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .