| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 CrAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹33.8 Cr+₹6.3 Cr (22.7%)Rejected-Finance | L2 | Rejected-Finance Rejected Being Higher Rates | |
| 3 | L3₹36.4 Cr+₹8.9 Cr (32.2%)Rejected-Finance | L3 | Rejected-Finance Rejected Being Higher Rates | |
| 4 | L4₹38.2 Cr+₹10.7 Cr (38.7%)Rejected-Finance B 708 SECTOR C MAHANAGAR LUCKNOW 225879 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 225879 | L4 | Rejected-Finance Rejected Being Higher Rates | |
| 5 | L5₹38.5 Cr+₹10.9 Cr (39.7%)Rejected-Finance | L5 | Rejected-Finance Rejected Being Higher Rates |
| Sl No | Description | Qty | Unit | M/S ANMOL ASSOCIATES L3 | SHAKUNTALA SINGH L1 | SIDDHARTH CONSTRUCTION L5 | SURAJ BUILDER INDIA PVT. LTD. L2 | M/S SURYANSH INFRA DEVELOPERS PVT LTD L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . as per direction of Enginner in charge all required for completion of the work. | 95,000 | sqm | 20 ₹19,00,000 | 11 ₹10,45,000 | 18 ₹17,10,000 | 10 ₹9,50,000 Lowest | 15 ₹14,25,000 |
| 2.00 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. as per SOR Ch-25 SI No.-12 as per direction of Enginner in charge all required for completion of the work. | 11,500 | sqm | 8 ₹92,000 | 15 ₹1,72,500 | 8 ₹92,000 | 4 ₹46,000 Lowest | 7 ₹80,500 |
| 3.00 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. as per direction of Enginner in charge all required for completion of the work. | 9,500 | cum | 92 ₹8,74,000 | 31 ₹2,94,500 Lowest | 90 ₹8,55,000 | 50 ₹4,75,000 | 80 ₹7,60,000 |
| 4.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per direction of Enginner in charge all required for completion of the work. | 1,30,000 | cum | 300 ₹3,90,00,000 | 100 ₹1,30,00,000 Lowest | 350 ₹4,55,00,000 | 300 ₹3,90,00,000 | 310 ₹4,03,00,000 |
| 5.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per SOR Ch-25 SI No.-24 as per direction of Enginner in charge all required for completion of the work. | 3,100 | cum | 50 ₹1,55,000 Lowest | 79 ₹2,44,900 | 50 ₹1,55,000 Lowest | 50 ₹1,55,000 Lowest | 50 ₹1,55,000 Lowest |
| 6.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Compaction Only) as per direction of Enginner in charge all required for completion of the work. | 1,400 | cum | 37 ₹51,800 | 40 ₹56,000 | 30 ₹42,000 Lowest | 300 ₹4,20,000 | 35 ₹49,000 |
| 7.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 as per direction of Enginner in charge all required for completion of the work. | 15,500 | cum | 4,000 ₹6,20,00,000 | 3,150 ₹4,88,25,000 | 4,200 ₹6,51,00,000 | 3,100 ₹4,80,50,000 Lowest | 3,800 ₹5,89,00,000 |
| 8.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per direction of Enginner in charge all required for completion of the work. | 19,000 | cum | 4,200 ₹7,98,00,000 | 3,550 ₹6,74,50,000 | 4,500 ₹8,55,00,000 | 3,200 ₹6,08,00,000 Lowest | 4,200 ₹7,98,00,000 |
| 9.00 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per direction of Enginner in charge all required for completion of the work. | 71,000 | sqm | 40 ₹28,40,000 | 35 ₹24,85,000 | 35 ₹24,85,000 | 25 ₹17,75,000 Lowest | 38 ₹26,98,000 |
| 10.00 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per direction of Enginner in charge all required for completion of the work. | 72,000 | sqm | 11 ₹7,92,000 | 11 ₹7,92,000 | 12 ₹8,64,000 | 10 ₹7,20,000 Lowest | 11 ₹7,92,000 |
Tender Value
₹39.4 Cr
EMD Value
₹50 L
Closing Date
25 Mar 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Lucknow Circle PWD Lucknow
Office of SE Lucknow Circle PWD Lucknow
Widening and Strengthening of Kukrail Night Safari and Zoo in Km-1, 2, 3 and 4(800) of Faridnagar Gudamba Road for 04 lane road from Kursi Road to Night Safari main entry point.
2025_CEUCZ_1016623_1
1399/E-Tender/2024-25 Dated 17.02.2025
Open Tender
Civil Works - Roads
Item Wise
548 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹50 L
Office of SE Lucknow Circle PWD Lucknow
13 Nov 2026
12 Mar 2025
25 Mar 2025
12 Mar 2025
25 Mar 2025
12 Mar 2025
12 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . as per direction of Enginner in charge all required for completion of the work. | - | sqm | 19 | - |
| 2 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. as per SOR Ch-25 SI No.-12 as per direction of Enginner in charge all required for completion of the work. | - | sqm | 60 | - |
| 3 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. as per direction of Enginner in charge all required for completion of the work. | - | cum | 247.33 | - |
| 4 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per direction of Enginner in charge all required for completion of the work. | 0.29 | cum | 4,550.9 | ₹1,319.76 |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per SOR Ch-25 SI No.-24 as per direction of Enginner in charge all required for completion of the work. | - | cum | 5,104.71 | - |
| 6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Compaction Only) as per direction of Enginner in charge all required for completion of the work. | - | cum | 5,021.66 | - |
| 7 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 as per direction of Enginner in charge all required for completion of the work. | - | cum | 8,967 | - |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per direction of Enginner in charge all required for completion of the work. | - | cum | 241.09 | - |
| 9 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per direction of Enginner in charge all required for completion of the work. | - | sqm | 8,294.44 | - |
| 10 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per direction of Enginner in charge all required for completion of the work. | - | sqm | 10.96 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.29 MB
Tenderdocument.pdf
Tender Documents • 3.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .