Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | -11.50% | ₹2.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹5,920
Closing Date
14 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of protection bund and CC path near house of Mohammad Anwar Khan S/o Fakir Khan and others at Heerpora Zadgay Panchayat Zadgay B Block Tulail
2026_PWDJK_322648_6
(REW) E-NIT No-16 of 2026-27 EE-RnB-Grz-5572-81 E-tendering Dated-27-08-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Gurez
₹5,920
Executive Engineer RnB Division Gurez
18 Sept 2026
29 Aug 2026
15 Sept 2026
29 Aug 2026
14 Sept 2026
29 Aug 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 16.99 | Cum | 479.3 | ₹8,143.31 |
| 2 | Providing and laying of stone soling hand packed tightly ramming, dressing in trenches incl. carriages complete job. | 7.24 | Cum | 1,200 | ₹8,688 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:3:6 (1Cement: 3 fine sand: 6 graded stone aggregate 20mm nominal Size) | 35 | Cum | 5,733.6 | ₹2,00,676 |
| 3.01 | plums @ 20% | 8.75 | Cum | 1,200 | ₹10,500 |
| 4 | Centering and shuttering including strutting propping etc. and removal of form work. | 111.8 | Sqm | 286.35 | ₹32,013.93 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:4:8 (1Cement: 4 fine sand: 8 graded stone aggregate 40mm nominal Size) | 1.77 | Cum | 5,202.9 | ₹9,209.13 |
| 6 | Carriage of different material from nearest sourec to site of work. Stone Avg 05 Km & H/L 50 mtr | 33.09 | Cum | 401.41 | ₹13,282.66 |
| 6.01 | Sand from Avg lead of 05 Km & H/L 50 mtr | 16.55 | Cum | 401.41 | ₹6,643.34 |
| 7 | Carriage of cement for av. Lead of 20 kms & H/L 50 mtr | 8 | M.T | 480.55 | ₹3,844.4 |
| 8 | Add cost of sign board photographs in unforeseen items.. | 1 | Job | 3,000 | ₹3,000 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_1083119.xls
BOQ • 0.27 MB
Extend1.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .