Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹57.7 L
EMD Value
₹1.2 L
Closing Date
20 Jun 2026, 6:00 pmClosed
EE WR Division Karauli
EE WR Division Karauli
Repair and renovation of Maiyapura anicut Kunda ke pas
2026_WRDAS_567117_2
NIT 02/2026-27
Open Tender
Civil Works
Percentage
274 days
under jurisdiction of EE Karauli Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
as per nit
₹1.2 L
Yes
22 Jun 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
20 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor aftercutting. Thick | 3,000 | Sqm | 2.5 | ₹7,500 |
| 2 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.(b) Hard rock not requiring blasting | 1,498.5 | cum | 241 | ₹3,61,138.5 |
| 3 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 14,495.04 | Kg. | 89 | ₹12,90,058.56 |
| 4 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove | 468.6 | Sqm | 225 | ₹1,05,435 |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto | 619.25 | cum | 6,091 | ₹37,71,851.75 |
| 6 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. | 186 | Sqm | 20 | ₹3,720 |
| 7 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: | 186 | Sqm | 314 | ₹58,404 |
| 8 | Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface | 135 | cum | 1,286 | ₹1,73,610 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1008832.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .