Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹73,500
EMD Value
₹2,205
Closing Date
15 Jun 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer JSD PHE Mech Rural Division Sgr
Executive Engineer JSD PHE Mech Rural Division Sgr
Urgent nature of repair/replacement works to be carried out at various WSSs of Sub-Division Budgam
2023_PHE_215672_1
PHE/MRD/TS 16 OF 06/2023
Open Tender
Miscellaneous Works
Item Rate
5 days
BUDGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Executive Engineer JSD PHE Mech Rural Division Sgr
₹2,205
15 Jun 2023
8 Jun 2023
15 Jun 2023
8 Jun 2023
15 Jun 2023
8 Jun 2023
Amount
Water supply scheme Narbal. Providing fitting of 11KV cable termination kits suitable for input cables of HT/LT Distribution transformer and tapping point of the substation (input/output). It should be weather proof outdoor; the terminating kits shall preferably be PUSH ON / Heat shrink type with weather shields, shielding ends. Included is cost on account of disconnection / dismantling of existing damaged laid cables with tools, tackles and skilled labour required as per site conditions
Getting clearance from concerned Grid station, Disconnecting of the 11 KV HT Circuit near main tapping point. Dismantling of the ABC cable from 06 No titled poles. The following works are needed to be executed. • Earth work excavation around the completely Tilted poles 06 no poles by manual labour. • Removing of the concrete from the pole, plate periphery with hammering of bottom plate and cross arms to remove unwanted bending if any due to falling impact. • Erecting of the completely uprooted pole and tilted poles by ropes, skilled labour in the field with all allied tools and tackles. • Concrete bottoming of the poles as per IEE rules after erecting. The work is to be carried out by skilled electrician with shifting of items to be fitted, with all tools and tackles as desired keeping the accessibility to paddy land route in consideration. Finally Connecting to tapping pint, testing on load and then full load.
Supply, Installment , Testing & Commissioning of outdoor 50 watt LED lighting with Auxiliary fittings as per site requirement and as per technical specifications as under The LED lighting Fixtures and assembles ( complete in all respects ) confirming to latest relevant IS : codes & standards are to be installed within the premises of pumping stations / houses , as per requirement . wattage = 50 watt. Type LED wall Mounted / outdoor. No. of MCB single phase 9 Amp. (01no) Copper wire Multi stranded = 2.5mmsq (10mtrs)
Water Supply Scheme Puhroo 2nd Providing / fitting of 11KV link set heavy duty, Corsisting of three links each comprising of 12 " knife having eye hole at top for connecting / disconnecting the feeder / phase lines . Mounted suitably on channel of suitable size , insulators , Grip etc. The job includes providing / fitting of screwed fasteners , washers of suitable size as per site requirement
Water Supply Scheme Nindwandpora Cost on account of carriage / handling / fitment charges for the well submersible pumping unit shifted from temporary store at sub divisional office to pumping station of water supply scheme Nindwandpora
Water Supply Scheme Patvaw Cost on account of carriage / handling, fitment charges for the 63 KVA HT/LT Transformer from water filling point Ompora to pumping station of water supply scheme Patvaw.
Water Supply Scheme Heewudder Repairs / relocation of 15m of rising main from base of OHT to top dropping point by way of : a ) Dismantling / cutting of profusely leaking portion of rising main embedded in concrete works of OHT by way of shifting of oxy-acetylene welding machine unit tools , tackles , skilled labour to site. b ) Cost on account of carriage / handling of 18m of dismantled 80 mm Dia GI pipes from temporary storage in the premises of sub divisional office and received from Peripheral Sub Division to working site of water supply scheme Heewuder c ) Providing and fitting of 12mm thick 80 mm dia flanges to the pipe ( 06 Nos ) d ) Providing / fitting of 80 mm Dia GI / MS flanged bends -03 No e ) Providing / fitting of desired sized rubber insertion washers and nuts and bolts. f ) The job includes all welding charges involved at site as per site requirement for arrangement of welding DG set / power generator with allied cable , tools , and tackles shifted to site .The work is needed to be executed by skilled workers keeping the nature of job and site constraints in view . g ) Testing of new system for leakages after repairs.
M/S BHAT ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .