Tender Value
₹85.9 L
EMD Value
₹1.7 L
Closing Date
12 Jun 2026, 3:00 pm6d left
Design, Supply, Erection, Testing & Commissioning of 25kV, 50Hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm HDG copper contact wire, LT supply transformer stations including modifications to the existing OHE in view of proposed " Augmentation of homing capacity from 225 to 300 locomotives at ELS/Lallaguda" of South Central Railway
E29CTrDSC_01-2026-27
E29CTrDSC_01-2026-27
Open
9 Months
Hyderabad, Telangana
₹0
₹1.7 L
14 May 2026
14 May 2026
29 May 2026
A2-SOR: Foundation items (incl. Supply & Erection) 1157855.00 Below/P
Item Breakup - A1-SOR: OHE & PSI Items
Per Erection/Labour Track KM Total 100330.00 Item- 2 1(c) Preparation of Traction Working Rule Diagram along with Working Instructions S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 11869.00 Item- 3 1(d)Supply and Installation of Traction Working Rule Diagram Boards SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Square Erection/Labour Foot Total 30504.00 Item- 4 3(a)Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 41580.00 Item- 5 3(b)Erection of TTCs, Portals and Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 167937.00 Item- 6 3(e)Supply and erection of Guy rod assembly. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 104510.00 Item- 7 4(a)(i)Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 131940.00 Item- 8 4(a)(ii)Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 6476.00 Item- 9 4(a)(iv) Supply (without Insulators) and Erection of Single Cantilever Assembly for Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 95100.00 Item- 10 4(a)(v) Erection of Two Cantilever Assemblies on same structure or support for Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 12952.00 Item- 11 4(a)(vi) Erection of Three Cantilever Assemblies on same structure or support for Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 7436.00 Item- 12 6(a) Supply and Erection of Regulated Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Per Supply/Material Track KM
Per Erection/Labour Track KM Total 36316.50 Item- 13 6(c) Supply and Erection of Regulated Contact wire (Regulated with Briddle wire) SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Per Supply/Material Track KM
Per Erection/Labour Track KM Total 25664.50 Item- 14 7(c) Erection of Large span Wire (130 sq.mm) S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 20700.00 8(a)(v) Supply and Erection of Regulating Equipment With Counter-Weight assembly for Item- 15 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 149166.00 8 (a)(vi) Supply and Erection of Regulating Equipment With Counter-Weight assembly for Tramway Item- 16 type OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 345408.00 Item- 17 8(b)(ii) Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 55926.00 Item- 18 8(b)(vi) Supply (without Insulator) and Erection of Materials for Termination of Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 55080.00 9(a) Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for Item- 19 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 25372.00 9(b) Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for regulated Item- 20 Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 24509.00 10(a) Extra on item 6(a) or 6(c) for Supply and Erection of additional fittings required at a turnout, Item- 21 cross-over or over-lap etc S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Total 41898.00 Item- 22 11(a)(i) Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 41120.00 Item- 23 11(a)(ii) Supply (without Insulator) and Erection of 25 kV Solid Core Suspension Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 12580.00 Item- 24 11(b) Supply (without Insulator) and Erection of 25 kV Post Insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 28464.00 12(b) Supply (without Insulators) and Erection of 25 kV Section Insulator Assembly for Tramway Item- 25 OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 317442.00 13(a) Supply (without Insulators) and Erection of 25 kV Single Pole Isolator without earth contact Item- 26 assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 172076.00 13(b) Supply (without Insulators) and Erection of 25 kV Double Pole Isolator without earth contact Item- 27 assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 142830.00 Item- 28 13(c) Supply and Erection of Earth contact assembly for an isolator S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 27538.00 Item- 29 13(d) Supply and Erection of an Interlocking device S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 9808.00 Item- 30 15(a) Supply and Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Total 11120.00 Item- 31 15(b) Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 28060.00 Item- 32 16(a) Supply and erection of structure bond S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 22740.00 Item- 33 16(b) Supply and erection of longitudinal bond. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 7024.00 Item- 34 16(c) Supply and erection of transverse and special bond S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 10216.00 Item- 35 17(a) Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 9716.00 Item- 36 17(b) Supply and erection of earth bus. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 5260.00 Item- 37 17(d) Supply and Erection of Copper Strips (25 mm x 3 mm) for Equipment Earthing S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 4176.00 Item- 38 26(a)(ii) Supply and erection of 18 mm Copper Bus-bar. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 71880.00 31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal of Item- 39 Cantilever Assembly from old Mast or Support S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 28050.00 Item- 40 31(b) Provision of an additional bracket assembly / assemblies on a mast or support. S No. Item Description of Item Unit Qty Rate Amount No SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY
Erection/labour Total 11580.00 Item- 41 31(c) Dismantling of Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
Per Erection/labour Track KM Total 6978.50 Item- 42 31(e) Splicing and Extension of Anchored OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 12790.00 Item- 43 31(f) Dismantling of Section Insulator S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 5244.00 Item- 44 31(h) Dismantling of an Isolator S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 3560.00 Item- 45 31(k)(i) Dismantlement of OHE mast or structure by cutting. S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 15310.00 Item- 46 31(k)(ii) Dismantlement of Upright of TTC/Portal by cutting. S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 21880.00 Item- 47 31(l)(i) Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 57600.00 Item- 48 31(n) Dismantling of guy rod S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 3144.00 31(o) Releasing of Multiple Cantilever Crossarm cantilever assemblies where single cantilever Item- 49 assembly is leftover S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 1048.00 Item- 50 31(r) Dismantling of Cantilever assembly including insulators. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 4800.00 31(t)(i) Dismantling of a regulating equipment (Three-pulley type) with counter weight assembly for Item- 51 Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY
Erection/Labour Total 10168.00 31(t)(ii) Dismantling of a regulating equipment (Three-pulley type) with counter weight assembly Item- 52 for Tramway OHE. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 11244.00 Item- 53 31(t)(iii) Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 1480.00 Item- 54 31(t)(iv) Dismantling of all types of Copper Jumpers S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 1120.00 Item- 55 31(t)(vi) Dismantling of Termination for Tramway type Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 3090.00 Item- 56 31(t)(ix) Re-adjustment of OHE Spans, including droppers S No. Item Description of Item Unit Qty Rate Amount No
Each Erection/Labour Span Total 43760.00 Item- 57 31(t)(x) Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 4350.00 32/3(a) Extra charges for Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Item- 58 Switching Stations under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 26507.25 Item- 59 32/3(b) Extra charges for Erection of TTCs, Portals and Small Parts Steel (SPS) under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 91602.00 Item- 60 32/3(e)Extra charges for erection of Guy rod assembly under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 7840.00 32/4(a) (iv) Extra charges for Erection of Single Cantilever assembly for Tramway OHE under power Item- 61 block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 7560.00 32/6(c) Extra charges for Erection of regulated contact wire (Regulated with briddle wire) under Item- 62 power block. SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Per Erection/Labour Track KM Total 16926.70 32/8(a) (vi) Extra charges for Erection of regulating equipment with counter-weight for Tramway Item- 63 OHE under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 20000.00 32/8(b) (vi) Extra charges for Erection of Materials for Termination of Tramway OHE under power Item- 64 block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 7000.00 32/9(b) Extra charges for Erection of anti creep with galvanised steel wire for regulated Tramway Item- 65 OHE under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 3372.00 32/10(a) Extra charges for Extra on item 6(a) or 6(c) for Erection of additional fittings required at a Item- 66 turnout, cross-over or over-lap under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 2500.00 Item- 67 32/11(a) (i)Extra charges for Erection of 25 kV solid core cut-in insulator under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 8532.00 Item- 68 32/11(a) (ii)Extra charges for Erection of 25 kV solid core suspension insulator under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 1482.00 Item- 69 32/11(b)Extra charges for Erection of 25 kV Post Insulator under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 5712.00 32/12(a) Extra charges for Erection of 25 kV Section Insulator Assembly for Conventional OHE Item- 70 under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 12468.00 32/13(a)Extra charges for Erection of 25 kV Single Pole Isolator without earth contact assembly Item- 71 under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 11564.00 32/13(b) Extra charges for Erection of 25 kV Double Pole Isolator without earth contact assembly Item- 72 under power block SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 8376.00 Item- 73 32/13(c) Extra charges for Erection of earth contact assembly for an isolator under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 824.00 32/15(a) Extra charges for Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Item- 74 Jumper) under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 2492.00 32/15(b) Extra charges for Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) Item- 75 under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 6800.00 Item- 76 32/26(a)(ii) Extra charges for Erection of 18 mm Copper Bus-bar under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 4380.00 32/31(a) Extra charges for Transfer of Overhead Equipment from one Mast or Support to another, Item- 77 including removal of Cantilever Assembly from old Mast or Support under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 28050.00 32/31(b) Extra charges for Provision of additional bracket assembly / assemblies on a mast or Item- 78 support under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 4632.00 Item- 79 32/31(c) Extra charges for Dismantling of Over Head Equipment under power block. S No. Item Description of Item Unit Qty Rate Amount No
Per Erection/Labour Track KM Total 2093.55 Item- 80 32/31(e) Extra charges for Splicing and extension of anchored OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 7674.00 Item- 81 32/31(f) Extra charges for Dismantling of section Insulator under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 5244.00 32/31(k)(i) Extra charges for Dismantlement of OHE mast or structure by cutting under power Item- 82 block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Total 12248.00 32/31(l)(i) Extra charges for Retrieval of traction masts, main mast of switching station, TTC Item- 83 uprights etc. under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 46080.00 Item- 84 32/31(n) Extra charges for Dismantling of guy rod under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 2096.00 32/31(o) Extra charges for Releasing of Multiple Cantilever Crossarm cantilever assemblies where Item- 85 single cantilever assembly is leftover under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 1048.00 32/31(r) Extra charges for Dismantling of Cantilever assembly including insulators under power Item- 86 block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 3360.00 32/31(t)(ii) Extra charges for Dismantling of a regulating equipment (Three-pulley type) with Item- 87 counter weight assembly for Tramway OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 7496.00 32/31(t)(iii)Extra charges for Dismantling of anticreep with galvanized Steel wire or cadmium Item- 88 catenary wire under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 1480.00 Item- 89 32/31(t)(iv) Extra charges for Dismantling of all types of copper jumpers under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 1120.00 32/31(t)(vi) Extra charges for Dismantling of Termination for Tramway type Overhead Equipment Item- 90 under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 2575.00 Item- 91 32/31(t)(ix) Extra charges for Re-adjustment of OHE Spans, including droppers under power block S No. Item Description of Item Unit Qty Rate Amount No
Each Erection/Labour Span Total 43760.00 Item- 92 34(f) Excavation of Earth, filling including compaction in all kinds of soil S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 14602.00 SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Item- 93 34(j) Providing and Laying Pitching with Stone Boulders S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 332950.00 Item- 94 36(a) Unloading of all types of Steel Structures. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 1820.00 Item- 95 36(b) Loading of all type of Steel Structures. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 3120.00 Item- 96 37(a) Unloading of all types of Copper & Aluminum conductors. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 58.80 Item- 97 37(b) Loading of all types of Copper & Aluminum conductors. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 58.80 Item- 98 38 Transportation of OHE structures / Materials / Equipments S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 5684.00 Item- 99 41(b) Supply and Erection of Enamel type Public Caution board S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 4690.00 Item- 41(c) Supply and Erection of Enamel type Staff Caution board 100 S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 3126.00 Item- 41(d) Supply and Erection of Retro-Reflective Type Electric Engine Stop Board/Caution Unwired 101 Turnout Board S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 7178.00 Item- 41(e) Supply and Erection of Retro-Reflective Type Power Block Working Limit Board 102 S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 2926.00 Item- 41(f) Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 103 SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 2004.00 Item- 41(h) Supply and Erection of Vitreous Enameled 25 kV Danger Board with skull & bones for Overline 104 Structure (OLS) and Auxiliary Transformer S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 1062.00 Item- 41(j) Supply and Erection of Retro-Reflective Sigma Board 105 S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 1738.00 Item- 42 Supply and Erection of Shock Treatment Chart 106 S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 6132.00
Item Breakup - A2-SOR: Foundation items (incl. Supply & Erection)
Supply & Erection Total 100040.00 Item- 2 2(a)(ii)Concrete for foundations and plinth in Rocky Soil S No. Item Description of Item Unit Qty Rate Amount No
Supply & Erection Total 102590.00 Item- 3 2(b)Concrete for foundations and plinth in other than Hard and Rock Soil S No. Item Description of Item Unit Qty Rate Amount No
Supply & Erection Total 807625.00 Item- 4 2 (i) Breaking of foundation up to 200 mm below track formation and drain / PF surface etc S No. Item Description of Item Unit Qty Rate Amount No
Supply & Erection Total 147600.00
Item Breakup - B1-SOR: Steel Supply
Supply/Material Total 1586088.00 Item- 2 3(bs)Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 1218330.00 SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY 3[cs]Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Item- 3 Portals. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 294512.00
Item Breakup - B2-SOR: Copper Supply
Supply/Material Total 13500.00 Item- 2 6(ds)Supply of 5 mm dia Hard Drawn Round Copper Dropper Wire S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 22500.00 Item- 3 6(es) Supply of Cadmium Copper Bridle Wire (7/2.1mm) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 11864.00 Item- 4 7(cs) Supply of 130 sq.mm Cadmium Copper Large Span Wire S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 81200.00 Item- 5 15(as) Supply of 50 sq.mm Annealed Stranded Copper Jumper Wire S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 17654.00 Item- 6 15(bs) Supply of 160 sq.mm Annealed Stranded Copper Jumper Wire S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 42005.00
Item Breakup - B3-SOR: Insulator Supply
Supply/Material Total 125100.00 Item- 2 4(axx)Supply of Composite Stay and Bracket Insulators for Item No. 4(a)(i) / 4(a)(iv) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 3823.00 8(bx)Supply of Porcelain 9-ton Insulator for item no. 8(b)(i)/8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b) Item- 3 (ix)/9(a)/9(b)/9(c)/9(d)/11(a)(i)/11(a)(ii) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 186525.00 8(bxx)Supply of Composite 9-ton Insulator for item no. 8(b)(i)/8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b) Item- 4 (ix)/9(a)/9(b)/9(c)/9(d)/11(a)(i)/11(a)(ii) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Total 1920.00 Item- 5 11(bx)Supply of Post Insulator for Item no. 11(b) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 133392.00 Item- 6 12(ax)Supply of Sectioning and 9-ton Insulators for Item no. 12(a) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 64308.00 Item- 7 13(ax)Supply of Post and Operating Rod Insulators for Item no. 13(a)/13(f). S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 85416.00
Item Breakup - E -Non-SOR: Tools and plants
Supply/Material Total 28796.00 Item- 2 Supply of Operating pole for 25 kV dropout fuse AC traction S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 9776.00 Supply of Portable hand operated gearless pulling and lifting machine (TIRFOR) complete with set Item- 3 of capacity 5.2 T pulling and 3.2T lifting (5.2/3.2T) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 28320.00 Item- 4 Supply of Light weight manual telescopic pruner S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 16638.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC2022ALLACS1TO10_merged.pdf GCC 2022 ALL ACS 1 TO 10
ATTACHMENT
I_CT_GCC-
ATTACHMENT
AnnexuresmentionedinNIT.pdf
ATTACHMENT
ELSLGDTENDERDOCUMNET.pdf
ATTACHMENT
I_CT_GCC-
ATTACHMENT
NEFTform.pdf
ATTACHMENT
BGform.pdf
ATTACHMENT
GCC2022ALLACS1TO10_merged.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_221.pdf
ATTACHMENT
Download all tender documents and submit your bid