| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.8 LAccepted-Finance | ₹28.8 L | L1 | Accepted-Finance Evaluated |
| 2 | L2₹33.1 LRejected-Finance | ₹33.1 L | L2 | Rejected-Finance Not Being Lowest |
| 3 | L3₹34.0 LRejected-Finance | ₹34.0 L | L3 | Rejected-Finance Not Being Lowest |
| Sl No | Description | Qty | Unit | Ms. D.G. SHIRKE L2 | M.H Construction L3 | M/S-B.R.SONAWANE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (un-reinforced) in ground floor & paving n.exc. 15cm thick below or above ground level. | 25.88 | Cum | 120 ₹3,105.60 | 25 ₹647 | 100 ₹2,588 |
| 2.00 | Earth work in excavation in any type of soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains not exceeeding 1.5m in depth (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. complete all as specified and directed by Engineer-in-Charge .
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 800 | Cum | 160 ₹1.3 L | 150 ₹1.2 L | 150 ₹1.2 L |
| 3.00 | Earth work in excavation in any type of soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains exceeeding 1.5m and n.exc 3.0m in depth (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. complete all as specified and directed by Engineer-in-Charge .
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 80 | Cum | 200 ₹16,000 | 200 ₹16,000 | 170 ₹13,600 |
| 4.00 | Returning, filling in excavated material (soil) including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft / loose soil etc complete all as specified and directed by Engineer-in-Charge | 200 | Cum | 30 ₹6,000 | 20 ₹4,000 | 30 ₹6,000 |
| 5.00 | Removing surplus excavated soil to a distance exc 50 m and n.exc 100m deposited where directed at a level n.exc 1.5 m above the starting point etc complete all as specified and directed by Engineer-in-Charge | 104 | Cum | 35 ₹3,640 | 30 ₹3,120 | 35 ₹3,640 |
| 6.00 | Removing blockage from water closet, floor or gully or Nahani trap and bends by rodding thoroughly and pouring water under pressure and cleaning, clearing the drainage to efficient and smooth flow of sludge/ waste water all as specified and dircted by Engineer in charge.
Note:-(i) Contractors supervisor will report on all working days along with two safaiwala and printed contractors firm and name complaint slip book at 0830 hrs at B/R-II to recieve complaints for blockage and to submit completion report on the same day by 1700 hrs. (ii) Printed complaint slip book, area wise as per format approved by Engineer In Charge shall be provided and maintained by contractor.
(iii) Rate quoted above shall be deemed to include the cost of T&P, equipment , safetey device along with sufficient labour to full fill the requirement to the entire satisfaction of Engineer-in-Charge. (iv) If there is any major blockage in sewer line / spetic tank for which additionalSafaiwalas and special T&P is required, same shall be provided by contractor without extra cost to Govt . Therefore contractor is adviced to visit the site before quoting the rates in tender. (v) In the event he fails to attend the complaint recovery @ Rs. 1000 per day shall be levied from the amount due to the contractor. | 3,000 | Each job | 100 ₹3 L | 25 ₹75,000 | 45 ₹1.4 L |
| 7.00 | Demolition of brickwork or stone bouilder masonary built in cement mortar or lime mortar complete all as specified | 50 | Cum | 125 ₹6,250 | 30 ₹1,500 | 100 ₹5,000 |
| 8.00 | M&L for brick work with subclass B Bricks straight or curved on plan exceeding 6 M mean radius built in cement mortar (1:6) | 50 | Cum | 5,400 ₹2.7 L | 4,500 ₹2.3 L | 4,500 ₹2.3 L |
| 9.00 | Taking down cement mortar plaster on brick or stone walls, raking out joints, hacking for key complete all as directed | 200 | Sqm | 10 ₹2,000 | 3 ₹600 | 10 ₹2,000 |
| 10.00 | M&L for rendering, 10 mm thick on brick / concrete surfaces in cement mortar 1:6 surfaces finished even and fair without using extra cement including WPC @ 3% etc complete all as specified and directed. ( Note :- WPC will be measured separately). | 317 | Sqm | 230 ₹72,910 | 150 ₹47,550 | 190 ₹60,230 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
11 Apr 2026, 6:00 pmClosed
Garrison Engineer (North) Ahilyanagar
Military Engineer Services Garrison Engineers (North) Nagar Pathardi Road Ahmednagar Fort Ahilyanagar 414 002
MAINTENANCE AND CLEANING OF SEWAGE LINE INCLUDING SEWAGE SYSTEM, CHAMBERS SEPTIC TANK AND MAN HOLES SOAKAGE PITS ETC UNDER AGE B/R-II AT GE (N) AHILYANAGAR
2026_MES_757018_1
8231/E8
Open Tender
Miscellaneous Works
335 days
Garrison Engineer (North) Ahilyanagar
As per NIT
8 documents required · 8 mandatory
₹500
Garrison Engineer (North) Ahilyanagar
₹98,000
Yes
9 Jun 2026
20 Mar 2026
13 Apr 2026
20 Mar 2026
11 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Demolition of cement concrete (un-reinforced) in ground floor & paving n.exc. 15cm thick below or above ground level. | - | Cum | - | - | |
Earth work in excavation in any type of soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains not exceeeding 1.5m in depth (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. complete all as specified and directed by Engineer-in-Charge .
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | - | Cum | - | - | |
Earth work in excavation in any type of soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains exceeeding 1.5m and n.exc 3.0m in depth (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. complete all as specified and directed by Engineer-in-Charge .
Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | - | Cum | - | - | |
Returning, filling in excavated material (soil) including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft / loose soil etc complete all as specified and directed by Engineer-in-Charge | - | Cum | - | - | |
Removing surplus excavated soil to a distance exc 50 m and n.exc 100m deposited where directed at a level n.exc 1.5 m above the starting point etc complete all as specified and directed by Engineer-in-Charge | - | Cum | - | - | |
Removing blockage from water closet, floor or gully or Nahani trap and bends by rodding thoroughly and pouring water under pressure and cleaning, clearing the drainage to efficient and smooth flow of sludge/ waste water all as specified and dircted by Engineer in charge.
Note:-(i) Contractors supervisor will report on all working days along with two safaiwala and printed contractors firm and name complaint slip book at 0830 hrs at B/R-II to recieve complaints for blockage and to submit completion report on the same day by 1700 hrs. (ii) Printed complaint slip book, area wise as per format approved by Engineer In Charge shall be provided and maintained by contractor.
(iii) Rate quoted above shall be deemed to include the cost of T&P, equipment , safetey device along with sufficient labour to full fill the requirement to the entire satisfaction of Engineer-in-Charge. (iv) If there is any major blockage in sewer line / spetic tank for which additionalSafaiwalas and special T&P is required, same shall be provided by contractor without extra cost to Govt . Therefore contractor is adviced to visit the site before quoting the rates in tender. (v) In the event he fails to attend the complaint recovery @ Rs. 1000 per day shall be levied from the amount due to the contractor. | - | Each job | - | - | |
Demolition of brickwork or stone bouilder masonary built in cement mortar or lime mortar complete all as specified | - | Cum | - | - | |
M&L for brick work with subclass B Bricks straight or curved on plan exceeding 6 M mean radius built in cement mortar (1:6) | - | Cum | - | - | |
Taking down cement mortar plaster on brick or stone walls, raking out joints, hacking for key complete all as directed | - | Sqm | - | - | |
M&L for rendering, 10 mm thick on brick / concrete surfaces in cement mortar 1:6 surfaces finished even and fair without using extra cement including WPC @ 3% etc complete all as specified and directed. ( Note :- WPC will be measured separately). | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
PS8231.pdf
Tender Documents • 1.19 MB
BOQ_847965.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid