Tender Value
₹1.5 L
EMD Value
₹1,500
Closing Date
2 Sept 2024, 3:00 pmClosed
BDO,Aranthangi
Pt.Union office,Aranthangi
Providing Vermi compost shed at Mangalanadu East in Mangalanadu Panchyat
2024_RDTN_478210_1
15th 24-25 VPT MANGALANADU WORK 3
Open Tender
Civil Works
Item Rate
180 days
Aranthangi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,500
3 Sept 2024
29 Aug 2024
2 Sept 2024
29 Aug 2024
2 Sept 2024
29 Aug 2024
Amount
Providing Vermi compost shed at Mangalanadu East in Mangalanadu Panchyat
SHED WORK
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete
Supply of 63mm OD MS pipe for post including cost and conveyance and all labour charges etc.complete.
Supply and fixing Mild steel tube section for Reepers including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and fixing GI Sheet 0.47mm thick sheet roofing and side Daday fixed with self Diver screw etc.,complete
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
CIVIL WORK
Earth work excavation For Foundation in all clauses of soil and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complaying with standard specification
Cement Concrete in 1 : 4:8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Cement Concrete in 1 :2 : 4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats with best approved colour pigments including cost and conveyace of all materials to work site and all labour charges etc. complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
J. SANKAR (BID ID -1125684)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .