Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC | ₹22.6 L | L1 | Accepted-AOC Letter of Acceptance to L1 Tenderer |
| 2 | L2₹23.1 LRejected-AOC | ₹23.1 L | L2 | Rejected-AOC Rejected tenderer due to highest amount quoted |
| 3 | L3₹23.4 LRejected-AOC | ₹23.4 L | L3 | Rejected-AOC Rejected tenderer due to highest amount quoted |
| 4 | L4₹23.7 LRejected-AOC | ₹23.7 L | L4 | Rejected-AOC Rejected tenderer due to highest amount quoted |
| 5 | L5₹26.2 LRejected-AOC | ₹26.2 L | L5 | Rejected-AOC Rejected tenderer due to highest amount quoted |
| Sl No | Description | Qty | Unit | M/S.KCP CONSTRUCTIONS L4 | A.PALANIVEL L2 | SSM INFRA CONSTRUCTION L3 | SAMPATH R L5 | Thanmaya Constructions L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | ||||||||
| 2.00 | Km 0/0-1/0 | 10.44 | Cum | 4,158 ₹43,409.52 | 3,140 ₹32,781.60 | 3,800 ₹39,672 | 4,300 ₹44,892 | 3,964.45 ₹41,388.86 |
| 3.00 | km 1/0-1/780 | 6.08 | Cum | 4,166 ₹25,329.28 | 3,140 ₹19,091.20 | 3,850 ₹23,408 | 4,500 ₹27,360 | 3,971.52 ₹24,146.84 |
| 4.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher | ||||||||
| 5.00 | km 0/0-1/780 | 37.88 | Cum | 2,086 ₹79,017.68 | 2,250 ₹85,230 | 2,052 ₹77,729.76 | 2,000 ₹75,760 | 1,989.55 ₹75,364.15 |
| 6.00Applying Prime coat over WMM surface ( treated with primer) using 7Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | ||||||||
| 7.00 | km 0/0-1/780 | 385.55 | Sqm | 73.5 ₹28,337.92 | 78 ₹30,072.90 | 72.76 ₹28,052.62 | 80 ₹30,844 | 70.1 ₹27,027.06 |
| 8.00Applying tack coat over Primer surface using 2.5 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | ||||||||
| 9.00 | km 0/0-1/780 | 385.55 | Sqm | 17 ₹6,554.35 | 17 ₹6,554.35 | 20 ₹7,711 | 19 ₹7,325.45 | 16.35 ₹6,303.74 |
| 10.00Applying tack coat over Primer surface using 3 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | ||||||||
Tender Value
₹28 L
EMD Value
₹28,000
Closing Date
9 Mar 2026, 3:00 pmClosed
Block Development Officer(BP),Madhuranthagam Block
Block Development Office, Madhuranthagam Block
Renewal BT in NT Road to Krishnapuram Road Km 0/0 -1/780 (R 46 - PUR) at Nelvoy Panchayat in Madhuranthagam Block under Rural Road Maintenance Scheme for the year 2025-26
2026_RDTN_670238_1
Rc.No.2614/2025/A13 Dated 02.03.2026
Open Tender
Civil Works - Roads
90 days
NT road to Krishnapuram road
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,000
Yes
1 Jun 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher
Applying Prime coat over WMM surface ( treated with primer) using 7Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Applying tack coat over Primer surface using 2.5 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Applying tack coat over Primer surface using 3 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_805462.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_805462.xls
BOQ • 0.32 MB
TechinalBid.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid