Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC | ₹22.6 L | L1 | Accepted-AOC Letter of Acceptance to L1 Tenderer |
| 2 | L2₹23.1 L+₹48,913.12 (2.17%)Rejected-AOC | ₹23.1 L+₹48,913.12 (2.17%) | L2 | Rejected-AOC Rejected tenderer due to highest amount quoted |
| 3 | L3₹23.4 L+₹80,765.48 (3.58%)Rejected-AOC | ₹23.4 L+₹80,765.48 (3.58%) | L3 | Rejected-AOC Rejected tenderer due to highest amount quoted |
| 4 | L4₹23.7 L+₹1.1 L (4.84%)Rejected-AOC | ₹23.7 L+₹1.1 L (4.84%) | L4 | Rejected-AOC Rejected tenderer due to highest amount quoted |
| 5 | L5₹26.2 L+₹3.6 L (16.0%)Rejected-AOC | ₹26.2 L+₹3.6 L (16.0%) | L5 | Rejected-AOC Rejected tenderer due to highest amount quoted |
| Sl No | Description | Qty | Unit | M/S.KCP CONSTRUCTIONS L4 | A.PALANIVEL L2 | SSM INFRA CONSTRUCTION L3 | SAMPATH R L5 | Thanmaya Constructions L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | ||||||||
| 2.00 | Km 0/0-1/0 | 10.44 | Cum | 4,158 ₹43,409.52 | 3,140 ₹32,781.6 Lowest | 3,800 ₹39,672 | 4,300 ₹44,892 | 3,964.45 ₹41,388.86 |
| 3.00 | km 1/0-1/780 | 6.08 | Cum | 4,166 ₹25,329.28 | 3,140 ₹19,091.2 Lowest | 3,850 ₹23,408 | 4,500 ₹27,360 | 3,971.52 ₹24,146.84 |
| 4.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher | ||||||||
| 5.00 | km 0/0-1/780 | 37.88 | Cum | 2,086 ₹79,017.68 | 2,250 ₹85,230 | 2,052 ₹77,729.76 | 2,000 ₹75,760 | 1,989.55 ₹75,364.15 Lowest |
| 6.00Applying Prime coat over WMM surface ( treated with primer) using 7Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | ||||||||
| 7.00 | km 0/0-1/780 | 385.55 | Sqm | 73.5 ₹28,337.92 | 78 ₹30,072.9 | 72.76 ₹28,052.62 | 80 ₹30,844 | 70.1 ₹27,027.06 Lowest |
| 8.00Applying tack coat over Primer surface using 2.5 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | ||||||||
| 9.00 | km 0/0-1/780 | 385.55 | Sqm | 17 ₹6,554.35 | 17 ₹6,554.35 | 20 ₹7,711 | 19 ₹7,325.45 | 16.35 ₹6,303.74 Lowest |
| 10.00Applying tack coat over Primer surface using 3 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | ||||||||
Tender Value
₹28 L
EMD Value
₹28,000
Closing Date
9 Mar 2026, 3:00 pmClosed
Block Development Officer(BP),Madhuranthagam Block
Block Development Office, Madhuranthagam Block
Renewal BT in NT Road to Krishnapuram Road Km 0/0 -1/780 (R 46 - PUR) at Nelvoy Panchayat in Madhuranthagam Block under Rural Road Maintenance Scheme for the year 2025-26
2026_RDTN_670238_1
Rc.No.2614/2025/A13 Dated 02.03.2026
Open Tender
Civil Works - Roads
Item Rate
90 days
NT road to Krishnapuram road
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,000
Yes
1 Jun 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | - | - | - | - |
| 2 | Km 0/0-1/0 | 10.44 | Cum | 4,864.36 | ₹50,783.92 |
| 3 | km 1/0-1/780 | 6.08 | Cum | 4,873.03 | ₹29,628.02 |
| 4 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher | - | - | - | - |
| 5 | km 0/0-1/780 | 37.88 | Cum | 2,441.17 | ₹92,471.52 |
| 6 | Applying Prime coat over WMM surface ( treated with primer) using 7Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | - | - | - | - |
| 7 | km 0/0-1/780 | 385.55 | Sqm | 86.01 | ₹33,161.16 |
| 8 | Applying tack coat over Primer surface using 2.5 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | - | - | - | - |
| 9 | km 0/0-1/780 | 385.55 | Sqm | 20.06 | ₹7,734.13 |
| 10 | Applying tack coat over Primer surface using 3 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_805462.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_805462.xls
BOQ • 0.32 MB
TechinalBid.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .