| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹130.3 CrAdmitted-Finance | ₹130.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹141.8 CrAdmitted-Finance | ₹141.8 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Rejected-Technical BU S S F S FLATS NEAR INCOME TAX COLONY OUTER RING ROAD PITAMPURA DELHI 110034 | DELHI | NORTH WEST DELHI | DELHI | 110034 | - | - | Rejected-Technical technically not qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical technically not qualified |
| Sl No | Description | Qty | Unit | NGGADHIYA L2 | India Commercial Services L1 |
|---|---|---|---|---|---|
| 1.00Survey and Design Engineering: | |||||
| 1.01 | Planning , layout plan, toptopographical survey, geotechnical investigation along with design engineering of 1000 MW Pugal Solar Park Phase-I plots, including buildings and other facilities etc as per scope of work.
Land levelling and dressing
Proper levelling and dressing, preparation of slope of land ,Area for PPS, Road way and other infrastructure development, transmission line route from one PPS to another PPS etc in about 2000 Hect. Available land, the work shall be carried out as per scope of work. | 2,000 | Hect | 4,421.89 ₹88.4 L | 23,333.33 ₹4.7 Cr |
| 2.00Construction of New roads/strengthening of existing roads including hume pipe culverts and causeways:- | |||||
| 2.01 | Construction of 9 MTR (3.75-meter BT top + 1.0 m strip on either side) wide road with Trenches and Plantation Along Roads as per section- and details mentioned in scope of work/DPR | 17.5 | KM | 1,14,42,849.81 ₹20.0 Cr | 77,33,333 ₹13.5 Cr |
| 3.00Water Infrastructure System:- | |||||
| 3.01 | Part-A- OUTLET, RWR & WTP
Infrastructure for Water supply from IGNP to park reservoir at PPS-I, about 14.107 Kms.
a) Provision for providing pipe outlet from RD 682 of Indira Gandhi Main cana.
b) Cost of raw water sump well at RWPS near canal RD 682
c) Construction of two units of RWR,having capacity of 13.40 ML (combined) with inlet and outlet arrangements complete.
d) Construction of compact Water Treatment Plant of 0.70 MLD with 20 hours working including all relevant civil, mechanical, electrical, instrumentation etc complete in all respect. | 1 | Lump-Sum | 2,26,67,780.46 ₹2.3 Cr | 3,33,33,333 ₹3.3 Cr |
| 3.02 | PART -B: PIPE LINE WORKS
a) P, L & Jointing of Pumping Mains of pvc -o pipe Class 500 PN-16 for Transmission of water from canal to RWR and further till OHSR including required specials & appurtenances etc complete.
b) P, L & Jointing of Pumping Mains of HDPE pipe Class PE 80 PN-6 for Distribution of water from OHSR to plots including required specials Bulk Flowmeter & appurtenances etc complete
c) P, L & Jointing of Pumping Mains of pvc -o pipe Class 500 PN-16 for recyling of water back to RWR including pumps and required specials & appurtenances etc complete
d) P, L & Jointing of Pumping Mains of MS pipes including required specials & appurtenances etc complete for internal piping | 1 | Lump-Sum | 4,88,99,268.33 ₹4.9 Cr | 5,33,33,333 ₹5.3 Cr |
| 3.03 | PART-C: PUMPING STATIONS AND CLEAR WATER RESERVOIR/ OVERHEAD RESERVOIRS
a) Construction of Pump Houses for RWPS-near RD 682, RWPS Soorasar & CWPS-Soorasar complete
b) Provision for all required Mechanical, Electrical & Instrumentation works complete for all Pump Station (3 Nos.)
c) Construction of Clear Water reservoir and OHSRs at locations of Solar Park Soorasar
d) Construction of reservoir for storage of recycled water at different locations of Solar Park Soorasar | 1 | Lump-Sum | 2,57,70,703.81 ₹2.6 Cr | 5,33,33,333 ₹5.3 Cr |
| 3.04 | PART-D- Provision for construction of residential quarters, boundary wall, and store room, road etc. | 1 | Lump-Sum | 18,71,553.91 ₹18.7 L | 1,37,06,667 ₹1.4 Cr |
| 3.05 | PART-E- Cost of operation and maintenance of the system for 10 years after defect liability period of one year @ 7.5% | 1 | Lump-Sum | 73,00,331.44 ₹73.0 L | 2,00,00,000 ₹2 Cr |
Tender Value
₹155.2 Cr
EMD Value
₹3.1 Cr
Closing Date
29 Oct 2024, 6:00 pmClosed
Director (Technical)
E-166 Yudhisthir Marg C-Scheme Jaipur-302001
Design Engineering Supply and Construction of Civil and Miscellaneous Works For Infrastructure Development of Pugal Solar Parks at Dist Bikaner (Rajasthan) Against RSDCL TN 04(2024-25)
2024_RRECL_417606_1
RSDCL/TN-04(2024-25)
Open Tender
Civil Works
548 days
Pugal
Please refer Tender documents.
3 documents required · 3 mandatory
₹23,600
MD RSDCL
₹3.1 Cr
RRECL, Jaipur
25 Nov 2024
9 Sept 2024
30 Oct 2024
9 Sept 2024
29 Oct 2024
24 Sept 2024
23 Sept 2024
Amount
Survey and Design Engineering:
Planning , layout plan, toptopographical survey, geotechnical investigation along with design engineering of 1000 MW Pugal Solar Park Phase-I plots, including buildings and other facilities etc as per scope of work. Land levelling and dressing Proper levelling and dressing, preparation of slope of land ,Area for PPS, Road way and other infrastructure development, transmission line route from one PPS to another PPS etc in about 2000 Hect. Available land, the work shall be carried out as per scope of work.
Construction of New roads/strengthening of existing roads including hume pipe culverts and causeways:-
Construction of 9 MTR (3.75-meter BT top + 1.0 m strip on either side) wide road with Trenches and Plantation Along Roads as per section- and details mentioned in scope of work/DPR
Water Infrastructure System:-
Part-A- OUTLET, RWR & WTP Infrastructure for Water supply from IGNP to park reservoir at PPS-I, about 14.107 Kms. a) Provision for providing pipe outlet from RD 682 of Indira Gandhi Main cana. b) Cost of raw water sump well at RWPS near canal RD 682 c) Construction of two units of RWR,having capacity of 13.40 ML (combined) with inlet and outlet arrangements complete. d) Construction of compact Water Treatment Plant of 0.70 MLD with 20 hours working including all relevant civil, mechanical, electrical, instrumentation etc complete in all respect.
PART -B: PIPE LINE WORKS a) P, L & Jointing of Pumping Mains of pvc -o pipe Class 500 PN-16 for Transmission of water from canal to RWR and further till OHSR including required specials & appurtenances etc complete. b) P, L & Jointing of Pumping Mains of HDPE pipe Class PE 80 PN-6 for Distribution of water from OHSR to plots including required specials Bulk Flowmeter & appurtenances etc complete c) P, L & Jointing of Pumping Mains of pvc -o pipe Class 500 PN-16 for recyling of water back to RWR including pumps and required specials & appurtenances etc complete d) P, L & Jointing of Pumping Mains of MS pipes including required specials & appurtenances etc complete for internal piping
PART-C: PUMPING STATIONS AND CLEAR WATER RESERVOIR/ OVERHEAD RESERVOIRS a) Construction of Pump Houses for RWPS-near RD 682, RWPS Soorasar & CWPS-Soorasar complete b) Provision for all required Mechanical, Electrical & Instrumentation works complete for all Pump Station (3 Nos.) c) Construction of Clear Water reservoir and OHSRs at locations of Solar Park Soorasar d) Construction of reservoir for storage of recycled water at different locations of Solar Park Soorasar
PART-D- Provision for construction of residential quarters, boundary wall, and store room, road etc.
PART-E- Cost of operation and maintenance of the system for 10 years after defect liability period of one year @ 7.5%
PART-F: Miscllenous Works: a) Construction of Canal outlet at RD 682 of Indira Gandhi canal complete in all respect as per specifications and drawing by IGNP (Lump Sum) b) Supply, Erection, Testing & Commissioning of Overhead 11/33 KV Power Transmission Line with ACSR Conductor on Lattice Tower from different 33 KV GSS to various pumping stations as per JdVVNL Standard. c) Provision for fees to be deposited in various departments for road cutting and restoration, land & crop compensation etc aas per requirement. d) Provision for preparation for detailed project report including survey work
Light arrangement in the park:-
Erection of street lamp post lights at respective roads along with provision of lights in trench area ,transmission , offices, treatment plant, fire fighting area and other facility area of Solar Park such as pump house, water treatment plant as per scope work and Supply and erection of High Mask lights in common facility area/ near main gates of PPS.
Building Infrastructure
Office/other Building :- Construction of Building works J2 type Quarters 4 nos., dormitory for accommodation of 10 persons at PPS-I including all electrical, sanitary, drainage and plinth protection work as per scope of work along with 1 nos. security room at Main entry gate. The Security room shall be of min. size 4m x 4m x 2.75m height, execution shall be carry out as per scope of work. Waste collection, storage and treatment facility with Warehouse
Green area Development
Description of Work / Item(s)
Amount
Survey and Design Engineering:
Planning , layout plan, toptopographical survey, geotechnical investigation along with design engineering of 1000 MW Pugal Solar Park Phase-I plots, including buildings and other facilities etc as per scope of work. Land levelling and dressing Proper levelling and dressing, preparation of slope of land ,Area for PPS, Road way and other infrastructure development, transmission line route from one PPS to another PPS etc in about 1880.716 Hect. Available land, the work shall be carried out as per scope of work.
Construction of New roads/strengthening of existing roads including hume pipe culverts and causeways:-
Construction of 9 MTR (3.75-meter BT top + 1.0 m strip on either side) wide road with Trenches and Plantation Along Roads as per section- and details mentioned in scope of work.
Water Infrastructure System:-
Part-A- OUTLET, RWR & WTP Infrastructure for Water supply from IGNP to park reservoir at PPS-I, about 14.6 Kms. a) Provision for providing pipe outlet from RD 682 of Indira Gandhi Main cana. b) Cost of raw water sump well at RWPS near canal RD 682 c) Construction of two units of RWR, having capacity of 13.40 ML (Combined) with inlet and outlet arrangements complete. d) Construction of compact Water Treatment Plant of 0.70 MLD with 20 hours working including all relevant civil, mechanical, electrical, instrumentation etc complete in all respect.
PART -B: PIPE LINE WORKS a) P, L & Jointing of Pumping Mains of pvc -o pipe Class 500 PN-16 for Transmission of water from canal to RWR and further till OHSR including required specials & appurtenances etc complete. b) P, L & Jointing of Pumping Mains of HDPE pipe Class PE 80 PN-6 for Distribution of water from OHSR to plots including required specials Bulk Flowmeter & appurtenances etc complete c) P, L & Jointing of Pumping Mains of pvc -o pipe Class 500 PN-16 for recyling of water back to RWR including pumps and required specials & appurtenances etc complete d) P, L & Jointing of Pumping Mains of MS pipes including required specials & appurtenances etc complete for internal piping
PART-C: PUMPING STATIONS AND CLEAR WATER RESERVOIR/ OVERHEAD RESERVOIRS a) Construction of Pump Houses for RWPS-near RD 682, RWPS Soorasar & CWPS-Soorasar complete b) Provision for all required Mechanical, Electrical & Instrumentation works complete for all Pump Station (3 Nos.) c) Construction of Clear Water reservoir and OHSRs at locations of Solar Park Soorasar d) Construction of reservoir for storage of recycled water at different locations of Solar Park Soorasar
PART-D- Provision for construction of residential quarter, boundary wall, and store room, road etc.
PART-E- Cost of operation and maintenance of the system for 10 years after defect liability period of one year @ 7.5%
PART-F: Miscllenous Works: a) Construction of Canal outlet at RD 682 of Indira Gandhi canal complete in all respect as per specifications and drawing by IGNP (Lump Sum) b) Supply, Erection, Testing & Commissioning of Overhead 11/33 KV Power Transmission Line with ACSR Conductor on Lattice Tower from different 33 KV GSS to various pumping stations as per Standard. c) Provision for fees to be deposited in various departments for road cutting and restoration, land & crop compensation etc aas per requirement. d) Provision for preparation for detailed project report including survey work
Light arrangement in the park:-
Erection of street lamp post lights at respective roads along with provision of lights in trench area ,transmission , offices, treatment plant, fire fighting area and other facility area of Solar Park such as pump house, water treatment plant as per scope work and Supply and erection of High Mask lights in common facility area/ near main gates of PPS.
Building Infrastructure
Office/other Building :- Construction of Building works J2 type Quarters 4 Nos, dormitory for accommodation of 10 persons at PPS-I including all electrical, sanitary, drainage and plinth protection work as per scope of work along with 1 nos. security room at Main entry gate. The Security room shall be of min. size 4m x 4m x 2.75m height, execution shall be carry out as per scope of work. Waste collection, storage and treatment facility with Warehouse
Green area Development
Description of Work / Item(s)
Amount
Survey and Design Engineering:
Planning , layout plan, toptopographical survey, geotechnical investigation along with design engineering of 450 MW Pugal Solar Park Phase-III plots, including buildings and other facilities etc as per scope of work. Land levelling and dressing Proper levelling and dressing, preparation of slope of land ,Area for PPS, Road way and other infrastructure development, transmission line route from one PPS to another PPS etc in about 900 Hect. Available land, the work shall be carried out as per scope of work.
Construction of New roads/strengthening of existing roads including hume pipe culverts and causeways:-
Construction of 9 MTR (3.75-meter BT top + 1.0 m strip on either side) wide road with Trenches and Plantation Along Roads as per section- and details mentioned in scope of work.
Water Infrastructure System:-
Part-A- OUTLET, RWR & WTP Infrastructure for Water supply from IGNP to park reservoir at PPS-I, about 19.3 Kms. a) Provision for providing pipe outlet from RD 600 of Indira Gandhi Main cana. b) Cost of raw water sump well at RWPS near canal RD 600 c) Construction of two units of RWR, having capacity of 6.03 ML (combined) with inlet and outlet arrangements complete. d) Construction of compact Water Treatment Plant of 0.32 MLD with 20 hours working including all relevant civil, mechanical, electrical, instrumentation etc complete in all respect.
PART -B: PIPE LINE WORKS a) P, L & Jointing of Pumping Mains of pvc -o pipe Class 500 PN-16 for Transmission of water from canal to RWR and further till OHSR including required specials & appurtenances etc complete. b) P, L & Jointing of Pumping Mains of HDPE pipe Class PE 80 PN-6 for Distribution of water from OHSR to plots including required specials Bulk Flowmeter & appurtenances etc complete c) P, L & Jointing of Pumping Mains of pvc -o pipe Class 500 PN-16 for recyling of water back to RWR including pumps and required specials & appurtenances etc complete d) P, L & Jointing of Pumping Mains of MS pipes including required specials & appurtenances etc complete for internal piping
PART-C: PUMPING STATIONS AND CLEAR WATER RESERVOIR/ OVERHEAD RESERVOIRS a) Construction of Pump Houses for RWPS-near RD 600, RWPS Sardarpura & CWPS-Sardarpura complete b) Provision for all required Mechanical, Electrical & Instrumentation works complete for all Pump Station (3 Nos.) c) Construction of Clear Water reservoir and OHSRs at locations of Solar Park Sardarpura d) Construction of reservoir for storage of recycled water at different locations of Solar Park Soorasar
PART-D- Provision for construction of residential quarter, boundary wall, and store room, road etc.
PART-E- Cost of operation and maintenance of the system for 10 years after defect liability period of one year @ 7.5%
PART-F: Miscllenous Works: a) Construction of Canal outlet at RD 600 of Indira Gandhi canal complete in all respect as per specifications and drawing by IGNP (Lump Sum) b) Supply, Erection, Testing & Commissioning of Overhead 11/33 KV Power Transmission Line with ACSR Conductor on Lattice Tower from different 33 KV GSS to various pumping stations as per Standard. c) Provision for fees to be deposited in various departments for road cutting and restoration, land & crop compensation etc aas per requirement. d) Provision for preparation for detailed project report including survey work
Light arrangement in the park:-
Erection of street lamp post lights at respective roads along with provision of lights in trench area ,transmission , offices, treatment plant, fire fighting area and other facility area of Solar Park such as pump house, water treatment plant as per scope work and Supply and erection of High Mask lights in common facility area/ near main gates of PPS.
Building Infrastructure
Office/other Building :- Construction of Building works J2 type Quarters 4 Nos, dormitory for accommodation of 10 persons at PPS-I including all electrical, sanitary, drainage and plinth protection work as per scope of work along with 1 nos. security room at Main entry gate. The Security room shall be of min. size 4m x 4m x 2.75m height, execution shall be carry out as per scope of work. Waste collection, storage and treatment facility with Warehouse
Green area Development
NGGADHIYA (BID ID -2978749)
NGGADHIYA (BID ID -2978749)
NGGADHIYA (BID ID -2978749)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Pugal_Layout1.pdf
Other Document • 2.76 MB
Pugal2_Layout.pdf
Other Document • 0.78 MB
Pugal2_Road.pdf
Other Document • 0.65 MB
Pugal2_Water.pdf
Other Document • 0.92 MB
Pugal3_Drg.pdf
Other Document • 20.46 MB
Drawing_Hut.pdf
Other Document • 0.05 MB
Biddocumentcivilpugal.pdf
Tender Documents • 4.34 MB
Drawing_Quarter.pdf
Other Document • 0.50 MB
Pugal1_Drg.pdf
Other Document • 17.58 MB
BOQ_750783.xls
BOQ • 0.39 MB