CE
Ghaziabad Nagar Nigam
Construction work of black road in street no. 1 and street no. 2 in ward 60 Shyampark Main and reconstruction and beautification work of Tikona Park.
2026_DOLBU_1194229_99
133/Nirman/2026-27 Date 28.09.2026
Open Tender
Civil Works
Percentage
CE
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,575
₹3.3 L
8 Oct 2026
8 Oct 2026
26 Oct 2026
8 Oct 2026
26 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in- charge within a distance of 60 metre (200 feet). | 10.8 | cum | 1,340 | ₹14,472 |
| - | Earth work in exacavtion by mechanical mens(hydraulic excavator) manual means over area(exceeding 30cm in depth 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m as directed by engineer incharge | 565.85 | cum | 110 | ₹62,243.5 |
| - | Supply and laying spreading and compacting 22.4 mm to 53 mm size stone aggregate of specification in uniform thickness hand picking rolling with 3 wheeled road | 298.41 | cum | 2,151.2 | ₹6,41,939.59 |
| - | Consolidration of stone aggregate of 45-63mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 kn static roller | 298.41 | cum | 690 | ₹2,05,902.9 |
| - | Suplying of screening material with stacking for measurment etc all complete as per the direction of engineer in charge PWD SOR 2020 RMR | 7.37 | cum | 2,050.2 | ₹15,109.97 |
| - | Supplying laying tack coat of [email protected]/sqm including heating the VG10 bitumen spraying the bitumen with mechanically operated sparay unit fitted on bitumen boiler&cleaning and prepairing the existing road surface etc all completed as per the direction of engineer in charge AS PER RMR | 9,256.5 | SQM | 21.7 | ₹2,00,866.05 |
| - | Providing and laying dense graded bituminous macdam (D.G.B.M.) with HMP producing an average output of 75 tonnes per hour using crushed aggregates from approved quarry of specified grading premixed with bituminous binder [email protected] PER cent by weight of total mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade level alignment rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction adjustment for bitumen shall be done as per job mix formula and e-in-c latter no 2651DT 27.07.12 for proper completion of work as per direction of engineer in charge including all labour | 231.41 | cum | 14,199.6 | ₹32,85,929.44 |
| - | Providing and laying bituminous concrete (B.C.) with HMP crushed aggregates from approved quarry of specified grading premixd with bituminous binder(VG30)@5.40% by weight of total mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade level alignment rolling with smooth wheeled vibratory and tandem roller to achieve the desired compaction | 115.71 | cum | 16,297.5 | ₹18,85,783.72 |
| - | Supply & laying 80mm thick precase cement concrete I shape perporated interlocking tile pvaer block grey colour with tp layer of minimum 80mm thicknes having plan dimension 200x(160+120mm) of o.p menet smoothing gloss finish M-30 grade as per sor 2022 | 2,829.25 | SQM | 930 | ₹26,31,202.5 |
| - | Cement Concrete with 2.0 cm. gauge Approved stone grid coarse sand & cement in the proportion of 4:2:1 including , SOR 2022 279a | 15.99 | cum | 7,050 | ₹1,12,729.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.44 MB
BOQ_2254621.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .