Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Bank instrument submitted against EMD and Tender cost is self account cheque instead of DD/FDR/Bankers cheque or pay order which is not as per NIT. |
Tender Value
₹11.2 L
EMD Value
₹22,380
Closing Date
26 Apr 2025, 6:00 pmClosed
EXECUTIVE ENGINEER CIVIL
BSNL Civil Division, 4th Floor Telecom Bhavan, Zero Miles, Civil Lines, Nagpur-440001.
Construction of 1 No Tower Foundation for 40 M GBT Tower including BTS Platform and Erection at Botekasa under Phase IX 2 in Kurkheda SDCA in Gadchiroli SSA
2025_BSNL_233013_1
03/EEC/BSNL/NGP/2025-26
Open Tender
Civil Works
Percentage
90 days
Botekasa
Please refer Tender documents.
10 documents required · 10 mandatory
₹590
Accounts Officer (Cash), BSNL, PGMTD, Nagpur
₹22,380
3 May 2025
17 Apr 2025
30 Apr 2025
17 Apr 2025
26 Apr 2025
17 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m,disposed earth to be levelled and neatly dressed. | |||||
| 1.1 | All kinds of soil | 80 | One Cubic Metre | 145.65 | ₹11,652 |
| 2Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sum on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed. | |||||
| 2.1 | Ordinary rock | 84 | One Cubic Metre | 409.38 | ₹34,387.92 |
| 2.2 | Hard Rock (blasting prohibited) | 25 | One Cubic Metre | 1,175.82 | ₹29,395.5 |
| 3 | Filling available excavated earth (including rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 160 | One Cubic Metre | 160.83 | ₹25,732.8 |
| 4Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. | |||||
| 4.1 | Ordinary or hard rock. | 140 | One Cubic Metre | 186.6 | ₹26,124 |
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 5.1 | 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 4.7 | One Cubic Metre | 5,589.65 | ₹26,271.36 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
NIT03Botekasa.pdf
Tender Document • 1.24 MB
Tendernotice_1.pdf
Tender Document • 0.64 MB
BOQ_263464.xls
BOQ • 10.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .