| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY | |
| 2 | L2₹19.7 L+₹48,950 (2.55%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical NEAR BAZID BEG OFFICE 99 G FARIDAPUR CHAUDHARY IZZATNAGAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SHREE BALAJI MAHARAJ L2 | M/s ANSHIKA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.01PART-A, STRENGTHENING OF JURJAT LT LINE ( All rates must be entered including TAXES) | |||||
| 1.02safe Carriage of Following materials from Store Shahajahanpur/Bareilly to work site including both side loading and unloading | |||||
| 1.03 | PCC pole 8.5 mtr long | 47 | Nos | 1,100 ₹51,700 | 1,050 ₹49,350 Lowest |
| 1.04 | Cost of ABC Cable (3*50+1*35+1*16) SQ MM | 150 | MTR | 26 ₹3,900 | 25 ₹3,750 Lowest |
| 1.05 | Cost of ABC Cable (3*95+1*70+1*16) SQ MM | 7,140 | MTR | 26 ₹1,85,640 | 25 ₹1,78,500 Lowest |
| 1.06 | 6 SWG Neutral Cum Earth Wire | 50 | KG | 11 ₹550 | 10 ₹500 Lowest |
| 1.07 | 3 Phase Distribution Box | 63 | Nos | 155 ₹9,765 | 150 ₹9,450 Lowest |
| 1.08 | Stay set Complete | 18 | Nos | 55 ₹990 | 50 ₹900 Lowest |
| 1.09 | Earthing set complete | 47 | Nos | 55 ₹2,585 | 50 ₹2,350 Lowest |
| 1.10Installation/Laying work | |||||
Tender Value
₹19.1 L
EMD Value
₹19,200
Closing Date
20 Sept 2025, 10:00 amClosed
SE EDC SHAHJAHANPUR
KRISHNA NAGAR JAIL ROAD SHAHJAHANPUR
FOR STRENGTHENING OF JURJAR LT LINE, INSTALLING NEW DISTRIBUTION TRANSFORMER AND EARTHING PANNEL RELATED WORK IN EDD-POWAYAN IN BUSINESS PLAN 2025-26 HEAD UNDER EDC SHAHJAHANPUR (MVVNL)
2025_MVVNL_1070110_2
26(W)/EDCS/2025-26
Open Tender
Miscellaneous Works
Item Rate
45 days
SHAHJAHANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
SE EDCS
₹19,200
Yes
27 Sept 2025
12 Sept 2025
20 Sept 2025
12 Sept 2025
20 Sept 2025
12 Sept 2025
Amount
PART-A, STRENGTHENING OF JURJAT LT LINE ( All rates must be entered including TAXES)
safe Carriage of Following materials from Store Shahajahanpur/Bareilly to work site including both side loading and unloading
PCC pole 8.5 mtr long
Cost of ABC Cable (3*50+1*35+1*16) SQ MM
Cost of ABC Cable (3*95+1*70+1*16) SQ MM
6 SWG Neutral Cum Earth Wire
3 Phase Distribution Box
Stay set Complete
Earthing set complete
Installation/Laying work
Stone pad
PG Clamps
Distribution Box Clamp
Piercing Connector
Suspension Clamps
Dead End Clamp
Stay insulator
Concreating of Poles
J Hook
Eye Hook
concreting of stay
PCC pole 8.5 mtr long
Cost of ABC Cable (3*50+1*35+1*16) SQ MM
Cost of ABC Cable (3*95+1*70+1*16) SQ MM
6 SWG Neutral Cum Earth Wire
3 Phase Distribution Box
Stay set Complete
Earthing set complete
PART-B, INCREASING CAPACITY ( All rates must be entered including TAXES)
safe Carriage of Following materials from Store Shahajahanpur/Bareilly to work site including both side loading and unloading
New 25 KVA 11/0.43 KVA 3 Phase TF
ERECTION OF PCC SINGLE POLE 8.5 /9 METER LONG, AND FIXING OF NECESSARY SINGLE POLE ACCESSORIES AS PER RESSPO NORMS. (ALL DECENTRALISED MATERIAL WILL BE PROVIDED AND ARRANGED BY THE CONTRACTOR)
11 kv MS T-off Channel
Top Channel (125*65*2240 mm)
S/S Base Angle (75*75*6*2028 mm) bolt & Nut
Composite polymeric 11 KV Disc insulator 45 KN
Composite polymeric 11 KV Pin insulator 45 KN
Composite polymeric 11 KV Pin insulator for Fuse Set
ACSR Weasel conductor
LT Lead Lt XLPE Cable 3.5*70 SQ MM
Stay Complete
Earthing Complete
Cost of ABC Cable (3*50+1*35+1*16) SQ MM
3 Phase Distribution Box
Installation/Laying work
Holding Clamp
LT-T OFF
Stone pad
Danger Board with Clamps
Distribution Box Clamp
Piercing connector
Concreting of poles
all types of lugs
stay insulator
fabrication of 11 KV fuse set installed on mid way of 11 KV double pole structure with materials as per Respo norms
New 25 KVA 11/0.43 KVA 3 Phase TF with all proper connection
PCC pole 8.5 mtr long
11 kv MS T-off Channel
Top Channel (125*65*2240 mm)
S/S Base Angle (75*75*6*2028 mm) bolt & Nut
Composite polymeric 11 KV Disc insulator 45 KN
Composite polymeric 11 KV Pin insulator 45 KN
Composite polymeric 11 KV Pin insulator for Fuse Set
ACSR Weasel conductor
LT Lead Lt XLPE Cable 3.5*70 SQ MM
Stay Complete
Earthing Complete
Cost of ABC Cable (3*50+1*35+1*16) SQ MM
3 Phase Distribution Box
Barbed wire
Unmounting of old 16 KVA Transformer
Back carriage of old 16 KVA Transformer to store
PART-C, Earthing work ( All rates must be entered including TAXES)
Providing all items and intallation of Pipe earthing upto water level with all accessories including GI Strip nut bolt for 250 KVA TF As per norms Including 05 Years of Warranty for same work
SHREE BALAJI MAHARAJ (BID ID -5535301)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .