Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹28.3 LAccepted-AOC GRAM POST KARKATI VIA BURHAR KARKATI SHAHDOL MADHYA PRADESH 484110 | SHAHDOL | MADHYA PRADESH | 484110 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical AMLAI COLLIERY DHANPURI DISTT ANUPPUR M P | DHANPURI | ANUPPUR | MADHYA PRADESH | 484116 | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹27.0 L
EMD Value
₹33,900
Closing Date
27 Jan 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 21 Nos.RCC sectionalization Stoppings for sectionalization of Panel B7,B6 and B5 in seam VIB at Khairaha UG Mine of Sohagpur Area
2023_SECL_267350_1
SECL/SGP/ET/2223/600dt12/01/22
Open Tender
Civil Works - Others
Item Rate
240 days
khairaha UG Mine
As per NIT
8 documents required · 8 mandatory
₹33,900
19 Mar 2023
12 Jan 2023
30 Jan 2023
12 Jan 2023
27 Jan 2023
13 Jan 2023
12 Jan 2023 - 19 Jan 2023
Amount
Item Description/ Heading Part (A) labour Cost
cleaning/removal of debris/stone from galleries and stacking within 50 mtr.
Groove cutting for stopping and manhole by chisel/pickaxe and hammer (a )in soft stone
(b) In soft stone
(c) In Coal
Reinforced cement concrete(1:2:4) in wall/roof ceiling of air crossing/stopping (any thickness)in u/g (Excluding,shuttering, reinforcement cutting, bending, placing in position and binding etc)
Centring, shuttering, finishing and reinforcement including cutting,bending, placing in position and binding and strutting, propping etc complete. (5.85 x 3.65x 2 x21 ) = 889.14 m2
Cement concrete/PCC (1:2:4) in foundation/plinth/flooring/wall(any thickness)in ug(excluding centring, shuttering and cost of material) in floor 21 (5.80 x 1.00x 0.05 ) = 6.09 m3 water tank 18 (2.10x 0.70x0.10 ) = 2.65 m3
6mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material)
12 mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material)
white washing in u/g with white lime.
Loading of all kinds of building materials into Tub at Incline mouth
Un-loading of all kinds of building materials at destination in UG.
Transportaion of material with tramming & pushing coupling & uncoupling with haulages for a distance 01 lead or part there of and bringing the empty tub to the surface
Lead for transportation/ carriage of all kinds of building materials by manually (16 m to 30 m)
Part-B Material Cost supply and stacking of building materials Cement
Stone metal(20mm)
steel (18mm)
Total impact of GST for the purpose of CTC
MAHENDRA SINGH
stage.html
html • 0.04 MB
techsummary_276603.pdf
PDF • 0.14 MB
finsummary_276603.pdf
PDF • 0.11 MB
AOC600.pdf
PDF • 1.62 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .