Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹28.3 L
EMD Value
₹29,000
Closing Date
29 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
O/o Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Livelihood works at Kannagudi Block in Sivagangai District - Package No. 5
2022_RDTN_242892_1
05_Pack_AGAMT II 21-22/KNG
Open Tender
Civil Works
Item Rate
90 days
Sivagangai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹29,000
Yes
13 Aug 2022
20 Jul 2022
29 Jul 2022
20 Jul 2022
29 Jul 2022
20 Jul 2022
Amount
Construction of Threshing Floor at Kannangudi Village Kannangudi Panchayat
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and Erection centering for all PCC items including cost and conveyance of all materials and labour charges etc, complete
Cement Concrete 1 : 3 : 6 , mix using 40mm ISS HBG stone jelly for Walls including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 22 x 11 x 7 cm including cost and conveyance of all materials and labour charges etc complete .
Plastering with Cement Mortor 1:5,12mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specification as directed by the departmental officers
Construction of Threshing Floor at Siruvatchi Village Siruvatchi Panchayat
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and Erection centering for all PCC items including cost and conveyance of all materials and labour charges etc, complete
Cement Concrete 1 : 3 : 6 , mix using 40mm ISS HBG stone jelly for Walls including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 22 x 11 x 7 cm including cost and conveyance of all materials and labour charges etc complete .
Plastering with Cement Mortor 1:5,12mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specification as directed by the departmental officers
Construction of Threshing Floor at Therpogi Village Kalathur Panchayat
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and Erection centering for all PCC items including cost and conveyance of all materials and labour charges etc, complete
Cement Concrete 1 : 3 : 6 , mix using 40mm ISS HBG stone jelly for Walls including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 22 x 11 x 7 cm including cost and conveyance of all materials and labour charges etc complete .
Plastering with Cement Mortor 1:5,12mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specification as directed by the departmental officers
Construction of Threshing Floor at Pusalagudi Village Pusalagudi Panchayat
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and Erection centering for all PCC items including cost and conveyance of all materials and labour charges etc, complete
Cement Concrete 1 : 3 : 6 , mix using 40mm ISS HBG stone jelly for Walls including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 22 x 11 x 7 cm including cost and conveyance of all materials and labour charges etc complete .
Plastering with Cement Mortor 1:5,12mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specification as directed by the departmental officers
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
UDAYAKUMAR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .