Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC 1 532 1 AMMAN TOWER ENGINEER NAGAR 3RD FLOOR 8TH STREET MADURAI NORTH THIRUPPALAI MADURAI 625014 | MADURAI | TAMIL NADU | 625014 | ₹3.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 Cr+₹5.0 L (1.28%)Rejected-AOC | ₹3.9 Cr+₹5.0 L (1.28%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SRI AMMAN CONSTRUCTION L1 | MARUTHU CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 | 4,883 | m3 | 154 ₹7,51,982 Lowest | 155 ₹7,56,865 |
| 2.01 | Supplying and filling in foundation and basement with M.sand in layers of 15cm thick well rammed and consolidated including watering complying etc, complete. | 575 | m3 | 1,626 ₹9,34,950 Lowest | 1,630 ₹9,37,250 |
| 3.01 | Cement Concrete 1:4:8(One Cement Four sand and Eight aggregates) using 40mm gauge hard broken granite jelly for foundation including watering and consolidation for foundation etc complete. | 575 | m3 | 5,675 ₹32,63,125 Lowest | 5,675 ₹32,63,125 Lowest |
| 4.01 | Supplying and erecting shuttering with necessary supports for plain surface such as plinth beam and lintel sides with all cross bracings ets., completc | 10,770 | m2 | 564 ₹60,74,280 Lowest | 565 ₹60,85,050 |
| 5.01 | Cement Concrete 1:2;4(One Cement Two sand and Four aggregates) using 20mm gauge hard broken granite jelly for foundation including watering and consolidation for foundation etc complete. | 1,239 | m3 | 7,048 ₹87,32,472 Lowest | 7,050 ₹87,34,950 |
| 6.01 | Plastering with CM 1:3 (one cement three sand) 20mm thick 10m2. | 3,231 | m2 | 618 ₹19,96,758 Lowest | 620 ₹20,03,220 |
| 7.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). | 33,895 | kg | 93 ₹31,52,235 Lowest | 98 ₹33,21,710 |
| 8.01 | Reinforced Cement oncrete 1:1.1/2:3.(one cement one nad half sand and three aggregate) using 20mm machine broken gauge granite chipsfor reinforced cement concrete | 83 | m3 | 9,458 ₹7,85,014 Lowest | 9,500 ₹7,88,500 |
| 9.01 | Manufacturing and fixing in position RCC precast slab in C.C. 1:1.5:3, using 20 mm HBGS machine crushed jelly of following thickness, excluding cost of reinforcement grill but including moulding, finishing, curing and fixing in position etc. Complete. Labour 100 mm thick | 4,883 | m2 | 1,455 ₹71,04,765 Lowest | 1,500 ₹73,24,500 |
| 10.01 | Add GST 18% | 1 | GST | 59,03,204.58 ₹59,03,204.58 Lowest | 59,78,730 ₹59,78,730 |
Tender Value
₹3.9 Cr
EMD Value
₹3.9 L
Closing Date
27 Jun 2025, 3:00 pmClosed
COMMISSIONER MADURAI CORPORATION
ARINGAR ANNA MALIGAI
Construction of Strom water drain work at Ward 07,08 and 09
2025_MAWS_569203_1
E7 / EST 007321 / 2025-26 (CGF)
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.9 L
25 Aug 2025
14 Jun 2025
27 Jun 2025
14 Jun 2025
27 Jun 2025
14 Jun 2025
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3
Supplying and filling in foundation and basement with M.sand in layers of 15cm thick well rammed and consolidated including watering complying etc, complete.
Cement Concrete 1:4:8(One Cement Four sand and Eight aggregates) using 40mm gauge hard broken granite jelly for foundation including watering and consolidation for foundation etc complete.
Supplying and erecting shuttering with necessary supports for plain surface such as plinth beam and lintel sides with all cross bracings ets., completc
Cement Concrete 1:2;4(One Cement Two sand and Four aggregates) using 20mm gauge hard broken granite jelly for foundation including watering and consolidation for foundation etc complete.
Plastering with CM 1:3 (one cement three sand) 20mm thick 10m2.
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also).
Reinforced Cement oncrete 1:1.1/2:3.(one cement one nad half sand and three aggregate) using 20mm machine broken gauge granite chipsfor reinforced cement concrete
Manufacturing and fixing in position RCC precast slab in C.C. 1:1.5:3, using 20 mm HBGS machine crushed jelly of following thickness, excluding cost of reinforcement grill but including moulding, finishing, curing and fixing in position etc. Complete. Labour 100 mm thick
Add GST 18%
MARUTHU CONSTRUCTIONS (BID ID -1383233)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .