| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹19.5 LAccepted-AOC TAMIL NADU | VELLORE | TAMIL NADU | 632001 | ₹19.5 L Quoted ₹19.6 L | 2 | Accepted-AOC lowest amount quotted |
| 2 | 1₹19.5 LRejected-AOC | ₹19.5 L | 1 | Rejected-AOC highest amount quotted |
| Sl No | Description | Qty | Unit | S Nithyanandham L2 | M/S VSP CONSTRUCTIONN L1 |
|---|---|---|---|---|---|
| 1.00Construction of 30000 Lit's Capacity OHT with 12.00m Staging For Gundaleri H/O Gundaleri Panchayat | |||||
| 1.01Earthwork excavation and deposition on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Board officers.Hard stiff clay, block cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B | |||||
| 1.02 | For Foundation | 55.13 | cum | 280 ₹15,438 | 262 ₹14,445 |
| 1.03Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers | |||||
| 1.04 | Columns | 2.3 | cum | 1,800 ₹4,140 | 1,675 ₹3,853 |
| 1.05Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers. | |||||
| 1.06 | Columns | 3.46 | cum | 5,300 ₹18,338 | 5,250 ₹18,165 |
| 1.07RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing | |||||
| 1.08 | Below 1.50m from GL | 7.58 | cum | 9,119.47 ₹69,162 | 9,100 ₹69,014 |
| 1.09 | Upto GL | 1.75 | cum | 8,999.62 ₹15,740 | 8,950 ₹15,654 |
Tender Value
Refer Docs
EMD Value
₹19,710
Closing Date
19 Feb 2026, 3:00 pmClosed
Block developement officer
Block developement office
Construction of 30000 Lits Capacity OHT with 12.00m Staging For Gundaleri H/O Gundaleri Panchayat
2026_RDTN_655178_1
A2/300/2025
Open Tender
Civil Works
180 days
Block developement office
Construction of 30000 Lits Capacity OHT with 12.00m Staging For Gundaleri H/O Gundaleri Panchayat
2 documents required · 2 mandatory
₹0
₹19,710
Block developement office
10 Mar 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
11 Feb 2026
Construction of 30000 Lit's Capacity OHT with 12.00m Staging For Gundaleri H/O Gundaleri Panchayat
Earthwork excavation and deposition on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Board officers.Hard stiff clay, block cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B
For Foundation
Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers
Columns
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers.
Columns
RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing
Below 1.50m from GL
Upto GL
Above Gl and Upto 4.50m Height
Above 4.50m and upto 7.32m Ht from GL
Above 7.32m and upto 10.98m Ht from GL
Above 10.98m and upto 14.64m ht form GL
Above 14.64m and upto 18.30m ht form GL
Provinding steel centering using MS plates of size 90cmx60cm 13 grade to 10 grade thick welded with 25mmx25mmx3mm MS angles supported with country wood stantling of size 10cmx6.5cm at 90 cm C/C strutting with casurina props of 100m to 13cm dia as directed by Board Officers.
SQARE Surface
Columns below GL and above GL upto 3.30m ht
Columns above 3.30m upto 4.30m ht from GL
Columns above 4.30m upto 5.30m ht from GL
Columns above 5.30m upto 6.30m ht from GL
Columns above 6.30m upto 7.30m ht from GL
Columns above 7.30m upto 8.30m ht from GL
Columns above 8.30m upto 9.30m ht from GL
Columns above 9.30m upto 10.30m ht from GL
Columns above 10.30m upto 11.30m ht from GL
Columns above 11.30m upto 11.40m ht from GL
Plane Surface
Below G.L
From 0.00- 3.30m
From 5.30m to 6.30m htabove GL
From 8.30m to 9.30m ht above GL
From 11.30m to 12.30m ht above GL
Curved Surface
Upto 3.30m height (From Floor Slab)
From 3.30m to 4.30m Height (From Floor Slab)
Supplying, fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc., complete and as directed by Board officers.
Painting two coats using approved quality Cement Paint over one cost of priming coat exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Board officers.
Supplying and Fixing in Position of Cut Stone set in Cm 1:3 using well dressed cut stone supporting inlet pipe inside the tank and as directed by the officers
Fabrication,supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6m MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre welded, jointed etc., providing with suitable side supports, clamps, and locking arrangements provided with one coat of red oxide paint for providing access to roof top of 10,000 lit. capacity OHT of suitable inclined length, including bottom anchorage and 6transportation and as directed by Board officers.
Supply and delivery and fixing position of CI man hole cover and frame of Size 60x60cm on roof slab and as directed by the officers The manhole frame and cover should be of light duty and conforming to ISI 1726/1974
Supply and Delivery and Fixing in Position of 150mm dia AC Ventilators on the roof Slab and as directed by the officers
Refilling the Foundation for Service reservoir with excavated earth (other than sand) in layers of 15cm thick well rammed,watering and consoildating etc Complete complying with standard Specification as directed by the officers
Providing and fixing of RCC inner access ladder in RCC 1:1:5:3 (one cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 45cm consisting of two Nos. of vertical post of 10cm x 15cm and step slab of 25mm x25mm etc., complete and as directed by Board officers.
Providing PVC ventilating arrangements mosquito proof nylon net with 110mm PVC cowl and as directed by Departmental Officers
Plat form & Soak Pit
Earth work excavation for all soils including all labour charges etc complete
Cement concrete 1:4:8 mix using 40 mm metal including all Lbour charges etc complete
Supply and erecting Centering including all labour chages etc complete
Cement concrete 1:3:6 mix using 20 mm metal including all Lbour charges etc complete
Cement concrete 1:2:4 mix using 20 mm metal including all Lbour charges etc complete
Filling 40mm Metal Including Cost and conveyance of all labour charges etc., complete.
Filling 20mm Metal Including Cost and conveyance of all labour charges etc., complete.
Supply of 90mm PVC pipes and Specials for Tank Inlet
90mm PVC 6Ksc Pipes
Earth work excavation and depositing on bank with initial lead and lift in all soil for etc Complete
Laying and jointing of PVC pipe into trench for etc Complete
Refilling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Supply of 63 mm PVC pipes and Specials for Tank Outlet
63 mm PVC 6Ksc Pipes
Earth work excavation and depositing on bank with initial lead and lift in all soil for etc Complete
Laying and jointing of PVC pipe into trench for etc Complete
Refilling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated etc., complete.
Providing Name board
Providing Photographic Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.49 MB
gundaleritank.pdf
Tender Documents • 0.44 MB
BOQ_785546.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid