| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-AOC | ₹26.0 L Quoted ₹30.2 L | L1 | Accepted-AOC L1 Bidder AOC issued |
| 2 | L2₹31.7 LRejected-AOC NO 68 D BLOCK 2ND FLOOR S 1 FRONTIER HOMES ALIPH MAJITH NAGAR KELAMBAKKAM CHENGALPATTU DIST CHENNAI 603 103 | CHENGALPATTU | TAMIL NADU | 603103 | ₹31.7 L | L2 | Rejected-AOC L2 Bidder Rejected |
| Sl No | Description | Qty | Unit | Renga Engineering Works India Pvt Ltd L2 | Mani Engineering Works L1 |
|---|---|---|---|---|---|
| 1.00 | I. Material Portion: ISMC 150 X 75 | 1.71 | MT | 70,655 ₹1,42,567.66 | 67,300 ₹1,35,797.94 |
| 2.00 | MS Plate 5 mm TK | 5.21 | MT | 92,379 ₹5,67,927.62 | 87,980 ₹5,40,883.44 |
| 3.00 | ISA 50 x 50 x 6 | 1.2 | MT | 69,227 ₹98,025.43 | 65,930 ₹93,356.88 |
| 4.00 | II. Labour Portion: Dismantling of existing severely corroded / damaged /corroded Technological Structures for conveyor-6B and RBFD -2A & 2B, which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges consumables etc.., | 4.06 | MT | 12,262 ₹58,744.79 | 11,678 ₹55,946.96 |
| 5.00 | Utilizing iron & steel structural materials lifting, loading, transporting, and unloading in the work spot including all hire charges. | 8.12 | MT | 6,460 ₹61,897.14 | 6,152 ₹58,946 |
| 6.00 | Fabrication of Technological Structure for conveyor-6B and RBFD-2A & 2B, by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges. | 8.12 | MT | 89,813 ₹8,60,552.24 | 85,536 ₹8,19,571.74 |
| 7.00 | Erection of Technological Structure for Conveyor 6B and RBFD-2A & 2B, by leading, lifting, fixing, providing necessary scaffolding arrangement, Including crane, winch hire charges, consumables and T&P hire charges. | 8.12 | MT | 99,669 ₹9,54,988.49 | 94,923 ₹9,09,514.22 |
| 8.00 | Cleaning the surface with shot basting the structures of Chennal and plates including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges. | 380 | M² | 338 ₹1,51,559.2 | 322 ₹1,44,384.8 |
| 9.00 | Cost of paint for one coat of zinc phosphate epoxy primer (60-70 microns DFT) in the structures of angle and plates including cost of epoxy paints. | 380 | M² | 48 ₹21,523.2 | 46 ₹20,626.4 |
| 10.00 | Cost of paint for one coat of MIO epoxy (100-120 microns DFT) in the structures of angle and plates. | 380 | M² | 44 ₹19,729.6 | 42 ₹18,832.8 |
Tender Value
Refer Docs
EMD Value
₹24,850
Closing Date
17 Jun 2025, 2:00 pmClosed
CE/NCTPS-I
CE/NCTPS-I
NCTPS I SEMII Circle ICHS Dn Replacement of existing severely damaged corroded Technological Structure for conveyor 6B and RBFD 2A and 2B of ICHS
2025_EB_564520_1
CE/NCTPSI/SE/MII/SpNo33/25-26
Open Tender
Power/Energy Projects/Products
45 days
NCTPS-I Chennai
Refer to tender document
3 documents required · 3 mandatory
₹0
₹24,850
Yes
17 Mar 2026
3 Jun 2025
18 Jun 2025
3 Jun 2025
17 Jun 2025
3 Jun 2025
Amount
I. Material Portion: ISMC 150 X 75
MS Plate 5 mm TK
ISA 50 x 50 x 6
II. Labour Portion: Dismantling of existing severely corroded / damaged /corroded Technological Structures for conveyor-6B and RBFD -2A & 2B, which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges consumables etc..,
Utilizing iron & steel structural materials lifting, loading, transporting, and unloading in the work spot including all hire charges.
Fabrication of Technological Structure for conveyor-6B and RBFD-2A & 2B, by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges.
Erection of Technological Structure for Conveyor 6B and RBFD-2A & 2B, by leading, lifting, fixing, providing necessary scaffolding arrangement, Including crane, winch hire charges, consumables and T&P hire charges.
Cleaning the surface with shot basting the structures of Chennal and plates including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges.
Cost of paint for one coat of zinc phosphate epoxy primer (60-70 microns DFT) in the structures of angle and plates including cost of epoxy paints.
Cost of paint for one coat of MIO epoxy (100-120 microns DFT) in the structures of angle and plates.
Cost of paint for one coat of Aromatic poly urethane (30 -35 microns DFT) with total DFT of 190 to 225 microns in the structures of angle and plates.
Painting charges for three coats of paint with a total dry film thickness (DFT) of 190 to 225 Microns ie. Painting with one coat of zinc phosphate epoxy primer (60-70) microns), one coat of MIO epoxy undercoating (100-120) microns DFT) & one coat of Aromatic poly urethane (30-35 microns DFT) including cost of thinner.
Renga Engineering Works India Pvt Ltd (BID ID -1366901)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid