Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-Finance | ₹29.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹29.8 L+₹25,676 (0.87%)Rejected-Finance | ₹29.8 L+₹25,676 (0.87%) | L2 | Rejected-Finance L2 |
| 3 | L3₹29.9 L+₹38,036 (1.29%)Rejected-Finance | ₹29.9 L+₹38,036 (1.29%) | L3 | Rejected-Finance L3 |
Tender Value
₹29.5 L
EMD Value
₹24,800
Closing Date
3 Apr 2024, 3:00 pmClosed
Divisional Engineer (H)
Divisional Engineer (H) Dindigul
Preparation of Detailed Project report DPR for Alternate route for free flow of traffic in Kodaikanal
2024_HWAY_446962_2
DGL 49 TN 2023 24 SDO Dated 05 03 2024
Open Tender
Survey
Item Rate
120 days
Dindigul
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹24,800
8 May 2024
26 Mar 2024
2 May 2024
26 Mar 2024
3 Apr 2024
27 Mar 2024
Amount
Preparation of Detailed Project report (DPR) for Alternate route for free flow of traffic in Kodaikanal
Reconnaissance Survey & Inception report
Topographical Survey including fixing GPS pin
Conducting survey for L.S.&C.S
Fixing Horizontal Alingement and Vertical Alingement as per IRC standard
Conducting 7 days traffic volume study at 2 locations
Conducting Origin- Destination study at 2 locations
Clearing the light jungle to a width of 10m (Length km x 15 x 0.20)
Detailed report on alingment (including three alternations) fixing Horizontal Alingment and vertical Alingment as per IRC standards
Materials survey for road and bridge works and preparation of rate analysis, SBC calculations, Drawings etc., complete including Design for pavement composition based on kilomer- wise field data
Preparation of land plan schedule and its report
Provision for preparation of structrual Design, Drawings and Estimate as pre MORT&H specifications for structural Works(bridges, culvert, retaining wall and side drain).
Preparation detailed estimate and Abstract estimate including power point presentation
Report on Environment & Social impacts Assessment, Report writing and submission of report like inspections report Traffic report etc., complete (Staionery purpose)
Calculation of SubTotal, GST and Total Amount carried out by system automatically
Basic cost of value put to tender as per estimate
Add GST at 18%
R AND B CONSULTANCY
DREAMSHELL CONSTRUCTIONS LLP
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .