| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.3 LAccepted-AOC GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹34.7 L+₹1.2 L (3.66%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹35.9 L+₹2.4 L (7.22%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹27.4 L
EMD Value
₹54,000
Closing Date
3 Jul 2023, 6:00 pmClosed
SE. O AND MC-I, DTPS, ANPARA.
OFFICE OF THE SE. O AND MC-I, DTPS, ANPARA.
Work of Complete Operation, Maintenance and upkeep of Hydrogen Generation Plant and its accessories. Routine and Breakdown maintenance of air compressors and its accessories (ATLAS COPCO and IR Make), AMC of ATLAS Copco Make compressor and breakdown
2023_RVUNL_798057_2
T-12/DTPS/OMC-I/CAD/23-24
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
Anpara DTPS
AS per NIT
3 documents required · 3 mandatory
₹1,180
Dy CAO, CFA and BO, DTPS
₹54,000
6 Jan 2024
23 Jun 2023
4 Jul 2023
23 Jun 2023
3 Jul 2023
23 Jun 2023
23 Jun 2023 - 3 Jul 2023
Complete Operation, Maintenance and upkeep of Hydrogen Generation Plant installed at 2X500 MW, DTPS, Anpara, Sonebhadra.
Routine maintenance of 05 No’s Air compressors, and associated auxiliaries installed in compressor House. (As per scope of work job no.1.)
Manpower Support for Annual maintenance contract of Atlas Copco make Air Compressor With T&P and consumables. (03 Unskilled Manpower per day)
Routine maintenance of Ingersoll Rand make Mill Reject System Compressor and its accessories
Annual maintenance contract (AMC) of Atlas Copco makes Air Compressor (05 Nos) model ZR-275 and Air Dryer (03 Nos) installed at (2X500MW) DTPS, Anpara.
Replacement /Repair of piston rod or blocking nut of HP/LP cylinder, dismantling, setting right and re assemble.
Checking and attending the intercooler/ after cooler thorough cleaning, remounting and replacement of part etc.
Gudgeon pin and small end bush assembly. Opining for checking, rectification and replacement if required.
Changing of seal ring / piston ring of HP/LP cylinder
Changing of bearing ring of HP/LP cylinder or Changing of piston half/complete piston of HP/LP cylinder
Replacement of distance pieces / cross head/cross head guide
Opining, cleaning, repair/replacement of parts of suction / delivery valves of HP/LP cylinder
Attending and checking of oil cooler including replacement of damaged / worn out parts if required.
Oil filter cleaning and attending of primary /secondary lube oil filter
Checking, attending and cleaning with non corrosive scale remover of water jacket of HP/LP cylinder
Attending and resetting of main bearing including repair /replacement of parts, bearing etc. Also attending blockage in lube oil pump.
Opening, attending defect in plumber block, greasing etc
Complete Overhauling and trial run of compressor as per scope of work
Cleaning of filter of split AC and cassette AC
Cleaning of filter AHU in PT Plant One AHU filter cleaning is one Job
Replacement of 5.0/4.0 Ton burnt compressor with new one, new compressor provided by department and old compressor is the property of department.
Replacement of 2.0/1.5 Ton burnt compressor with new one, new compressor provided by department and old compressor is the property of department.
Replacement of 2.0 Ton burnt compressor with gas charging (New compressor will be provided by contractor.).
Replacement of 1.5 Ton burnt compressor with gas charging (New compressor will be provided by contractor.).
Gas Charging (As per requirement) in 5.0 Ton Compressor.
Gas Charging (As per requirement) in 4.0 Ton Compressor.
Gas Charging (As per requirement) in 2.0 Ton Compressor.
Gas Charging (As per requirement) in 1.5 Ton Compressor.
Cleaning of Strainer filter of 5.0 Ton Cassette type air conditioner.
Cleaning of Strainer filter of 4.0 Ton Tower AC.
Repairing/Cleaning of Strainer filter of 2.0 Ton Split type air conditioner.
Cleaning of Strainer filter of 1.5 Ton Split type air conditioner.
Replacement of Starting capacitor/ running capacitor of 2-5 Ton air conditioner.
Replacement of Starting capacitor/ running capacitor of 1.5 Ton split type air conditioner
Replacement of Thermostat of 5.0 Ton Cassette type air conditioners.
Replacement of Thermostat of 2.0 Ton split type air conditioners.
Replacement of Thermostat of 1.5Ton split type air conditioners.
Replacement of Blade of fan blower of 2.0-5.0 Ton air conditioner.
Replacement of Blade of fan blower of 1.5 Ton spilt air conditioner.
Replacement of Fan Motor capacitor of 1.5-5.0 Ton air conditioner.
Rewinding of blower of AHU motor.
Rewinding of fan motor of 5.0 Ton Cassette air conditioner.
Rewinding of fan motor of 4.0 Ton Tower air conditioner.
Rewinding of fan motor of 2.0 Ton spilt air conditioner.
Rewinding of fan motor of 2.0 Ton window air conditioner.
Rewinding of fan motor of 1.5 Ton window air conditioner.
Rewinding of fan motor of 1.5 Ton spilt air conditioner.
Replacement of indoor assembly PCB card of 1.5/2.0 ton A.C.
Repairing of condenser coil of 1.5/ 2.0-ton A.C.
Replacement of condenser coil of 1.5-ton A.C.
Replacement of condenser coil of 2.0-ton A.C.
Replacement Of Starting relay of 1.5/ 2.0-ton A.C.
Top up of Refrigerant of unit as per requirement.
Repairing of 30 Ton Chiller unit.
Repairing of 5 Ton Chiller unit.
Repair of air blowers of air handling units. The work includes dynamics balancing of blower fan, replacement of bearing repair of shaft and other associated work.
Complete overhauling work of 5.0 Ton cassette air conditioner.
Complete overhauling of 2.0 Ton spilt air conditioner.
Complete overhauling of 2.0 Ton window air conditioner.
Complete overhauling of 1.5 Ton spilt air conditioner.
Complete overhauling of 30 .0 Ton Chiller Unit.
Complete overhauling of 5 .0 Ton Chiller Unit.
Complete overhauling of AHUs.
Complete overhauling of 4.0 Ton Tower AC.
Attending Gas leakage of 5.0 Ton air conditioner.
Attending Gas leakage of 2.0 Ton spilt air conditioner.
Attending Gas leakage of 1.5 Ton spilt air conditioner.
Attending Gas leakage of 30 .0 Ton Chiller Unit.
Attending Gas leakage of 5 .0 Ton Chiller Unit
THE UNIVERSAL CONSTRUCTION
TECHCON ENGINEERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .