| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹88.1 LAccepted-AOC | ₹88.1 L | L-1 | Accepted-AOC Accepted as L-1 |
| 2 | L-2₹88.3 L+₹16,548.51 (0.19%)Rejected-Finance CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | ₹88.3 L+₹16,548.51 (0.19%) | L-2 | Rejected-Finance Rejected as L-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Techincally Rejectd due to non submission of Annexure XV |
| Sl No | Description | Qty | Unit | SURENDRA KUMAR SINGH | RAVI KUMAR JAISWAL |
|---|---|---|---|---|---|
| 1.00PARTICULAR | |||||
| 1.01 | Dismantling of belt structure along with PVC belt (800/1000mm) including cleaning & stacking the same within a distance of 50m. | 4,870 | mtr | 3,26,290 ₹3,85,022.2 Lowest | 3,31,160 ₹3,90,768.8 |
| 1.02 | Transportation of PVC belt (1000mm) from surface to u/g or one section to another sectionin u/g through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part there of including loading, unloading & stacking the same at destination (4870 X 2=9,740.00 Mtr.) | 9,740 | mtr | 8,18,160 ₹9,65,428.8 Lowest | 8,18,160 ₹9,65,428.8 Lowest |
| 1.03 | Transportation of steel structures materials from surface to underground or one section to another section through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. | 412.48 | tonne | 1,27,868.8 ₹1,50,885.18 Lowest | 1,28,281.28 ₹1,51,371.91 |
| 1.04 | Installation/erection of complete belt conveyor structure (1000mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete. Total Length = 4870.00 mtrs. | 4,870 | mtr | 24,83,700 ₹29,30,766 Lowest | 24,88,570 ₹29,36,512.6 |
| 1.05 | Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor. (4870.00X2=9,740.00 Mtr.) | 9,740 | mtr | 9,93,480 ₹11,72,306.4 Lowest | 9,93,480 ₹11,72,306.4 Lowest |
| 1.06 | Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/ transporting from other section through haulages/pushing manually. | 8 | Set | 1,35,600 ₹1,60,008 Lowest | 1,35,768 ₹1,60,206.24 |
| 1.07 | Shifting of tail end drum of belt conveyor (800/1000 mm with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling, carrying , from one place to other place in same section/district within a lead of 50m. | 75 | Set | 6,36,375 ₹7,50,922.5 Lowest | 6,36,375 ₹7,50,922.5 Lowest |
| 1.08 | General cleaning/house keeping not exceeding 5cm in depth including disposal of cleaned muck/debris to be stacked up to 50 m. or to be levelled and neatly dressed at site of drive head installations. 15.00x6.00x 8 nos. = 720.00 Sq.m. | 720 | square meter | 10,728 ₹12,659.04 Lowest | 10,728 ₹12,659.04 Lowest |
| 1.09 | Cutting in soft stone by chisel & hammer for digging of pits of foundation work-
a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 8 Set = 32.00m3
b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 8 Set = 05.12 m3
c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 8 Set = 5.12 m3 Total = 42.24 m3 | 42.24 | cubic mtr | 2,55,552 ₹3,01,551.36 Lowest | 2,56,016.64 ₹3,02,099.64 |
Tender Value
₹80.4 L
EMD Value
₹1.0 L
Closing Date
26 May 2026, 5:00 pmClosed
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Dismantling, Transportation, Installation and Commissioning of Panel belts (1000 mm) with drive head accessories Panel T19, 7R, T20, T21, T22, T3, 8R, T2 in SeamVII for LHCM1 drivage in FY 2026-27 at Khairaha UG Mine.
2026_SECL_359303_1
SECL/SGP/SO(M)/2025-26/NIT-729 dated 08-05-2026
Open Tender
Civil Works - Others
Item Rate
365 days
KHAIRAHA UG
as per NIT
8 documents required · 8 mandatory
₹1.0 L
Yes
20 Jun 2026
9 May 2026
28 May 2026
9 May 2026
26 May 2026
11 May 2026
9 May 2026 - 19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PARTICULAR | |||||
| 1.01 | Dismantling of belt structure along with PVC belt (800/1000mm) including cleaning & stacking the same within a distance of 50m. | - | mtr | 62.11 | - |
| 1.02 | Transportation of PVC belt (1000mm) from surface to u/g or one section to another sectionin u/g through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part there of including loading, unloading & stacking the same at destination (4870 X 2=9,740.00 Mtr.) | - | mtr | 77.14 | - |
| 1.03 | Transportation of steel structures materials from surface to underground or one section to another section through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. | - | tonne | 283.09 | - |
| 1.04 | Installation/erection of complete belt conveyor structure (1000mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete. Total Length = 4870.00 mtrs. | - | mtr | 465.23 | - |
| 1.05 | Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor. (4870.00X2=9,740.00 Mtr.) | - | mtr | 92.97 | - |
| 1.06 | Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/ transporting from other section through haulages/pushing manually. | - | Set | 15,428.6 | - |
| 1.07 | Shifting of tail end drum of belt conveyor (800/1000 mm with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling, carrying , from one place to other place in same section/district within a lead of 50m. | - | Set | 7,714.3 | - |
| 1.08 | General cleaning/house keeping not exceeding 5cm in depth including disposal of cleaned muck/debris to be stacked up to 50 m. or to be levelled and neatly dressed at site of drive head installations. 15.00x6.00x 8 nos. = 720.00 Sq.m. | - | square meter | 13.63 | - |
| 1.09 | Cutting in soft stone by chisel & hammer for digging of pits of foundation work-
a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 8 Set = 32.00m3
b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 8 Set = 05.12 m3
c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 8 Set = 5.12 m3 Total = 42.24 m3 | - | cubic mtr | 5,510.21 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.48 MB
BOQ_372170.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .