| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC 34 SATHASIVAM ROAD 2ND STREET GOBI ERODE 638 452 | GOBI | ERODE | TAMIL NADU | 638452 | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.4 L+₹41,950 (3.23%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹18.0 L+₹5.0 L (38.4%)Rejected-AOC 3 513 3 SANGAMAM STREET KAMARAJ NAGAR BHAVANI T K 638 301 | BHAVANI | ERODE | TAMIL NADU | 638301 | L3 | Rejected-AOC L3 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
20 Mar 2025, 2:00 pmClosed
SE/GEDC/Gobi
110/11KV Gobi SS Campus, Vettaikarankovil, Gobi-638476
Works contract for HT/LT line works in West/Gobi Sub division of Gobi Division
2025_EB_531564_1
ET No.44/24-25, Dt.26.02.2025
Open Tender
Electrical and Maintenance Works
Works
365 days
GOBI EDC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
29 May 2025
11 Mar 2025
21 Mar 2025
11 Mar 2025
20 Mar 2025
11 Mar 2025
Amount
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Excavation of Stay pit 4.5' to 5' by using JCB or manual
Excavation of pole pit above 8 Mts PSC/RCC/RSJ Pole by using JCB or manual
Excavation of pit in Hard rock requires without blasting (where houses are located)
Erection of RCC poles/PSC Poles / Metal poles upto 27'(8.0m) pole by using JCB or manual
Erection of RCC poles/PSC Poles/metal poles above 8 mtrs pole by using JCB or manual
Erection of RSJ, Rail and fabricated poles above 9.0m pole by using JCB or manual
Erection of stay set complete
Fixing of HT "V" cross arms (all types)/Channel cross arms/Guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase ph X arm
Fixing of Tapping Xarm
Fixing of HT/LT TI fittings
Fixing of HT Pin insulator 11 KV
Fixing of HT 11KV strain Disc
Fixing of LT pin insulators
Fixing of LT shackle
Fixing of Aluminium Knob
Earthing of pole with pin including burying ,looping and binding
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/4.09 mm
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/3.35 mm or AAAC 7/3.15 mm conductor
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/2.59 mm or AAAC 7/2.50mm conductor
Sleeve concreting including materials (Cement + river sand/M sand and Blue metals and watering).
Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel seating channel,belding angle including concreting (Expect erection of Transformer)
Dismantling of Double Pole Transformer Structure
Erection of D.P structure with AB switch, top channel, cross bracing, earthing, providing stay including concreting.
Dismantling of Double Pole DP Structure
Erection of Single pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of tapping channel,Transformer bed structure including concreating (Expect erection of Transformer)
Guarding arrangements with Flat guarding including fixing of 2Nos. Cross arms HT/LT
Transport of poles/Materials/ conductors /DT/Metering Set and other materials( excluding loading and unloading charges.) below 8 Kms (Plains) (ie) No retrusion charges.
Transports of poles /Materials /Conductors and other materials(excluding loading and unloading charges) for above 8 Kms for addl. Kms( Irrespective of weight in Tonage/KM (ie) No retrusion charges.
Loading of metal poles ( all sizes)
Unloading of metal poles ( all sizes)
Loading of poles up to 8 M RCC/PSC poles
Loading of poles above 8 m RCC/PSC poles
UnLoading of poles up to 8 M RCC/PSC poles
UnLoading of poles above 8 M RCC/PSC poles
Transporting of poles from road side to pole pit Location including loading and unloading of poles by using JCB or Manual Up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual beyond 100 m
Resagging of HT/LT line with ACSR 7/4.09mm
Re-sagging of HT / LT line with ACSR 7/3.35mm or AAAC 7 /3.15 mm conductor
Re-sagging of HT / LT with ACSR 7/2.59mm or AAAC 7 /2.50 mm conductor
Releasing of grills from RCC poles
Erection of new transformer for all capacities and HT metering set
Labour charges for alteration of Back clamps/Stay Clamp to suit for the works
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.)
Drilling of hole in channel only 3/4" & 1" per hole
Dismantling of pole above 8.0 mtr
Dismantling of pole up to 8.0 mtr
Dismantling of 'V' X arm(all types), Channel X arm, Guarding X arm
Dismantling of LT 3 phase X arm
Dismantling of LT single phase X arm
Dismantling of HT/LT TI fitting
Dismantlingof 11KV strain disc
Dismantling of 11 KV/22KV pin insulator
Dismantling of LT shackle
Dismantling of LT pin insulator
Dismantling of Aluminium knob
Dismantling of stay set
Dismantling of ACSR 7/3.35mm orAAAC 7/3.15 conductor
Dismantling of ACSR 7/2.59mm or 7/2.11mm conductor
Loading of materials
Unloading of materials
NATHANCO (BID ID -1272373)
KSM AND CO (BID ID -1274708)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .