Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance 1st Lowest | |
| 2 | L2₹1.7 L+₹264.40 (0.16%)Accepted-Finance | L2 | Accepted-Finance 2nd Lowest | |
| 3 | L3₹1.8 L+₹10,228.75 (6.06%)Accepted-Finance | L3 | Accepted-Finance 3rd Lowest | |
| 4 | L4₹1.8 L+₹10,962 (6.49%)Accepted-Finance | L4 | Accepted-Finance 4th Lowest |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
1 Sept 2023, 6:00 pmClosed
DFO, Social Forestry Division Anantnag
Social Forestry Division Khanabal Anantnag
Renovation of Mali Hut at 2LDR Nursery Hutmurrah of Social Forestry Range Anantnag under CAPEX.
2023_FD_227566_1
e-NIT 19 of 2023-24
Open Tender
Civil Works
Item Rate
90 days
2/LDR Nursery Hutmurrah
Renovation of Mali Hut at 2LDR Nursery Hutmurrah of Social Forestry Range Anantnag under CAPEX.
2 documents required · 2 mandatory
₹500
Forest Head - 0406
₹4,000
5 Sept 2023
25 Aug 2023
2 Sept 2023
25 Aug 2023
1 Sept 2023
26 Aug 2023
Amount
Demolishing/dismantling cement concrete work in floors by mannual/mechanical means disposal lead 50 mtrs and lift 1.5mtr. Washroom = 1x6'-8''x5'-3''x0-12'' =34.96 cfts Kitchen = 1x7'-0'' x 6'-8'' x 0-12'' = 46.62 cfts Total = 81.58 cfts or 2.30M3
Earth work in trenches excavation mannualy exceeding 30 cm in depth 1.5 mtr in width as well as 10 sqm on plan disposal of excavated material upto 25 mtr lead. Septic Tank+50Kagepit 1x12'-0''x9'-0'' x7'-0'' = 756.00 Cft D/d exiting pit (8'-0'')2 x 4'-0'' = (-) 200.96 Cft Net = 555.04 Cfts = 15.70 M3
Providing and laying dry stone soling dully hand packed including watering and ramming and all carriages compeletion including Headload for 500 mtrs. Qnty (1x6'-8''x5'-3'') + 1x(7'-0''x6'-8") x 0-3" = 20.39 Ctfs 1 x 12'-0'' x9'-0'' x 0.4'' = 35.64 cfts Total = 56.03 Cfts or 1.58M3
Providing and laying in position cement concrete specified mix (1:4:8) with 40 mm NSA (nominal size crushed stone aggregates) including curring but excluding carriage of aggregates. Qnty = 1 x (6'-8''x5'-3") + 1 x (6'-8''x7'-0'') x 0-4'') = 26.92 Cfts 1x12'-0'' x 9'-0''x0'-4'') = 35.64 Cfts Total = 62.56 Cft or 1.77 M3
Providing and laying 50mm thick cement concrete flooring in (1:2:4) mix with 20 mm (nsa) including curring but excluding carriage of aggregate. Wash room + kitchens[1x6'-8''(5'-3''+7'-0''] = 81.58 Sft . 1x12'-0''x9'-0'' = 108.00 Sft Total = 189.58 Sft = 17.62 M3
Providing and fixing of 1st quality ceramic glazed floor and wall tiles thickness to be specified by amnufacturer of approved make like, NITCO, Karjaria, Somany, Orient or equalent make except burgandy bottle green and black of any size as approved by site incharge, laid over 12mm mortar (1:3) mix and jointing with whilte cement blurry with matching pigment including all carriages complete. a) Floor = 1 x 6'-8'' x 5'-3'' = 34.96 Sft b) Walls = 2 (6'-8''+5'-4'') x 5'-0'' = 120.00 Sft Total = 154.96 Sft D/d for Door = 1x3'-0'' x 5'-0'' = - 15.00 Sft Net = 139.96 Sft = 13.00 M2
Brick masonary in super structure/foundation using F.P.S bricks non-modular of class 7.5 designation laid 1:6mix. Septic tank walls - Full - 2(8'-0''+7'-0'') x 0.9'' x 6'-0'' = 139.50 Cfts Honey Combo = 1/2 x [7'-6'' + 2 (4'-0'') x 0-9'' x 6'-0'' = 34.87 Cfts For sokepit, add for pillar for sintext tank, 5x0-9'' x 0-9'' x 3'-6'' + 9.84 Cft Total = 184.21 Cfts = 5.21 M3
Providing and laying cement concrete specified mix (1:1/2:3) mix with 20 mmm NSA for RC work incl. curring but excluding carriage and cost of materials and form work. Slabs = 1 x 12'-0''x7'-6''x0-6'' = 45.00 Cfts 1 x 4'-0'' x 4'-0'' x 0-6'' = 8.00 Cfts Total = 53.00 Cfts or 1.50 M3
Centering, shuttering incl. propping, strutting and removal of the form. For suspended floors. 1x 12'-0'' x 7'-0'' = 90.00 Sft 1x4'-0'' x 4' - 0'' = 16.00 sft Total = 106.00 Sft = 9.85 M3
12mm cemnt sand plaster on walls in 1:4 mix Wash room( 2(6'-8''+ 5'-4'') x 9'-0'') = 216.00 Sft Septic Tank 1x[2 (8'-0'') +3 x 7'-6'')x6'-0'' = 231.00 Stf Total = 447.00 Sft Pillar 4x5x12'' x 3'-6'' = 70.00 Sft T. = 5177.00 Sft D/d for door 1x3'-0'' x 6'-0'' = - 19.50 Sft Net = 497.50 Sft = 46.23 M3
P/F in position pvc double layer sintex water storage tank 500 litre capacity with all accessories and fixtures complete. Qnty 500 Litre
P/F white vitreous china pedetal type WC (European) type WC with seat and lid, 10 litre capacity con level white vitreous China flushing cistern incl. flash pipe with manually controlled device (handle leve) with all fittings etc incl. all cuttings and making good the walls. Qnty 1 No's
Reinforcement TMT steel incl. straightening, cutting, placing in position bending, binding and fixing in position all carriages complete. Qnty vide item 8 = 1.50m3 @ 120kg/m3 - 180 Kgs
P/F of PVC water supply pipe type B of good quality and make incl. all cuttings and making good the walls complete. 25-20 mm dia pipe = 200 RM
P/F CP brass fittings a) Bib Cock
b) Towel Rod
c) Angle Valve
d) Soap Dish
e) Jallie
f) Mirror (600x450)mm
Carriage of aggregates by MT for 20 km Qnty vide item 4 = 01.77 m3 @136% = 2.40 m3 Qntly vide item 5 = 17.62 m2 @ 6.90% = 1.21 m3 Qnty vide item 8 = 01.50 m3 @ 135% = 2.02 m3 Qnty vide item 10 = 46.23 m2 @2.5% = 1.15 m3 Total = 8.34 M3
M/S GH MOHD WANI
ABID AHMAD TRUMBOO
AADIL AHMAD BHAT
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .