Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹42.0 L+₹11,000 (0.26%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹42.5 L+₹61,000.01 (1.46%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L3₹42.5 L+₹61,000.01 (1.46%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 5 | L4₹42.5 L+₹61,000.01 (1.46%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
9 Oct 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DD FPF Gamma Unit J-10 Kishtwar
Near Chenab Hospital NHPC Kishtwar
BOQ
2020_FD_104718_1
02 of 2020-21
Open Tender
Civil Works
Item Wise
30 days
Forest Complex Sarkoot Kishtwar
SBD
2 documents required · 2 mandatory
₹2,000
DD FPF Gamma Unit J-10 Kishtwar
₹1 L
18 Nov 2020
18 Sept 2020
12 Oct 2020
18 Sept 2020
9 Oct 2020
18 Sept 2020
90 days
Amount
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : In cement mortar
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead:1:3:6 or richer mix
Earth work in excavation by manual means over areas (Exceeding 30 mm and upto 1.5 fttr in depth, 1.5 fttr in width as well as 10 sqft. on plan) including disposal of excavated earth upto 1 fttr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Ceftent : 5 coarse sand :10 graded stone aggregate 40 ftft noftinal size) including all leads,lift and carriage
Providing and laying in position ceftent concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Ceftent : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) with 20% boulderincluding all leads,lift and carriage
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:4 ( 1 cement : 4 coarse sand)
Providing and laying damp-proof course 50rnm thick with cement concrete 1:2:4 (1 cement : 2 co.:Hse sand 4 graded stone aggregate 20mm nominal size - Crushedincluding all leads,lift and carriage
Centering and shuttering including strutting, propping etc. and removal of form work for- Foundations, footings, bases for columns
Filling available excavated earth (excluding rocks) in trenches, plinth, sides of foundation etc. Layers not exceeding 20 cm in depth, consolidating each deposited layer by remming and watering lead upto 50 m and lift upto 1.5 m.
Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level.
half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand)including all leads,lift and carriage
extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level.including all leads,lift and carriage
Honey-comb brick work 10/11.4 cm thick with common burnt clay (non-modular) bricks of class designation 75 in superstructure above plinth level upto floor five level in cement mortar 1:4 (1 cement : 4 coarse sand) including curing completeincluding all leads,lift and carriage
Providing and Laying Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement :1.5 coarse sand :3 graded stone aggregate 20 mm nominal size).including all leads,lift and carriage
Centering and shuttering including strutting, propping etc. and removal of form for :Lintel, beams, plinth beams, girders, bressumers and cantilevers.
Centering and shuttering including strutting, propping etc. and removal of form for : Edges of slab
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . Cold twisted bars
Providing wood work in frames of Doors, windows, clerestory windows and other frames. Wrought framed and fixed in posiotion with hold fastlugs orwith dash fasteners of required diaand length ( hold fast lugs or with dash fasteners shall be paid saperately): Sal wood.
Providing 40x5mm flat iron hold fast 40 cm long including fixing to frames with 10mm diameter bolts ,nuts and wooden plugs and embeddingsin cement concrete blocks 30x30x15 cm 1:3:6 mix (1 cement :3 coarse sand :6 graded stone aggregate 20mm nominal size)
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 fine sand)
15mm thick cement plaster in 1:6 mix (1 cement :6 corse sand )
P/f of Conduits with all fittings complete
P/f of deep boxes, fan boxes.
Construction of cement concrete water storage tank of size 12x8x7(internal clear size)
ASIF IQBAL KHAN (KHAN CONSTRUCTIONS)
M/S MASHOOD AHMED MATTOO CONTRACTOR
MUSHTAQ AHMED RATHER
M/s KamalJit Singh
BILAL ASHRAF MINTOO
M/S ABDUL LATIF BHAT BAGWAN AND CO
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .