Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.8 LAccepted-AOC | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹89.4 L+₹71,995.82 (0.81%)Rejected-AOC | L2 | Rejected-AOC Second Lowest | |
| 3 | L3₹90.3 L+₹1.6 L (1.85%)Rejected-AOC | L3 | Rejected-AOC Third Lowest |
| Sl No | Description | Qty | Unit | MJD BUILDERS L3 | ASAN JAFFER ALI L1 | sundarraj Construction Company L2 |
|---|---|---|---|---|---|---|
| 1.00Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls | ||||||
| 1.01 | Pressed Tiles & Weathering Course | 113.36 | M2 | 53 ₹6,008.08 | 52 ₹5,894.72 Lowest | 53 ₹6,008.08 |
| 1.02 | chipping of concrete and roughing the surface Roughing | 229.86 | M2 | 46 ₹10,573.56 | 45 ₹10,343.7 Lowest | 46 ₹10,573.56 |
| 1.03 | Brick / stone masonry in Cement mortar walls under 3m high | 11.38 | M3 | 327 ₹3,721.26 | 321 ₹3,652.98 Lowest | 324 ₹3,687.12 |
| 1.04 | Dismantling plain Cement concrete | 3.99 | M3 | 563 ₹2,246.37 | 551 ₹2,198.49 Lowest | 557 ₹2,222.43 |
| 2.00Providing two legged scaffolding using 15cm diameter blue-gum posts or casuarina posts or best quality bamboo posts of 4m over all length (3m+0.5m projection+0.5m into the ground) the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces at2m c/c including longitudinal and transverse middle braces to step up and providing a platform with country wood planks of 40mm thick and 1m width etc.,in a complete form using coir and nails 1m run. | ||||||
| 2.01 | Upto 10.50m Height | 35 | RM | 2,003 ₹70,105 | 1,963 ₹68,705 Lowest | 1,982 ₹69,370 |
| 3.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth. | 104.94 | M3 | 120 ₹12,592.8 | 118 ₹12,382.92 Lowest | 119 ₹12,487.86 |
| 4.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 21.49 | M3 | 167 ₹3,588.83 | 164 ₹3,524.36 Lowest | 165 ₹3,545.85 |
| 5.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for Foundation including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 11.4 | M3 | 5,671 ₹64,649.4 | 5,558 ₹63,361.2 Lowest | 5,612 ₹63,976.8 |
Tender Value
₹87.9 L
EMD Value
₹54,000
Closing Date
16 Sept 2025, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Buildings Construction and Maintenance Circle, Tirunelveli
Upgradation of student hostel blocks for Mens in Tirunelveli Medical College at Tirunelveli in Tirunelveli District.
2025_PWD_599773_1
16(4) SE/2025-26 dated 26.08.2025
Open Tender
Civil Works - Buildings
Lump-sum
90 days
Tirunelveli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹54,000
5 Nov 2025
2 Sept 2025
17 Sept 2025
2 Sept 2025
16 Sept 2025
2 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .