Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically qualified |
| 3 | Accepted-Technical | Accepted-Technical Technically qualified |
Tender Value
₹22.9 L
EMD Value
₹45,800
Closing Date
7 Mar 2026, 6:00 pmClosed
CE, MDA
MDA Office, Sec-13, New Moradabad
Civil Work
2026_MDA_1120039_1
25/MDA/CE/2025-26
Open Tender
Civil Works - Roads
Percentage
120 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
CAO
₹45,800
7 Apr 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling birick work or stone work in line or cement mortar and in including stacking or materials as directed by the Engineer- in- charge with in a distance of 60 meter (200 feet) item No. 692 SOR 2022 | 1.8 | Cum | 1,588.82 | ₹2,859.88 |
| 2 | Brick recoverd from Dismantling damage park baundry wall | 500 | nos | 5.8 | ₹2,900 |
| 3 | Brick Bats recoverd from Dismantling damage park baundry wall | 0.72 | Cum | 1,200 | ₹864 |
| 4 | Earth filling including Cutting. of earth in odinary soil (loam, clay or sand) includy lift 1.5m and lead 50.m. The earth from cutting will be used in making embankment in 20cm layer with a lead of 8km. with ramming dressing the surface to requried level Slope all complete as pes direction of E/Iinculding earth cutting, Cost of earth 8km Cantage cost, louding, unloading. ete all Comp. (PWD SI No-253A+231a)/2022 | 2,057 | Cum | 324 | ₹6,66,468 |
| 5 | Earthwork: Excavation in trenches for foundations,pipes cables etc. in ordinary soil (Loam, Clay or Sand) including lift upto 1.5 m lead upto 50m and drassing of sides and ramming of bottom disposal of surplus excavated earth as directed by Engineer- in- charge with lead of 50 m . S.I. 2.6 DSR 2023 | 72 | Cum | 200.74 | ₹14,453.28 |
| 6 | Cement Concrete with 4cm. Guage brick ballast fine sand of 1:25 F:M and cement in proporation of 8:4:1 in foundation and under floors including supply of all meterials. labour T&P etc all complete. (SI.No-275/2022) | 50.25 | Cum | 3,500 | ₹1,75,875 |
| 7 | M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth in Cement mortar 1:4 (1 cement: 4 coarse sand). including all materials, labour and T&P etc. required for proper completion of work. D.S.R. 2023, 6.1.1 | 35.5 | Cum | 5,684.24 | ₹2,01,790.52 |
| 8 | M-150 brick work in 1:4 cement and coarse sand mortar in super structure including necessary cutting and moulding of brick as required thickness of walls including all materials, labour and T&P etc. required for proper completion of work. D.S.R. 2023, 6.3 5684.24+1522/11= 7206.36 | 44 | Cum | 7,206.36 | ₹3,17,079.84 |
| 9 | M-150 brick work in 1:3 cement and coarse sand mortar in super structure including necessary cutting and moulding of brick as required thickness of walls nat to be less than 1/2 brick thick wall including all materials, labour and T&P etc. required for proper completion of work. D.S.R. 2023, 6.13.1 | 67.1 | sqm | 718.56 | ₹48,215.38 |
| 10 | Dimantling existing plaster including Disposal of refuse as directed by the Engineer in charge with in a distance of 60 meet (200 feet) SOR N0 706/2022 | 25 | sqm | 42.14 | ₹1,053.5 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
TDfor04.pdf
Tender Documents • 2.60 MB
BOQ_2083281.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .