Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.2 L
EMD Value
₹10,000
Closing Date
9 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO KTR (VP)
BDO KTR
Construction of Cremation Shed to Mannivakkam BG in Mannivakkam Panchayat at Kattankolathur Panchayat Union.
2024_RDTN_438992_1
819/2024/B5 Date 04.03.2024
Open Tender
Civil Works
Item Rate
90 days
BDO KTR
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
Yes
9 Mar 2024
4 Mar 2024
9 Mar 2024
4 Mar 2024
9 Mar 2024
4 Mar 2024
Amount
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Filling the foundation and basement with M.Sand and including cost and conveyance of sand from approved source and including all labour charges etc complete
Cement concrete 1:4:8 mix Using 40 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Brick work in CM 1:5mix using country bricks ground moulded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Reinforced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Above GL
Cement Concrete 1:2:4 (one cement , two sand, and four hard broken stone) using 20 mm , gauge machine broken hard granite stones jelly for RCC items of works excluding cost of reinforcement and fabricating Charges and centering and shuttering charges but including curing and Providing fixtures like fan clamps in the RCC floor or roof wherever necessary and bearing surfaces of walls, sides and bottom of slab,beams etc,shall be finished smooth with cement mortar 1:3 ( one cement and three sand) 12 mm thick and with Kraft paper without claiming extra etc.,as directed by the departmental officers complete complying with standard specification. For foundation and basement
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29 m height for plane surfaces in all floors with all cross bracing using mild steel sheets of size 90 cm X 60 cm and 10 gauge stiffened welded with mild steel angels of size 25 mm X 25mm X 3 mm for boarding laid over silver oak( country wood) poists of size 10 cm X 6.5 cm dia spaced at about 90 cm center to center etc. complete complying with standard specification and as directed for the following items. a) RCC floor slab roof slab rectangular square. Tee or Ell beams, lintels staircase waise slab landing slab , landing beam, portico beam etc.
Above GL
supplying fabrication of steel including all labour charges etc completed
Plastering with cement mortor 1:5 using 12mm thickness including all labour charges etc.completed with standard specification
Finishing the exposed surface of RCC items of work such as slabs,beams, sunshade, facia, canopy slab, staircase waist slab,landing slab, etc.,with CEMENT MORTAR 1:3 (one cement and three sand) 10mm, thick including the cost of providing cement mortar beading or nosing for sunshade and staircase steps, landing slabs, etc., complete complying with standard specification.
Colour washing TWO coat with approved quality and colour emulsion paint including all cost and conveyance and all labour charges etc.complete.
For Compound Wall : Earthwork excavation in all classes of soils except hadr rock in hard ORDINARY SOIL with initial lead and lift including all other labour chargesetc. Complete as per SS 20 B.
Filling with good M. sand including cost and conveyance to site and labour charges for filling, watering, tamping etc. complete
Cement Concrete 1:4:8 using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Brickwork in cement mortar 1:5 mix using stock bricks including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete
Reinforcement Cement Concrete 1:11/2:3 using 20 mm guage machine broken hard broken granite stone jelly for all RCC including cost conveyance and all labour charges etc. complete.
Above GL
Providing centering and shuttering for all RCC items of work including cost and conveyance of all materials to site etc. complete
Above GL
Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc. complete.
Plastering in CM 1:5 mix, 12mm thickness including cost and conveyance of all materials to work site from approved quarry sources and labour charges etc. complete.
Painting two coats over the newly plastered surface with approved exteroir emulsion colour including cost , conveyance and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
L.VENKATESAN
stage.html
html • 0.02 MB
finance_521963.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .