Loading…
Loading…
Tender Value
₹74.7 L
EMD Value
₹1.5 L
Closing Date
23 Jul 2026, 3:00 pm
Improvement of structural life of Composite ROBs and Steel TGBs by Conventional Painting of various bridges in KYN-IGP section of Mumbai division. (10 Bridges)
CR-BR192026-27
CR-BR192026-27
Open
6 Months
Mumbai, Maharashtra
₹0
₹1.5 L
30 Jun 2026
30 Jun 2026
9 Jul 2026
Supply, fabrication and erection of steel members to replace existing corroded members of built up section made up of MS plate, angles, channels of different thickness and sizes including painting with one coat of ready mix paint Zinc Chromate priming to IS:104 followed by one coat of ready mix paint red-oxide Zinc Chrome priming paint to IS:2074. Structural steel should 2 conform to IS:2062 E250- Grade'B0'. Fabrication and erection to be as per existing design initially by bolts and nuts and finally by rivetting during the sanctioned traffic block. Rate includes cutting of new steel work, removal of rivets by drilling, dismantling of any existing members required for inserting fabricated members, fixing of new fabricated built up members with all tools, plants, labour, consumables, machinery and accessories etc. Work will be executed as per IRS:B 1-2001. Note: Painting shall be paid extra under relevant item.
Supplying and changing of corroded worn-out and loose rivets of any size at any location of the bridges with or without traffic blocks including all tools, plants, machinery complete in all respects. For Rivets of size up to 25mm dia.
Removing all loose concrete, cleaning rust with dusting compound & water jet, drying, replacing worn out reinforcements by welding new reinforcement for making up lost steel section, applying approved anti-corrosive polymer coating over the damaged area to proper profile, 4 providing polymer mortar (up to 20mm thickness) or polymer concrete (more than 20mm thickness) consisting of cement, sand, 6mm down chips where required and polymer as per manufacturers' specification. The rate includes curing for 14 days, all materials, consumables, labours, tools and plants, scaffolding/staging with all lead and lift. Note: Cost of reinforcement, if used, to be paid separately. 20mm thick polymer mortar
Removing all loose concrete, cleaning rust with dusting compound & water jet, 5 drying, replacing worn out reinforcements by welding new reinforcement for making up lost steel section, applying approved anti-corrosive polymer coating over the damaged area to proper profile, providing polymer mortar (up to 20mm thickness) or polymer concrete (more than 20mm thickness) consisting of cement, sand, 6mm down chips where required and polymer as per manufacturers' specification. The rate includes curing for 14 days, all materials, consumables, labours, tools and plants, scaffolding/staging with all lead and lift. Note: Cost of reinforcement, if used, to be paid separately. 20mm - 50mm thick polymer concrete
Providing and laying in position Plain cement concrete of specified Nominal Mix for 6 miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes.
Supply and using Cement at Worksite Ordinary Portland Cement 53 grade of approved brands/makes
Centering and shuttering including strutting, propping etc. and removal of form for : 9 All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material 10 and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. All kinds of soils
Item Breakup - 1-MS items
Existing girders with old paints
Surface preparation for painting of bridge Sqm plate/composite girders and other steel structures where the finishing coat shows signs of deterioration; but primer coat of paint is sufficiently in good condition and there are no signs of rusting etc. Surface shall be cleaned free from oil grease, scaling and other foreign matters without disturbing the primer coat {Rate includes cost of labour, consumables, tools & plants, scaffolding, jhoola, ladder etc.} Painting of cleaned plate/composite bridge girders including all scaffolding along with provision of Jhoola / hanging scaffolding ladders etc. where required.
With one coat ready mix Zinc Chromate Sqm conforming to IS:104 with DFT of 25-30 Microns followed by one coat of Zinc Chromate red oxide conforming to IS:2074 DFT of 25 Microns
With two coats of Aluminium paint in dual Sqm containers conforming to IS:2339 with DFT of 15 - 20 Microns for each coat. Surface preparation of steel work of bridge plate/composite girders by cleaning with scrappers and/or wire brushes to remove all rust and loose or perished paint to prepare perfectly clean & dry bare metal surface free from all dirt/foreign material & ready for initial coat of paint for new or existing steel girders. Rate includes cost of labour, consumables, brushes, tools & plants, ladders, scaffoldings, jhoola, hanging scaffolding staging etc. 5 041221(041280) Extra for working under traffic conditions Sqm 2500.00 5.31 13275.00 over items 041220 to 041274 [RATE = 10%] 6 041240(041280) Extra for working under traffic conditions Sqm 18881.00 2.60 49090.60 over items 041220 to 041274 [RATE = 10%] Painting of cleaned plate/composite bridge girders including all scaffolding along with provision of Jhoola / hanging scaffolding ladders etc. where required. 7 041261(041280) Extra for working under traffic conditions Sqm 2500.00 8.35 20875.00 over items 041220 to 041274 [RATE = 10%] 8 041263(041280) Extra for working under traffic conditions Sqm 21400.00 8.73 186822.00 over items 041220 to 041274 [RATE = 10%] Total 2970704.60
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
19-TD.pdf
ATTACHMENT
Checklistabove50Lakh1.pdf
ATTACHMENT
Download all tender documents and submit your bid