Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance 14L TELEPARA LANE DHAKURIA KOLKATA 700 031 | KOLKATA | WEST BENGAL | 700031 | L1 | Accepted-Finance As lowest quoted rate and L1 bidder | |
| 2 | L2₹4.9 L+₹3,202.23 (0.66%)Rejected-Finance | L2 | Rejected-Finance Due to higher rate than L1 bidder | |
| 3 | L2₹4.9 L+₹3,202.23 (0.66%)Rejected-Finance | L2 | Rejected-Finance Due to higher rate than L1 bidder | |
| 4 | L3₹4.9 L+₹8,005.57 (1.66%)Rejected-Finance | L3 | Rejected-Finance Due to higher rate than L1 bidder | |
| 5 | L3₹4.9 L+₹8,005.57 (1.66%)Rejected-Finance | L3 | Rejected-Finance Due to higher rate than L1 bidder |
Tender Value
₹4.9 L
EMD Value
₹9,704
Closing Date
4 Aug 2026, 11:00 amClosed
Assistant Engineer
BIDHANNAGAR WEST SUB DIVISION-III, PURTA BHAVAN, 1ST FLOOR, ROOM NO-122, SALT LAKE, KOLKATA -91
Internal repairing and painting at stair, lobby and General passage at 1st, 2nd, 3rd and 4th floor level at B2 block of Bidhan Sishu Police Housing Estate during the year 2026-2027.
2026_WBPWD_5017338_4
WBPWD/AE/BNWSD-III/NIT-07e /2026-2027
Open Tender
CIVIL WORKS
Percentage
21 days
Bidhannagar, Salt Lake
Please refer Tender documents.
3 documents required · 3 mandatory
₹9,704
Yes
14 Aug 2026
24 Jul 2026
6 Aug 2026
24 Jul 2026
4 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | - | Sq.M. | 19 | - |
| 2 | Cleaning the concrete surface by removing dirt and debris, marking defectivem locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge. | 1 | Sq.M. | 90 | ₹89.91 |
| 3 | Guniting concrete surface with cement mortar (25 mm nominal thick) applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification. | 1 | Sq.M. | 912 | ₹911.09 |
| 4 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
With 1:6 cement mortar
(b) 20 mm thick plaster First floor | - | Sq.M. | 175.73 | - |
| 4.01 | Second floor | - | Sq.M. | 179.73 | - |
| 4.02 | Third floor | - | Sq.M. | 183.73 | - |
| 4.03 | Fourth floor | - | Sq.M. | 187.73 | - |
| 4.04 | (ii) With 1:4 cement mortar
(c) 10 mm thick plaster
First floor | 1 | Sq.M. | 134.55 | ₹134.42 |
| 4.05 | Second floor | 1 | Sq.M. | 138.55 | ₹138.41 |
| 4.06 | Third floor | 1 | Sq.M. | 142.55 | ₹142.41 |
stage.html
html • 0.14 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
2911.pdf
Tender Documents • 1.25 MB
BOQ_5087427.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .