Tender Value
₹4.2 Cr
EMD Value
₹6.4 L
Closing Date
12 May 2026, 9:30 pmClosed
Public Works Department
Executive Engineer PWD Division Kalaburgi
IMPROVEMENTS TO ROAD OF DISTRICT MAJOR ROAD FROM SUNTNOOR CROSS TO NIMBARGA CROSS (CH. 0.00 TO 5.00KM ) IN ALAND TALUK OF KALABURGI DISTRICT.5054 FOR THE YEAR 2025-26
PWD/2025-26/RD/WORK_INDENT34378
PWD/2025-26/RD/WORK_INDENT34378
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Kalaburagi
5 documents required · 5 mandatory
To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2021-22, 2022-23, 2023-24 ,2024-25 &2025-26 a) Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 847.16 lakhs
To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2021-22, 2022-23, 2023-24 ,2024-25 &2025-26 b) Satisfactorily completed, as prime contractor, at least one similar work such as Road Work of value not less than Rs. 211.79 Lakhs
To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2021-22, 2022-23, 2023-24 ,2024-25 &2025-26 Executed in any one year, the following minimum quantities of work: 1) Earth wrok/Emb 8217.00 Cum, 2) GSB 1871.00 Cum 3) WMM 2011.36 Cum 4)BM/SDBC 506.00 Cum 5) RCC/PCC 1249.46 Cum 6) STEEL40.5 Tonne
Maximum of Civil Engineering works executed in any one year during the last five years (updated to 2026-27 price level) taking into account the completed as well as works in progress. (Financial turn over of previous years shall be given a weight of 10% per year to bring them to the price level of the 2026-27)
Maximum of Civil Engineering works executed in any one year during the last five years (updated to 2026-27 price level) taking into account the completed as well as works in progress. (The value of completed works shall be given a weight of 10% per year to bring them to the price level of the 2026-27)
Tenderer should further demonstrate having- a) Excavator JCB/Hitachi 2Nos own/Lease b) Static Road Roller : 1No. own c) Vibratory road roller 1No own d) Mechanical Grader 1 No. (1 No Own/Lease/Hire) e) Hot Mix Plant40/60TPH 1 Nos own f) Mechanical Paver Finisher 1 No own g) Tippers 4Nos. (2 Nos.own 2 Nos Lease/Hire) h) Water Tanker 2Nos Own/Lease i) Pug mill 1 No Own/Lease j ) Concrete Mixer 1 Nos own/Lease
Qualification and experience of the key technical and Management personnel in permanent employment with the Tenderer and those that are proposed to be deployed on this work, if work is awarded.
Liquid Assets and /or availability of credit facilities of no less than Rs. 115.52 lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc
Report on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five years.
Latest Income Tax Clearance Certificate
Assessed Tender Capacity shall be more than the Tendered Amount
Constitutional or Legal Status of the Tenderer
Information of the works for which Tender acceptance letters are received.
Information on works which are yet to be completed
The proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.
Value at 2026-27 price level, of existing commitments and on-going works to be executed during the next 06 months(Financial commitment of previous years shall be given a weight of 10% per year to bring them to the price level of the 2026-27, (Monthwise commitment shall be furnished).
Information of the works for which Tenderer has submitted Tender.
₹5,000
₹6.4 L
12 May 2026
27 Apr 2026
13 May 2026
11 May 2026
11 May 2026
IMPROVEMENTS TO ROAD (1.55 km)
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (R...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mecha...
Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.
Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported t...
Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight ...
ROAD FURNITURES
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including ref...
Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total int...
Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI ret...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - Ordinary kilometer ston...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - 200 m stone (precast). ...
CONSTRUCTION OF 2.0x2.0mx1 VENT BOX CELL CULVERT (10.0M WIDTH ) AT CH 0.015KM , 0.935KM
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. - Above 600 mm to 900 mm dia
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). Ref to MoRT&H : IRC - 15...
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant). Ref to MoRT&H : IRC - 2702
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the fu...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. - Boulder Laid ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
CONSTRUCTION OF 1.0x1.0mx1 VENT BOX CELL CULVERT (10.0M WIDTH ) AT CH. 1.20KM
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. - Above 600 mm to 900 mm dia
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). Ref to MoRT&H : IRC - 15...
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant). Ref to MoRT&H : IRC - 2702
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the fu...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
CONSTRUCTION OF 2.0x2.0mx2 VENT BOX CELL CULVERT (10.M WIDTH ) AT CH. 1.565 KM
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. - Above 600 mm to 900 mm dia
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). Ref to MoRT&H : IRC - 15...
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant). Ref to MoRT&H : IRC - 2702
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the fu...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
CONSTRUCTION OF CC PAVEMENT (VILLAGE LIMIT) 510 M
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
CONSTRUCTION OF CC DRAIN (1150 M)
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Add for Form work, centering, shuttering, scaffolding, etc. for RCC work at 35%
Maintenance of road
Road Maintenance for 3rd year for road with BM+SDBC as wearing coat Maintenance of Road for 3rd year by Clearing and Uprooting Vegetation on either sides of the road, Maintenance of surface drains by ...
Road Maintenance for 4th year for road with BM+SDBC as wearing coat Maintenance of Road for 4th year by Clearing and Uprooting Vegetation on either sides of the road, Maintenance of surface drains by ...
Road Maintenance for 5th year with BM+SDBC coat as wearing coat Maintenance of Road for Sth year by Clearing and Uprooting Vegetation on cither sides of the road, Maintenance of surface drains by clea...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW4 34378.doc
Tender Document • 0.94 MB
short term.pdf
Others - SHORT TERM • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .