Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.0 CrAccepted-Finance | 1 | Accepted-Finance First Lowest | |
| 2 | 2₹15.3 Cr+₹34.8 L (2.32%)Accepted-Finance | 2 | Accepted-Finance Second Lowest | |
| 3 | 3₹15.5 Cr+₹53.5 L (3.57%)Accepted-Finance NAMAKKAL | 3 | Accepted-Finance Third Lowest | |
| 4 | 4₹15.7 Cr+₹68.5 L (4.57%)Accepted-Finance NO 55 A 3RD CROSS STREET SAKTHI NAGAR THINDAL ERODE 638 012 | ERODE | TAMIL NADU | 638012 | 4 | Accepted-Finance Fourth Lowest | |
| 5 | 5₹15.9 Cr+₹88.6 L (5.91%)Accepted-Finance A 24 HOUSING UNIT KOLLAMPALAYAM ERODE 638 002 | ERODE | TAMIL NADU | 638002 | 5 | Accepted-Finance Fifth Lowest |
| Sl No | Description | Qty | Unit | SEA ROCK INFRASTRUCTURE L10 | EEE PEE S AND CO L7 | Selvam Infrastructures L2 | PSK ENGINEERING CONSTRUCTION AND CO L11 | SRK ASSOCIATESS L9 | Smart Infratech Developers L14 | Andal Associates Private Limited L21 | Shree Shivane Construction L18 | M_Arc Contructions L13 | MUTHUSWAMY CONSTRUCTION L17 | JRT CONSTRUCTIONS L20 | RSK CONSTRUCTION AND PROJECTS L12 | D KAMARAJ L15 | shanmathi constructions private limited L1 | RKK CONSTRUCTION L19 | Annanmar Constructions L16 | GRM CONSTRUCTIONS L3 | KSM INFRA WORK PRIVATE LIMITED L4 | M/s. Kousic & Co L5 | R SURESHMANI L8 | ASHOK CONSTRUCTION L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 173 | Cu.m | 260 ₹44,980 | 300 ₹51,900 | 289 ₹49,997 | 252 ₹43,596 | 310 ₹53,630 | 190 ₹32,870 | 174.4 ₹30,171.2 | 312 ₹53,976 | 160 ₹27,680 | 150 ₹25,950 | 330 ₹57,090 | 200 ₹34,600 | 357 ₹61,761 | 90 ₹15,570 Lowest | 310.73 ₹53,756.29 | 225 ₹38,925 | 274 ₹47,402 | 300 ₹51,900 | 215 ₹37,195 | 315 ₹54,495 | 306 ₹52,938 |
| 2.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers.. -for Footing Depth 2.40m to 3.30m. | 3,567 | Cu.m | 300 ₹10,70,100 | 350 ₹12,48,450 | 426 ₹15,19,542 | 342 ₹12,19,914 | 450 ₹16,05,150 | 240 ₹8,56,080 | 179 ₹6,38,493 | 312 ₹11,12,904 | 160 ₹5,70,720 | 150 ₹5,35,050 | 487 ₹17,37,129 | 180 ₹6,42,060 | 440 ₹15,69,480 | 140 ₹4,99,380 Lowest | 310.73 ₹11,08,373.91 | 225 ₹8,02,575 | 369 ₹13,16,223 | 300 ₹10,70,100 | 220 ₹7,84,740 | 315 ₹11,23,605 | 500 ₹17,83,500 |
| 3.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. -Upto 2.40m Depth. | 110 | Cu.m | 140 ₹15,400 Lowest | 150 ₹16,500 | 157 ₹17,270 | 176 ₹19,360 | 170 ₹18,700 | 145 ₹15,950 | 164 ₹18,040 | 178 ₹19,580 | 160 ₹17,600 | 150 ₹16,500 | 179 ₹19,690 | 150 ₹16,500 | 235 ₹25,850 | 180 ₹19,800 | 177.56 ₹19,531.6 | 225 ₹24,750 | 149 ₹16,390 | 172 ₹18,920 | 210 ₹23,100 | 1,815 ₹1,99,650 | 200 ₹22,000 |
| 4.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 271 | Cu.m | 100 ₹27,100 | 95 ₹25,745 | 124 ₹33,604 | 133 ₹36,043 | 135 ₹36,585 | 100 ₹27,100 | 89 ₹24,119 | 143 ₹38,753 | 50 ₹13,550 | 50 ₹13,550 | 142 ₹38,482 | 50 ₹13,550 | 49 ₹13,279 | 90 ₹24,390 | 142.05 ₹38,495.55 | 135 ₹36,585 | 35 ₹9,485 Lowest | 140 ₹37,940 | 161 ₹43,631 | 135 ₹36,585 | 200 ₹54,200 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 992 | Cu.m | 400 ₹3,96,800 | 800 ₹7,93,600 | 370 ₹3,67,040 | 900 ₹8,92,800 | 400 ₹3,96,800 | 450 ₹4,46,400 | 2,024 ₹20,07,808 | 419 ₹4,15,648 | 300 ₹2,97,600 Lowest | 2,000 ₹19,84,000 | 423 ₹4,19,616 | 500 ₹4,96,000 | 1,800 ₹17,85,600 | 2,220 ₹22,02,240 | 417.27 ₹4,13,931.84 | 1,900 ₹18,84,800 | 1,720 ₹17,06,240 | 400 ₹3,96,800 | 1,063 ₹10,54,496 | 405 ₹4,01,760 | 600 ₹5,95,200 |
| 6.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 302 | Cu.m | 430 ₹1,29,860 | 825 ₹2,49,150 | 406 ₹1,22,612 | 800 ₹2,41,600 | 440 ₹1,32,880 | 505 ₹1,52,510 | 1,075 ₹3,24,650 | 446 ₹1,34,692 | 400 ₹1,20,800 | 430 ₹1,29,860 | 464 ₹1,40,128 | 500 ₹1,51,000 | 380 ₹1,14,760 Lowest | 1,260 ₹3,80,520 | 443.9 ₹1,34,057.8 | 605 ₹1,82,710 | 603 ₹1,82,106 | 430 ₹1,29,860 | 1,569 ₹4,73,838 | 440 ₹1,32,880 | 600 ₹1,81,200 |
| 7.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by Mechanical means | 171 | Cu.m | 4,800 ₹8,20,800 | 4,900 ₹8,37,900 | 4,372 ₹7,47,612 Lowest | 5,260 ₹8,99,460 | 4,725 ₹8,07,975 | 4,500 ₹7,69,500 | 5,181 ₹8,85,951 | 4,906 ₹8,38,926 | 4,500 ₹7,69,500 | 5,200 ₹8,89,200 | 4,999 ₹8,54,829 | 5,500 ₹9,40,500 | 5,200 ₹8,89,200 | 4,570 ₹7,81,470 | 4,882.9 ₹8,34,975.9 | 5,415 ₹9,25,965 | 4,980 ₹8,51,580 | 4,700 ₹8,03,700 | 5,012 ₹8,57,052 | 4,720 ₹8,07,120 | 4,500 ₹7,69,500 |
| 8.00Brick work in Cement Mortar 1:5 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. Other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||||||||||||||||||||
| 8.01 | For Foundation and Basement | 312 | Cu.m | 7,000 ₹21,84,000 | 7,000 ₹21,84,000 | 6,210 ₹19,37,520 | 6,500 ₹20,28,000 | 6,700 ₹20,90,400 | 6,000 ₹18,72,000 | 6,839 ₹21,33,768 | 6,958 ₹21,70,896 | 7,400 ₹23,08,800 | 8,000 ₹24,96,000 | 7,101 ₹22,15,512 | 7,500 ₹23,40,000 | 7,100 ₹22,15,200 | 5,390 ₹16,81,680 Lowest | 6,924.84 ₹21,60,550.08 | 6,200 ₹19,34,400 | 5,680 ₹17,72,160 | 6,300 ₹19,65,600 | 6,300 ₹19,65,600 | 6,700 ₹20,90,400 | 6,600 ₹20,59,200 |
| 9.00Brick work in Cement Mortar 1:6 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. Other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||||||||||||||||||||
Tender Value
₹19.5 Cr
EMD Value
₹9.8 L
Closing Date
28 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Superintending Engineer, PWD.,
The Superintending Engineer, PWD., Buildings Construction and Maintenance Circle,Tiruvannamalai-4.
Construction of 50 Bedded Critical Care Block in Government Medical College and Hospital Campus at Siruvangur in Kallakurichi District
2026_PWD_698474_1
2/TVM-CLE/26-27/1/ Dt.25.08.2026
Open Tender
Civil Works - Buildings
Lump-sum
450 days
Siruvangur
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹9.8 L
4 Nov 2026
28 Aug 2026
28 Sept 2026
28 Aug 2026
28 Sept 2026
28 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 173 | Cu.m | - | - |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers.. -for Footing Depth 2.40m to 3.30m. | 3,567 | Cu.m | - | - |
| 3 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. -Upto 2.40m Depth. | 110 | Cu.m | - | - |
| 4 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 271 | Cu.m | - | - |
| 5 | Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 992 | Cu.m | - | - |
| 6 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 302 | Cu.m | - | - |
| 7 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by Mechanical means | 171 | Cu.m | - | - |
| 8Brick work in Cement Mortar 1:5 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. Other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 8.01 | For Foundation and Basement | 312 | Cu.m | - | - |
| 9Brick work in Cement Mortar 1:6 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. Other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Siruvangur50BeddedCC_PQ_draft.pdf
Additional Documents • 0.25 MB
SiruvangurDoc_GC.pdf
Tender Documents • 0.85 MB
BOQ_839593.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .