Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | L1 | Accepted-AOC LOWEST AND REASONABLE | |
| 2 | L2₹13.9 L+₹1.5 L (12.3%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹17.9 L+₹5.5 L (44.3%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN LOWEST |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
24 Oct 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE AF SRINAGAR
CWE AF SRINAGAR
REPAIR MAINTENANCE OF CENTRAL HEATING PLANT AND HOT WATER PLANT UNDER GE AF SRINAGAR
2022_MES_554325_1
CWE(AF)SGR/SGR-26/2022-23
Open Tender
Civil Works
Item Rate
180 days
AF STATION SRINAGAR
AS PER NIT
8 documents required · 8 mandatory
₹500
GE AF SRINAGAR
₹40,000
Yes
11 Nov 2022
26 Sept 2022
26 Oct 2022
26 Sept 2022
24 Oct 2022
11 Oct 2022
Amount
Supply and fixing ‘V’ belts of following cross section, pitch length & size A-28, including disconnection and taking down of ‘V’ belts from motors complete all as specified and directed. (a) Cross section 13 x 08 mm & pitch length 740 mm of size A-28. Make : Fenner / Hilton.
(b) V-belt of size B-66 for hot water blower at Bison APTT
(c) V-belt of size B-72 for AC Palnt AHU blower at WWR
(d) V-belt B –82 for hot water blower at Mig Bison APTT
(e) V-belt B –60 for hot water blower at Kopyo Lab
Disconnecting, dismantling and strip opening of the existing air handling unit of any description and in any position and of capacity 3000 CFM for overhauling and servicing including taking out existing shaft, blower, drum, pulley and dehumidifier pump etc. of air handling unit, checking thoroughly the serviceability of the parts, dismantling the parts, fixing the serviceable parts in position, replacement of the defective/non-functional /unserviceable parts/spares, reassembling, commissioning, fixing in position and testing of the air handling unit on full load for its smooth and trouble free operation all as directed. (i) The quoted rates of the contractor includes for fixing the serviceable parts in position and replacement of unserviceable parts with new parts. The new replaced parts shall be measured and paid for separately under appropriate item of Sch `A’ as supply only. (ii) Remattaling & grinding of the crank shaft, wherever applicable shall be measured and paid for separately under appropriate item of Schedule 'A'. (iii) Rates quoted by the contractor shall include the cost of transportation of any part of the AHU unit to and fro approved workshop for their repair and alignment.
(a) Supply only Pedestal bearing no NTN 205 J (Japan) or equivalent of make SKF/NBC of above item No 2.
Disconnecting and taking out existing unserviceable solenoid valve and supply & fix new solenoid valve ¼ “ with strainer 3 way. Cat part No. S 180 with Drier of Make : SPORLON. or equivalent make as approved by the GE complete all as specified directed.
Disconnecting and taking out existing unserviceable liquid line valve of any description and in any position and supply, fixing and testing of new liquid line valve Teflon sheathed brass of size 20mm, complete all as specified and directed. Make : BAP/KIM
Disconnecting and taking out existing unserviceable liquid line valve of any description and in any position and supply, fixing and testing of new liquid line valve Teflon sheathed brass of size 25mm, complete all as specified and directed. Make : BAP/KIM
Supply and fixing strip heater 3 KW, 230 volts fin type. Make : Daspas or equivalent make as approved by the GE.
Dismantling, taking down existing worn out and rusted unserviceable duct including its insulation, supports etc complete all as specified and directed.
Material and labour for fabrication of Supply air ducting made out of GI sheet of thickness 22 SWG (Zinc coating 120 gm/Sqm) and fabricated as per IS-655 including necessary bend and locking arrangements complete all as specified and directed.
Material and labour for duct insulation for unconditioned space as under:- (a) Cleaning the external surfaces of ducts to remove dust & existing treatment mortar etc. and removal from site. (b) Applying a coat of hot blown bitumen grade 85/25 confirming to IS-702 @ 1.2 Kg/Sqm on the external surfaces of ducts. (c) Providing & fixing 50 micron thick PVC sheet on the external surfaces of ducts with suitable adhesive as per manufacturer instructions. (d) Applying a coat of hot black bituminous paint of grade 85/25 confirming to IS-702 on the PVC sheet @1.2 Kg/Sqm & sprinkling dry sand on the surface while paint is still wet. (e) Providing a 2” thick layer of Glass wool all over the surface having density 24 Kg per cum (Make : UP Twiga/Llyod). (f) Providing Aluminum sheet of thickness 26 gauge over glass wool and fixed with aluminium screws.
Dismantling, taking down existing worn out and rusted unserviceable insulation, of any type of supports etc, complete all as specified and directed.
Material and labour for Insulation of M S Pipe with Glasswool slab 30 mm thick with and including GI cladding with 26 gauge GI sheet of size suitable for 25mm to 40mm dia pipe, complete all as specified and directed.
Material and labour for Insulation of M S Pipe with Glasswool slab 30 mm thick with and including GI cladding with 26 gauge GI sheet of size suitable for 50mm to 80mm dia pipe, complete all as specified and directed.
Taking up or down cast iron butterfly valve/sluice valve of any description and supplying, fixing and testing new butterfly valve complete all as specified and directed of following bores in existing pipe line after necessary cleaning etc. :- (a) 50 mm bore
(b) 65 mm bore
(c) 80 mm bore
Supply and fixing in repair testing push button unit for relay complete all as specified and directed.
Supply and fixing in repair including testing LED indicator 22.5mm suitable for operating at 240/220 volts complete all as specified and directed.
Supply and fixing in repair including testing of auxillary contact block suitable for following contactor 1 NO + 1 NC auxiliary contactor complete all as specified and directed. (a) For power contactor 3 pole 32 Amps
Supply and fixing in repair including testing of spare coil 220 volts suitable for following contactor, complete all as specified and directed. (a) For power contactor 3 pole upto 2 to 5 Amps
Supply and fixing in repair including testing spare contact kit without coil suitable for following power contactor complete all as specified and directed:- (a) For power contactor 3 pole upto 2 to 5 Amps
(b) For power contactor 3 pole 5 Amps
Supply and fixing in repair of current transformer round/ring type of following capacity and description complete all as specified and directed:- (a) Ratio 100/5 to 150/5 Amp rated burden 5 VA, accuracy class 1.0
Comprehensive maintenance on monthly basis of package type AC plant 3x11 TR+ 2x7.5 TR (05 Units) installed at KOPYO Lab Make Voltas, (i) One unit comprising of following:- (a) Condensor - 02 Nos (b) Compressor - 02 Nos (c) Blowers Motor - 01 Nos (d) Evaporator - 02 nos (e) Micro processer control panel - 01 Nos Note :- (i) Comprehensive maintenance includes ;- (a) Cleaning of all components and parts of plant, (b) Greasing of all components and parts of plant (c) Tightening of all nuts, bolts and washers etc (d) Cleaning of all filters (e) Oiling of all components and parts of plant (f) Replacement of spares as required which will be measured and paid separately under respective item as Supply only (ii) No extra cost will be paid to the contractor for T&P and trade as required. (iii) The cost of setting of design parameter of air conditioning in microprocessor control panel and maintenance of soft ware is deemed to be included in this item. Bidders shall quoted their rates accordingly.
Comprehensive maintenance on monthly basis of package type AC plant 3x7.5 TR (03 Units) installed at BISON APTT Make Voltas, (i) One unit comprising of following:- (a) Condensor - 02 Nos (b) Compressor - 02 Nos (c) Blowers Motor- 1 Nos (d) Evaporator- 02 nos (e) Micro processer control panel - 01 Nos Note :- (i) Comprensive maintenance includes ;- (a) Cleaning of all components and parts of plant, (b) Greasing of all components and parts of plant (c) Tightening of all nuts, bolts and washers etc (d) Cleaning of all filters (e) Oiling of all components and parts of plant (f) Replacement of spares as required which will be measured and paid separately under respective item as Supply only (ii) No extra cost will be paid to the contractor for T&P and trade as required. (iii) The setting of design parameter of air conditioning in microprocessor control panel & maint of soft ware is deemed to be included in this item. Bidders shall quoted their rates accordingly.
Supply only the following items for 11TR air cooled package type AC :- (a) Microprocessor sencinng panel (LCD type)
(b) Motor suitable for blower
(c) Aluminium fan blade as per Existing size
(d) Emersion thermostatic expansion valve 5 Star
Supply only the following items for 7.5TR air cooled package type AC :- (a) Microprocessor sensing panel (LCD type)
(b) Motor suitable for blower
(c) Aluminium fanblade as per Existing size
(d) Emersion thermostatic Exapn valve 5 Star
Comprehensive maintenance of Hot Water plant on monthly basis for 04 plants (SNCO Mess -02, Airmen Mess No 1- 02 Nos, Note :- (i) Comprensive maintence includes ;- (a) Cleaning of all components and parts of plant, (b) Greasing of all components and parts of plant (c) Tightening of all nuts, bolts and washers etc (d) Cleaning of all filters (e) Oiling of all components and parts of plant (f) Replacement of spares as required which will be measured and paid separately under respective item as Supply only. Note - (i) No extra cost will be paid to the contractor for T&P and trade as required. . (ii) The replacement of defective / non-functional parts shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing rate for new items are deemed to include under this item. (iii) The setting of design is deemed to be included in this item. Bidders shall quote their rates accoringly.
Supply only following components for Hot Water Plant :- (a) Fuel pump
(b) Ignition coil
(c) Ignition coil rod
(d) Nozel
(e) Photo cell
(f) Solonoid vavle
(g) Contactor
(h) Controller
(j) Thermostate
(k) Sequance controller
Comprehensive maintenance of Hot Air plant Diesel Operated with thermic fluid on monthly basis for 06 plants HQ -02, Crash Way- 04 Note :- (i) Comprehensive maintence includes ;- (a) Cleaning of all components and parts of plant, (b) Greasing of all components and parts of plant (c) Tightening of all nuts, bolts and washers etc (d) Cleaning of all filters (e) Oiling of all components and parts of plant (f) Replacement of spares as required which will be measured and paid separately under respective item as Supply only. Note - (i) No extra cost will be paid to the contractor for T&P and trade as required. . (ii) The replacement of defective / non-functional parts shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing rate for new items are deemed to include under this item. (iii) The setting of design parameter is deemed to be included in this item. Bidders shall quote their rates accoringly . (iv) Each Plant comprises of following :- (a) Aquatherm Hot water boiler 200000 kcal fully automatic model No AT 200W Make thermex Pvt (Stn HQ and Crash way) (b) Water circulating pump 5 HP Make- Kirloskar (c) Monoblock fuel pumping set 1 HP -03 Make- kirloskar (d) water circulating pump 3 HP -04 Make -Kirloskar (e) Air handling unit 9700 ,5700,3100 cum/hrs -02 Nos Make indoair (f) Hot storage tank 800 ltrs (g) Bulk fuel storage tank of 5 KL capacity-01 and fuel day tank 500 ltrs-01 No
Supply only following components for Hot Air Plant :- (a) Fuel pump
(b) Ignition coil
(c) Ignition coil rod
(d) Nozel
(e) Photo cell
(f) Solonoid vavle
(g) Contactor
(h) Controller
(j) Thermostate
(k) Sequance controller
Comprehensive maintenance of Hot Air plant electrically operated on monthly basis- 02 plant(WSA - 02Nos) Note :- (i) Comprehensive maintence includes ;- (a) Cleaning of all components and parts of plant. (b) Greasing of all components and parts of plant. (c) Tightening of all nuts, bolts and washers etc (d) Cleaning of all filters (e) Oiling of all components and parts of plant (f) Replacement of spares as required which will be measured and paid separately under respective item as Supply only. Note - (i) No extra cost will be paid to the contractor for T&P and trade as required. (ii) The replacement of defective / non-functional parts shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing rate for new items are deemed to include under this item. (iii) The setting of design parameter is include is deemed to be included in this item. Bidders shall quote their rates accoringly
Supply Only for Hot Air Plant:- (a) Heating element 25 KW
(b) Thermostate
(c) Controller
(d) Sub zero controller
(f) Contactor
(g) Time delay
(h) Over load relay
Comprehensive maintenance of Hot Air plant Diesel Operated with Hot Water on monthly basis- 01 plant SMC, and 01 plant at WSA DB6 Note :- (i) Comprensive maintence includes ;- (a) Cleaning of all components and parts of plant, (b) Greasing of all components and parts of plant (c) Tightening of all nuts, bolts and washers etc (d) Cleaning of all filters (e) Oiling of all components and parts of plant (f) Replacement of spares as required which will be measured and paid separately under respective item as Supply only. Note - (i) No extra cost will be paid to the contractor for T&P and trade as required. . (ii) The replacement of defective / non-functional parts shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing rate for new items are deemed to include under this item. (iii) The setting of design parameter is deemed to be included in this item. Bidders shall quote their rates accoringly. (iv) Each Plant comprises of following :- (a) Aquatherm Hot water boiler 200000 kcal fully automatic model No AT 200W Make thermex Pvt (SMC) (b) Water circulating pump 5 HP Make- Kirloskar (c) Monoblock fuel pumping set 1 HP -03 Make- kirloskar (d) water circulating pump 3 HP -03 Make -Kirloskar (e) Air handling unit 9700 cum/hrs -01 Nos (f) Hot storage tank 800 ltrs (g) Bulk fuel storage tank of 5 KL capacity-01 and fuel day tank 500 ltrs-01 No
Supply Only for Hot Air Plant diesel operated with hot water :- (a) Fuel pump
(b) Iginition coil
(c) Solonoid valve
(d) Sequence controller
(e) Fuel nosel
(f) Contractor
(g) Thermostat
(h) Photocell
(j) PCB controller
Comprehensive maintenance of Hot Air plant Diesel Operated with Hot Water on monthly basis- 02 plant (45 WEU), 02 plant (MLH). Note :- (i) Comprensive maintence includes ;- (a) Cleaning of all components and parts of plant, (b) Greasing of all components and parts of plant (c) Tightening of all nuts, bolts and washers etc (d) Cleaning of all filters (e) Oiling of all components and parts of plant (f) Replacement of spares as required which will be measured and paid separately under respective item as Supply only. Note - (i) No extra cost will be paid to the contractor for T&P and trade as required. . (ii) The replacement of defective / non-functional parts shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing rate for new items are deemed to include under this item. (iii) The setting of designe parameter is include in this rate. (iv) Each Plant comprises of following :- (a) Aquatherm Hot water boiler 200000 kcal fully automatic model No AT 200W Make thermex Pvt (45 WEU) (b) Water circulating pump 5 HP Make- Kirloskar (c) Monoblock fuel pumping set 1 HP -03 Make- kirloskar (d) water circulating pump 3 HP -03 Make -Kirloskar (e) Air handling unit 9700 cum/hrs -01 Nos (f) Hot storage tank 800 ltrs (g) Bulk fuel storage tank of 5 KL capacity-01 and fuel day tank 500 ltrs-01 No
Supply Only for Hot Air Plant deisel operated with hot water : - (a) Fuel pump
(b) Ignition coil
(c) Solonoid valve
(d) Sequence controller
(e) Fuel nosel
(f) Contractor
(g) Thermostat
(h) Photocell
(j) PCB controller
Comprehensive maintenance of Hot air plants on monthly basis for 04 plants (Saudamani-04 Nos). Note :- (i) Comprensive maintence includes ;- (a) Cleaning of all components and parts of plant, (b) Greasing of all components and parts of plant (c) Tightening of all nuts, bolts and washers etc (d) Cleaning of all filters (e) Oiling of all components and parts of plant (f) Replacement of spares as required which will be measured and paid separately under respective item as Supply only. Note - (i) No extra cost will be paid to the contractor for T&P and trade as required. . (ii) The replacement of defective / non-functional parts shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing rate for new items are deemed to include under this item. (iii) The setting of design parameter is deemed to be included in this item. Bidders shall quote their rates accoringly.
Supply only following components for Hot Air Plant :- (a) Fuel pump
(b) Ignation coil
(c) Ignation coil rod
(d) Nozel
(e) Photo cell
(f) Solonoid vavle
(g) Contactor
(h) PCB controller
(j) Thermostate
(k) Sequance controller
Supply and filling Thermic fluid specific quality all as specified and directed.
Disconnecting, dismantling & taking up/down pump set and monoblock pump sets of AC plant of any description and in any position from existing foundation, strip opening and dismantling of Pumps for servicing/overhauling, cleaning oiling/ greasing and fixing of serviceable parts in position, removing & replacement of defective / unserviceable parts with new parts, reassembling the pumps ensuring proper alignment of pump, fixing in position connecting to existing system and testing at site on full load to the entire satisfaction of the Engineer-in-Charge for the following capacities :- (a) 0.5 HP to 1.5 HP single phase 50 Hz
(b) 2.0 HP to 3.0 HP Three phase 50 Hz
(c) 7.5 HP HP Three phase 50 Hz
Supply only ball Bearing/Roller Bearing of the following size and make complete all specified and directed. (i) 2.0 HP to 3.0 HP Three phase 50 Hz
(ii) 7.5 HP HP Three phase 50 Hz
Supply only gun metal bushes suitable for following capacity of pumps of any make/model :- (i) 02 to 05 HP Pump
(ii) 7.5 to 12.5 HP Pump
Supply only of CI star coupling L – 190 for pump and Motor or as approved by GE. Note :- Fixing/ testing charges of these items are deemed to be included in the rates quoted by the contractor for respective Sch ‘A’ item
Supply only pump impeller suitable for following capacity of pumps of any make/model:- (i) 5 to 12.5 HP, three phase, 50 Hz
(ii) 2.0 HP to 3.0 HP Three phase 50 Hz
(iii) 7.5 HP HP Three phase 50 Hz
Disconnecting and taking down existing unserviceable condenser & supply and fixing new condenser, 10 mfd, 400 volt grade suitable for single phase motor complete all as specified and directed.
Dismantling and taking down/removing of damaged fan blades of any description and in any position from electric motors all as directed and Supply and fixing Fan blades fabricated to shape and size of Zinc Aluminum cast alloy as per sample for electric motor with key and key grove complete all as directed for the following capacity motors :- (a) 1 to 3 HP
Supply and fixing in repair including testing of bimetalic thermal over load relay for DOL/star delta starter415 volts complete all as specified and directed the following capacity of any make of pump and motor :- (a) Suitable for 0.5 HP to 2 HP
(b) Suitable for 7.5HP
Supply and fixing including testing power contactor 3 pole with 2NO +2NC auxillary contacts for AC circuit with AC coil voltage 220 volts grade 50 HZ having suitable for following pump motor starter 415 Volts rating complete all as specified and directed. (a) Suitable for 5 HP to 7.5 HP
Supply and fixing in repair including testing of power contractor 3 pole with 01N +01NC auxillary contact for AC circuit with AC coil voltage 220 grade 50 HZ having following current rating complete all as specified and directed. (a) Suitable for 5HP to 7.5HP
Supply and fixing in repair single phase preventor auxilary volts 415 volts suitable for 3 phase AC supply complete all as specified and directed. Make Minilec type VSP-D1 or equivalent of other specified makes.
Supply and fixing in repair including testing of DOL motor starter 7.5 HP capacity, 415 Volts, 3 phase, 50 Hz AC supply, in sheet steel enclosure three phase with maximum relay range of 9-15A fixed on wall with and including teak wood board of appropriate size fixed with suitable MS nut bolts/screws, complete all as specified and directed.
Supply and fixing in repair single phase 230 volt 50 HZ, 1500 RPM Dual shaft 1 HP motor suitable for indoor blower unit, complete all are specified and directed.
Material and labour for Rewinding of single phase 1 HP motor with super enameled copper wire with existing size suitable for indoor blower unit all are specified and directed.
Material and labour for Rewinding of Three phase induction motor 5 HP to 7.5 HP with super enameled copper wire with existing size suitable for induction motor out door/ indoor unit all are specified and directed.
Material and labour for Rewinding of Three phase induction motor 1 HP to 3 HP with super enameled copper wire with existing size suitable for induction motor out door/ indoor unit all are specified and directed.
CHINAR CONSTRUCTION TRADERS
M/S LATIF AHMAD MIR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .