| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | +0.00% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 L+₹4,944.73 (0.99%)Admitted-Finance | +0.99% | ₹5.0 L+₹4,944.73 (0.99%) | L2 | Admitted-Finance |
| 3 | L3₹5.0 L+₹5,444.19 (1.09%)Admitted-Finance 0 5 DURGAPUR COLONY KOLKATA 53 | KOLKATA | WEST BENGAL | +1.09% | ₹5.0 L+₹5,444.19 (1.09%) | L3 | Admitted-Finance |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
4 Aug 2026, 1:00 pmClosed
OFFICE OF EE(CIVIL)
THE KOLKATA MUNICIPAL CORPORATION 97 AND 98 GARFA MAIN ROAD
RENOVATION C.CONCRETE ROAD NEAR PRANTICKPALLY AREA AND ADJACENT PLACES UNDER KMC WARD NO. 107.
2026_KMC_1034280_2
KMC/EE(C)/BR-XII/107/25-26
Open Tender
CIVIL WORKS
Percentage
60 days
BOROUGH XII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
29 Aug 2026
24 Jul 2026
6 Aug 2026
24 Jul 2026
4 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means b) Cement Concrete ( Ref :PWD (Rds & Brdgs)-2018, It. No. 2.05 Page No.233) | - | M3 | 399 | - |
| 2 | Labour for taking out old soling edging including removing debris. (a) Single flat soling ( Ref :PWD (Bldg.)-2017, It. No. 15, Page No. 230) | - | %M2 | 9.81 | - |
| 3 | Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. ( Ref :PWD (Bldg.)-2017, It. No. 2, Page No. 14) | - | SQM | 40 | - |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | - | SQM | 361 | - |
| 5 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-4) | 0.2 | M3 | 1,172.6 | ₹234.52 |
| 6 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety ( Ref :PWD (Bldg.)-2017, page-24 (item -4(a), consumption chart pg-B-60, sl-1 and Annexture-II , Format-A, 3rd Corrigenda & addenda p-10 dtd-04.06.2018, PWD(R&B) 2018, Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | - | M3 | 5,732.59 | - |
| 7 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | - | EA | 1,758.9 | - |
| 8 | Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | - | EA | 1,507.28 | - |
| 9 | Sub Total | - | - | - | - |
| 10 | GST 18% | - | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
PREQUE.pdf
Additional Documents • 0.17 MB
BOQ_2540258.xls
BOQ • 0.28 MB
FORM-107_162.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .