Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | ₹6.3 L | L1 | Accepted-AOC workorder |
| 2 | L2₹6.5 L+₹15,498 (2.45%)Rejected-Finance | ₹6.5 L+₹15,498 (2.45%) | L2 | Rejected-Finance L2 |
Tender Value
₹7.5 L
EMD Value
₹14,902
Closing Date
15 Sept 2026, 4:00 pmClosed
The Executive Engineer, BRC, PWD., Puducherry.
Office of the Executive Engineer, BRC, PWD., Puducherry
Engaging men and machineries for lifting, immersion of Idols and cleaning the beach road towards Vinayagar Chaturthi for the year 2026 Puducherry
2026_PWDC1_22841_1
16/PW/BRC/26-27
Open Tender
Civil Works - Others
Percentage
10 days
Puducherry
Please refer the tender documents
3 documents required · 3 mandatory
₹525
₹14,902
21 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
15 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and filling with gravel (excluding rock) in trenches, plinth, sides of foundations etc . In layers not exceeding 20 cm in depth consolidating each deposited layers by ramming and watering etc .complete including all lead and lift | 410 | Cum | 858.85 | ₹3,52,128.5 |
| 2 | Supply of Quarry rubbish including stacking to department gauge for premeasurement and spreading required thickness | 70 | Cum | 846.46 | ₹59,252.2 |
| 3 | Hire charges towards engaging machineries for desilting, cleaning, clearing the vegetation and floating materials including loading/depositing on the bank/bund. The rate includes the cost of hire and running charges of machineries, labour charges for operating staff, incidental charges GST and all other taxes and overheads etc., complete Excavator 60 Capacity | 100 | Hour | 1,000 | ₹1,00,000 |
| 4 | Hire charges towards engaging machineries for desilting, cleaning, clearing the vegetation and floating materials including loading/depositing on the bank/bund. The rate includes the cost of hire and running charges of machineries, labour charges for operating staff, incidental charges GST and all other taxes and overheads etc., complete. Excavator 120 Capacity | 15 | Hours | 1,400 | ₹21,000 |
| 5 | Hire charges for engaging front end loader of 1 cum capacity for removing and loading the buses/tree branches and debris etc from the road side berms and medians. The rate shall include the hire charges of machinery, operating staff, fuel charges, lubricants and all taxes etc., complete as directed by the Engineer-in-charge. | 15 | Hours | 1,370.57 | ₹20,558.55 |
| 6 | Engaging of Mazdoor for cleaning solid waste from road sides/street sides including loading into tractor with trolley, unloading and all taxes etc., complete as directed by the Engineer-in-charge. | 50 | No | 1,027.93 | ₹51,396.5 |
| 7 | Hire charges for engaging long Boom crane 50 M.T. capacity for lifting heavy materials for shitting. The rate shall include the hire charges of machinery operating staff ad cleaner salaries fuel charges lubrications etc., complete as directed by the Engineer in charge. During day and night time | 30 | Hours | 4,692 | ₹1,40,760 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
Tendernotice_2.pdf
PDF • 1.22 MB
Tendernotice_3.pdf
PDF • 0.36 MB
BOQ_23287.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .