Tender Value
₹80.7 L
EMD Value
₹1.6 L
Closing Date
13 Feb 2026, 10:45 pmClosed
Minor Irrigation Department
EXECUTIVE ENGINEER
CONSTRUCTION OF CHECKDAM
MI/2025-26/DA/WORK_INDENT10701
MI/2025-26/DA/WORK_INDENT10701
Open
Dam and Allied works
Two Tender Document System(Two Cover)
Minor Irrigation Division Mandya
9 documents required · 9 mandatory
The intending bidder Satisfactory completed (at least 90% of the contract value), as a prime contractor for at least one similar work such as Construction of Check dam /Bridge cum Barrage of value not less than Rs 40.33 lakhs (Value 50% of the Estimated Cost put to tender) during the last five financial years from 2020-21 to 2024-25. An additional weightage of 10% for each year will be added to the cost of work done to bring it to the 2025-26 price level. Certificates should be obtained from the officer not below the rank of Executive Engineer or equivalent/above the rank of government department.
Each Tenderer in its name should have in the last five years i.e.2020-21, 2021-22, 2022-23, 2023-24 and 2024-25 ,Executed in any one year (for a continuous period of 12 months) the minimum quantities of work (usually 80% of annual requirement) for works costing up to Rs.100.00 lakhs,01.Earthwork excavation, Embankment, filling and Desilting (Combined Quantity)-6820.00cum. 02 Cement Concrete both PCC and RCC (Combined Quantity)-690.00cum 03.Fabrication of reinforcement steel -7.50 tonne
Valid registration certificate
List of existing commitments and ongoing works
List of works for which tenders already submitted
valid GST Registration Details
The intending bidder should have achieved in at least two financial years an average annual financial turnover (in all classes of civil engineering construction works only) of Rs. 80.67 Lakhs(usually not less than the estimated cost under this contract for works costing up to 100 Lakhs) in the last five years period i.e. 2020-21 to 2024-25. Additional weight age at 10% for each year will be added to the financial turnover to bring it to the 2025-26 price level. Annual Turnover Certificate along with Balance sheet certified/attested by Chartered Accountants should be uploaded with 18-Digits system generated unique number UDIN Number
Liquid assets and /or availability of credit facilities of not less than Rs 24.20 Lakhs (Credit lines/letter of credit/certificates from banks for meeting the fund requirement etc.) in the Prescribed Format
Contractor should produce the updated G.S.T Clearance Certificates, IT Returns, Profit and Loss Statements along with balance sheets issued by Chartered Accountant for the years from 2020 TO 2024-25
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Banker Details for reference
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five years
Item Rates are Exclusive of GST and amount to tender is also Exclusive of GST hence the contractor should quote his/ her rate Exclusive of GST.
The Bidder shall quote Rates WITHOUT adding GST for either materials or works Contract (Service)GST payable by the contractor under this work/contract will be paid to the contractor.
Latest Address and contact number for communication to be furnished
₹2,020
₹1.6 L
13 Feb 2026
6 Feb 2026
16 Feb 2026
10 Feb 2026
CONSTRCUTION OF CHECKDAM ACROSS HALLA FLOWING NEAR MANCHAMMAS LAND IN NANDHIPURA VILLAGE IN MALAVALLI TALUK MANDYA DISTRICT
VOL3,IN2.5 ii B Clearing and Grubbing Road Land.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ear... 270.00 100 Sqm
VOL3,IN8.2.1 Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations comple... 250.00 Each
VOL4P2,IN3.12 De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) includin... 6600.00 Cum
VOL1,IN1.14.1 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li... 691.83 Cum
VOL1,IN1.15.1 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li... 202.09 Cum
VOL4P1,IN2.13 Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of a... 101.05 Cum
VOL4P2,IN1.12. Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates a... 760.37 Cum
VOL1,IN2.11h Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin... 9.33 t
VOL3,IN12.2 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with s... 176.00 m
VOL4P1,IN3.41.2 Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, h... 88.00 Sqm
VOL4P2,IN1.8 Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed an... 127.50 Cum
VOL4P1,IN3.3 Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, ma... 875.00 Cum
VOL3,IN12.3 a Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification.complete with all lead and lift including Machineries loading and unloa... 150.60 Cum
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
ECV.jpeg
Instructions to Tenderers • 0.21 MB
Royalty Circular.pdf
Instructions to Tenderers • 4.41 MB
KW-3-NANDIPURA-10701.doc
Tender Document • 7.71 MB
star_rates.pdf
Instructions to Tenderers • 2.13 MB
mineral dispatch permit.zip
Instructions to Tenderers • 6.45 MB
FD417EXP-12-2024-Dtd-09-08-2024.pdf
Instructions to Tenderers • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .