| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC 6 104 MADATHUPALAYAM THOPPAMPATTI DHARAPURAM 638656 | TIRUPPUR | TAMIL NADU | 638656 | ₹2.1 Cr | L1 | Accepted-AOC Lowest Quoted |
| 2 | L2₹2.1 Cr+₹1.1 L (0.55%)Accepted-AOC | ₹2.1 Cr+₹1.1 L (0.55%) | L2 | Accepted-AOC Highest Quoted |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-The contractor has not attached the affidavit and the lease document for equipment and machineries has expired |
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
12 Aug 2022, 3:00 pmClosed
PROJECT DIRECTOR
DRDA, COLLECTORATE, TIRUPPUR.
T03-Pallavarayanpalayam to Pongalur Via R.Pudupalayam
2022_RDTN_119415_1
TN31191
Open Tender
Civil Works - Roads
Item Rate
270 days
PONGALUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4.1 L
DRDA, COLLECTORATE, TIRUPPUR.
31 Oct 2022
13 Jul 2022
12 Aug 2022
13 Jul 2022
12 Aug 2022
13 Jul 2022
27 Jul 2022
Amount
1.Upgradation to the road from Palavarayanpalayam to Pongalur (Via) R.Pudhupalayam Km 0/0- 3/190
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Scarfing the existing bituminous road surface to a depth of 150 mm and disposalof scanfied material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Construction of 1.50m RCC Slab Culvert @ Ch 30 , 660 , 980 , 1320 , 2044 of Pallavarayapalayam to Pongalur (via) R.Pudhupalayam Road
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Supplying and filling foundation and basement with filling sand in layers not more than 15 cm thick well rammed , wateed and compacted complete complying with satndard specifications and as directed.
Cement concrete 1:2.5: 5 mix using M15 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., BELOW SILL LEVEL
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., ABOVE SILL LEVEL
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc.,
Cement concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges , centering and shuttering but including curing and shall be finished smooth with CM 1:3 , 12 mm thick and with kraft paper without claiming as extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabricating and placing in position MS steel or ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification( mS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contractor.
providing and fixing 20mm thick compressible fibre board
Providing and fixing Tar Paper for bearing Between Bed block and deck slab
Providing weepholes in brick masonry / stone masonry , plain/ reinforced concrete abutment , wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20 (H) towards drawing face complete as per drawing and technical specifiaction cluses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete complying with satndard specification and as directed by the departmental officer.
Construction of 2.00m RCC Slab Culvert @ Ch 1765 , 2460 of Pallavarayapalayam to Pongalur (via) R.Pudhupalayam Road
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Supplying and filling foundation and basement with filling sand in layers not more than 15 cm thick well rammed , wateed and compacted complete complying with satndard specifications and as directed.
Cement concrete 1:2.5: 5 mix using M40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., BELOW SILL LEVEL
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., ABOVE SILL LEVEL
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complying with satndard specifications and as directed., ABOVE SILL LEVEL
Cement concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges , centering and shuttering but including curing and shall be finished smooth with CM 1:3 , 12 mm thick and with kraft paper without claiming as extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabricating and placing in position MS steel or ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification( mS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contractor.
providing and fixing 20mm thick compressible fibre board
Providing and fixing Kraft Paper for bearing Between Bed block and deck slab
Providing weepholes in brick masonry / stone masonry , plain/ reinforced concrete abutment , wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20 (H) towards drawing face complete as per drawing and technical specifiaction cluses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete complying with satndard specification and as directed by the departmental officer.
Construction of Protective work @ Ch 35-65 , 1750-1780, 2070-2090, 2280-2315, 2500-2660 of Pallavarayapalayam to Pongalur (via) R.Pudhupalayam Road
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Cement concrete 1:2.5: 5 mix using M15 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., BELOW SILL LEVEL
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., ABOVE SILL LEVEL
Providing weepholes in brick masonry / stone masonry , plain/ reinforced concrete abutment , wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20 (H) towards drawing face complete as per drawing and technical specifiaction cluses 614,709,1204.3.7
providing and fixing 20mm thick compressible fibre board
Construction of CC Drain with Cover Slab Culvert at CH 2980 of Pallavarayapalayam to Pongalur (via) R.Pudhupalayam Road
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting sectioning the street to lay concrete pavement per SS 20 A
For Drain
Cement concrete 1:2.5: 5 mix using M15 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
For Drain
Cement concrete 1:2:4 mix using M20 mm Grade HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., ABOVE SILL LEVEL
For Drain
Supplying and fabricating and placing in position MS steel or ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification( mS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contractor.
For Drain
Cement concrete 1:1.5:3 using M25 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges , centering and shuttering but including curing and shall be finished smooth with CM 1:3 , 12 mm thick and with kraft paper without claiming as extra as directed by the departmental officers complete complying with standard specifications.
For Drain
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
For Drain
Dismantling Existing CD Work @ at CH 1765, 2460 of Pallavarayapalayam to Pongalur (via) R.Pudhupalayam Road
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
Removing all type of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismandling of Masonry works as per Technical Specifications Clause 202.
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeding vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground levels as per drawings and Technical Specification Clause 801
Poviding and fixing logo board
90cm Octozonal triangle(Cautionary sign Board)
60cm Circular(Mandatory)Sign board
Reflector
Road Making with hot applied thermoplastic compound with reflectorising glass beads on bituminous surface
Providing and fixing Citozen information board
Providing and fixing Name board
Providing and fixing maintanance board
Provision for Km stone
Ordinary Hm stone(Precast)
Maintenanace I year
Maintenanace II year
Maintenanace III year
Maintenanace IV year
Maintenanace V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Amman Construction
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .